GE, PG5341, Gas Turbine Package, 25 MW, 50 Hz, Dual Fuel

Description

  1. Overview
    1. Ge frame 5m pg5341 class 25 mw gas turbine package
    2. Pre-owned and available for immediate sale
    3. This unit offers strong value for entry-level buyers and for deployment in developing regions where reliable, serviceable power generation is essential, including data storage and industrial baseload applications
    4. This is a rare opportunity to acquire a fully documented, upgraded, and well-maintained ge frame 5m at an attractive price point
    5. It offers a reliable and proven 25 mw ge platform suitable for a wide range of applications and is particularly well-suited for buyers in less advantaged markets seeking dependable power infrastructure
  2. Specifications
    1. The turbine is a ge frame 5001m upgraded to pg5341 class, delivering approximately 25 mw at 50 hz
    2. It operated primarily on natural gas, with all gas components still available and retains full dual fuel capability
  3. Operating History
    1. The unit has accumulated 80611 fired hours with 608 starts and 100 trips
    2. The turbine was shut down on 31 december 2025 and is currently preserved in condition 2+
  4. Condition and Maintenance
    1. Despite the high operating hours, the machine remains in excellent condition due to consistent maintenance, a complete instrumentation and control renewal in 2010, and a ge overhauled rotor with only approximately 200 hours since overhaul
    2. The last maintenance was completed in june 2023, including filter exchange and a full borescope inspection
    3. It remains complete and functional but is electrically disconnected from the grid
  5. Documentation and Records
    1. All service records, upgrade documentation, and historical reports are available, including the ge repair report for the 2007 compressor incident
  6. Included and Logistics
    1. Dismantling, packing, and export preparation will be at the buyer’s cost
    2. The seller can support with site access, technical supervision, and recommended dismantling contractors