General Electric, LM2500+, 1999, 25 MW, 50 Hz, Gas Turbine

Description

  1. Inspection Summary
    1. Inspection date: November 10, 2025
    2. Engines inspected: GE LM2500+ gas turbines
    3. Frequency: 50 Hz
    4. Method: Visual examination (borescope) using Olympus IPlex NX Ø6mm × 5 m
  2. Scope of Inspection
    1. Compressor section: stages 0–2, 11–12
    2. Combustor (including fuel nozzles)
    3. High-pressure turbine (HPT) section
    4. Power turbine – 1st stage nozzles
    5. Inspection ports used: engine 565-103: 19 ports (#2, #3, #12, #13, #17A–H, #19, #20A–D, #20F–I)
    6. Engine 565-104: 18 ports (#2, #3, #12, #13, #17A–H, #19, #20A–D, #20F–I)
  3. Results
    1. Compressor section: no abnormalities
    2. Combustor (incl. nozzles): no abnormalities
    3. HPT section and power turbine 1st stage nozzle: no abnormalities
    4. Compressor section: no abnormalities
    5. Combustor (incl. nozzles): no abnormalities
    6. HPT section and power turbine 1st stage nozzle: no abnormalities
  4. Technical Notes
    1. Surface condition: uncleaned (as-is)
    2. Illumination: >1,076 lx (adequate for fine defect detection)
    3. Judgement standard: QT-QS-091, rev. 5
    4. Final judgement: both turbines “no reportable indications” (defect-free)
  5. Archival and Business Value
    1. Confirms both LM2500+ turbines are in sound condition with no defects.
    2. Provides photographic evidence and diagrams (22 pages total).
    3. Serves as official documentation for maintenance records, warranty claims, operational readiness certification, or dispute resolution.
    4. In short: both GE LM2500+ turbines passed borescope inspection with no abnormalities detected.
  6. Specifications
    1. Hours: less than 20,000
    2. Full package cost price usd: 18024950.0
    3. Full package sale price usd: 20024950.0