Mitsubishi, Combined Cycle Power Plant, 2001, 360 MW, Natural Gas, 50 Hz

Description

  1. Overview
    1. Acquire the 360 MW combined cycle power plant—a modern, efficient, and well-maintained asset that can be relocated and re-energized for power generation project immediately needed.
    2. The 360 MW power plant is a combined cycle gas turbine (CCGT) facility, which was built by a US energy business conglomerate and became operational in 2001.
    3. Its original 22-year power purchase agreement expired in November 2023, and after its expiration, the government has not been purchasing power from it, although the plant is preserved and is ready for operation.
    4. The plant remains in excellent operational condition and is fully maintained in standby mode.
    5. This is a rare opportunity to acquire a high-efficiency combined cycle plant—ready for immediate dismantling, shipment, and reinstallation at your desired location.
    6. Operational history: commissioned in December 2001. Its 22-year initial contract expired in November 2023.
    7. Ownership: originally built by a US company, it is now owned by another internationally reputed company.
    8. Current status: the power purchase agreement (PPA) expired in November 2023, and the government has not been purchasing electricity from the plant since then.
  2. Key Technical Features
    1. Total capacity: 360 MW (combined cycle)
    2. Technology: proven and reliable OEM package (Mitsubishi)
    3. Fuel type: natural gas
    4. Efficiency: over 50% net plant efficiency
    5. Configuration: Mitsubishi gas turbine and Fuji steam turbine
    6. Maintenance history available if required
    7. Operation history: well-maintained under contractual operation with the government.
    8. Status: decommissioned, fully intact, and preserved for relocation
  3. Plant Condition
    1. Comprehensive maintenance history and OEM service records available
    2. Controlled shutdown and systematic preservation post-PPA expiry
    3. Major equipment (turbines, HRSGs, generators, transformers, control systems) in sound condition
    4. Auxiliary systems, balance-of-plant, and spares available
  4. Ideal For
    1. Independent power producers (IPPs) looking for proven assets with reduced lead time
    2. Government or private utilities planning quick deployment of medium to large-scale gas-based generation
    3. Projects in regions with natural gas or LNG infrastructure
  5. Scope Of Supply
    1. Complete power plant, including all major and auxiliary equipment
    2. Engineering documentation and operation manuals
    3. Dismantling, packaging, and relocation support (optional)