Description Inspection Summary Inspection date: November 10, 2025 Engines inspected: GE LM2500+ gas turbines Frequency: 50 Hz Method: Visual examination (borescope) using Olympus IPlex NX Ø6mm × 5 m Scope of Inspection Compressor section: stages 0–2, 11–12 Combustor (including fuel nozzles) High-pressure turbine (HPT) section Power turbine – 1st stage nozzles Inspection ports used: engine 565-103: 19 ports (#2, #3, #12, #13, #17A–H, #19, #20A–D, #20F–I) Engine 565-104: 18 ports (#2, #3, #12, #13, #17A–H, #19, #20A–D, #20F–I) Results Compressor section: no abnormalities Combustor (incl. nozzles): no abnormalities HPT section and power turbine 1st stage nozzle: no abnormalities Compressor section: no abnormalities Combustor (incl. nozzles): no abnormalities HPT section and power turbine 1st stage nozzle: no abnormalities Technical Notes Surface condition: uncleaned (as-is) Illumination: >1,076 lx (adequate for fine defect detection) Judgement standard: QT-QS-091, rev. 5 Final judgement: both turbines “no reportable indications” (defect-free) Archival and Business Value Confirms both LM2500+ turbines are in sound condition with no defects. Provides photographic evidence and diagrams (22 pages total). Serves as official documentation for maintenance records, warranty claims, operational readiness certification, or dispute resolution. In short: both GE LM2500+ turbines passed borescope inspection with no abnormalities detected. SpecificationsHours: less than 20,000Full package cost price usd: 18024950.0Full package sale price usd: 20024950.0