GE, Frame 7EA / 7B, 1970, Gas Turbine-Generator Packages, 600 MW Combined Total, Rebuilt to Zero-Hour Condition

Description

  1. Overview
    1. GE Frame 7EA / 7B gas turbine-generator packages
    2. GE Frame 7 fleet
    3. Equipment & refurbishment package summary
    4. 8 gas turbine-generator packages
    5. Approximately 600 MW combined total
    6. Full overhaul & upgrade program
    7. Rebuilt to zero-hour maintenance condition
  2. Package Overview
    1. This document summarizes the equipment specifications and refurbishment scope for an eight-unit GE Frame 7 gas turbine-generator fleet.
    2. The fleet consists of four (4) GE Frame 7EA units and four (4) GE Frame 7B units, each supplied as a complete power generation package including the gas turbine, generator, controls, and auxiliary systems.
    3. Approximately 600 MW combined total
  3. Availability
    1. 4 × Frame 7EA units: available Q4 2027
    2. 4 × Frame 7B/E units: available Q1 2028
    3. Approximately 600 MW combined total
  4. GE Frame 7EA Units – Individual Specifications
    1. Four (4) GE Frame 7EA gas turbine-generator packages are included, as follows:
    2. 7EA turbine models: PG7121EA, PG7121EA, PG7121EA, PG7111EA
    3. Year of manufacture: 2008, 2008, 2015, 1989
  5. Specifications
    1. Fuel system: Gas-only fuel system
    2. Combustion system: DLN 1.0 dry low NOx combustion system
  6. Condition & Refurbishment Scope
    1. All eight units are subject to a comprehensive overhaul and upgrade program to be carried out by a third-party refurbishment contractor.
    2. The program is intended to bring the units to zero-hour maintenance condition, with performance warranties on output and heat rate at ISO conditions.