GE, Frame 7EA / 7B, 1970, Gas Turbine-Generator Packages, 600 MW Combined Total, 8 Units

Description

  1. Overview
    1. GE Frame 7EA / 7B gas turbine-generator packages.
    2. 8 gas turbine-generator packages.
    3. Approximately 600 MW combined total.
    4. GE Frame 7 fleet — equipment and refurbishment package summary.
    5. Full overhaul and upgrade program.
    6. This document summarizes the equipment specifications and refurbishment scope for an eight-unit GE Frame 7 gas turbine-generator fleet.
    7. The fleet consists of four (4) GE Frame 7EA units and four (4) GE Frame 7B units, each supplied as a complete power generation package including the gas turbine, generator, controls, and auxiliary systems.
  2. Fleet Composition and Availability
    1. 4 × Frame 7EA units: available Q4 2027.
    2. 4 × Frame 7B/E units: available Q1 2028.
  3. GE Frame 7EA Units – Individual Specifications
    1. Four (4) GE Frame 7EA gas turbine-generator packages are included.
    2. 7EA turbine models: PG7121EA, PG7121EA, PG7121EA, PG7111EA.
    3. Year of manufacture: 2008, 2008, 2015, 1989.
  4. Condition and Refurbishment Program
    1. Rebuilt to zero-hour maintenance condition.
    2. All eight units are subject to a comprehensive overhaul and upgrade program to be carried out by a third-party refurbishment contractor.
    3. The program is intended to bring the units to zero-hour maintenance condition, with performance warranties on output and heat rate at ISO conditions.
  5. Scope of Supply
    1. Each unit supplied as a complete power generation package.
    2. Gas turbine.
    3. Generator.
    4. Controls.
    5. Auxiliary systems.