Frame 9e gas turbine package pg9171 with sequential dln and power augmentation
Gas turbine model frame 9e
Brand: GE
Year of manufacturing: 2009
Certificate module: A
Ped/model/category: G/IV
Nobo number as per installation in 2010: 38
Nominal speed: 3000 rpm
Net power output as per original specification: 127.214 mwe
Unit date of installation/commissioning: 2010
Generator Specifications
Generator model: BDAX-450ERH
Brand: Brush Electrical Machines Limited England
Type: Turbo generator
Protection: Class IP55
Spec: I.E.C 60034-3
Ambient temperature: 15 degrees Celsius
Altitude: Up to 1000 m
Output: 3000
Voltage: 15000
Amps: 6199
P.F: 0.8
Gas Turbine Condition
Currently operating / standby: Preservation
Date of decommissioning / stop: 2015
Total factored fired hours (FFH): <500 FFH
Total factored fired starts (FFS): <100 FFS
Date of last major inspection: 32 K when power augmentation is disabled
Type of fuel: Natural gas
Mode of operation: Not applicable
Type of control system: Mark Vles, SIL
Report of last major (or HGP) inspection performed in the engine with rotor in place: Not applicable
Gas Turbine and Generator Condition
The gas turbine and generator have been last inspected in 2018 and were found to be in excellent condition. Since then, the unit and equipment have been enrolled in a preservation program to maintain the condition as was found in 2018. It is expected that the preservation program has led to a stable condition and that no degradation has taken place since 2018. A borescope inspection has been planned to confirm the expected condition of the equipment.
The unit was installed in 2010 and commissioned in 2011, after a short testing period the unit was preserved until 2015. In 2015 the gas turbine was upgraded with late lean injection (LLI) and fully re-commissioned including performance test. Late lean injection enables emissions compliance at low loads resulting in an improved turndown. Due to technical constraints of the oil production system the unit was preserved again up till 2018. In 2018 another upgrade was installed enabling power augmentation with the means of steam which is extracted from the HRSG. Both upgrades are currently commercially available, more detailed information can be requested from company (under precondition).
History
2009: Year of production
2010: Installation of equipment
2011: Commissioning of equipment
2011 to 2015: Equipment mothballed
2015: NPI upgrade LLI
2015 to 2018: Equipment mothballed
2018: NPI upgrade power augmentation; steam injection wrapper
2018 to today: Equipment mothballed
Upgrades
In 2015 LLI was installed under a NPI program of GE, high level overview of impacted parts:
Wrapper modification to allow for fuel piping
Modification of transition pieces with “headset” for secondary combustion
Upgrade to 24K combustion hardware
DLN skid; additional fuel valve and piping to allow for LLI
In 2018 power augmentation was installed under a GE NPI program, high level overview of impacted parts:
Wrapper modification to allow for steam injection to compressor air
Steam injection control system and piping
Installation of combustion dynamics monitoring
Upgrade to 32K combustion hardware
Upgrade of Mark VIes
Upgrade of generation protection panels
New HMI’s
Preservation Program
Since the installation of the equipment, there have been several periods in which the equipment has been mothballed. The preservation program entails amongst others:
Closed off air intake and exhaust duct allowing for closed loop air circulation (dried and heated)
Oil systems active, automated temperature-based activation
Space heaters are active
HVAC systems are active
Stand still heating generator online
Periodic oil sampling
Nitrogen blanketed piping
Monthly operation of auxiliary equipment
Bi-weekly and monthly inspections
The rotor is not rotated as part of the preservation program to prevent damage to bearings and rotor
Scope of Supply
Gas turbine
Gas turbine lube oil system
Hydraulic oil system
Inlet guide vane system (trip oil) system
Air inlet and exhaust
Performance monitoring
Cooling and sealing air system
Gas fuel system
Gas turbine auxiliary systems
Cooling water system
Compressor washing system
Heating and ventilation systems
Fire protection system
Hazardous gas protection system
Starting system
MK VIes control system
Generator
Additional spare parts/tools
No break unit (as part of the PECC container)
PECC container
Interconnecting piping and cables GT
Enclosures for the GT system
Boiler feed water pumps for HRSG including VSDS (9101A/B): optional
Power augmentation system (steam)
Natural gas pressure reduction and heating station of the GT, the unit 9310, 2 gas heaters (by hot water)
Generator cooling system, the unit 9510. “CCCW systems (2 pump, 40% glycol/water), air cooler, expansion vessel
Heating system for anti-icing GT (9520 unit). 2 pumps (40% glycol/water), heater (via steam) and expansion vessel
Wobbe meters: optional
Enclosures of the GT (within the GT building)
Internal civil constructions/supports
Supports (e.g. steel grating/stairs/ and handrails)
Systems: out scope
Compressor building and building ventilation, exhaust stack
Foundation (removal)
Transformer TR 9001 and TR-9002 to grid
High voltage cables (busduct) from generator to the 2 trafo (outside building)
Overhead crane 50 T
Generator circuit breaker
Request a Quote
✓
Request sent
Thank you, our team will reply to you shortly.
Direct access to our team
Email American Plant & Equipment
Tell us what you want to buy, source, finance, or sell. A machinery specialist will follow up with you.
✓
Thank you. Your request is with the American Plant and Equipment team.
A machinery specialist will follow up with you.
Machinery updates
Subscribe to our email list
Tell us which industries you follow and we will send you the machines that match.
✓
You are on the list.
We will email you when machines that match your interests come in. Unsubscribe from any message.