Maintenance: Combustion inspections performed at 4,004 hours and 5,470 hours
Status: Dismantled
Gas Turbine Technical Specifications
Model: PG6561B (GE Frame 6B)
Key parameters (39 MW version)
Rated power: 39 MW
Fuel: Light oil / natural gas (dual fuel)
Voltage: 10.5 / 11 kV
Frequency: 50 Hz
Operating hours: ~6,000 hours
Simple cycle efficiency: ~33%
Exhaust temperature: ~532°C (990°F)
Output power (natural gas): 38,700 kW
Typical Applications
Captive / self-owned power plant for industrial parks
Urban distributed energy station
Power and heat supply for petrochemical, oil refining, and chemical plants
Low calorific value (LCV) gas power generation for steel mills
Peak-shaving power plant / standby power
Isolated grid (island mode) operation and independent power stations for remote areas
Unit / Machine Advantages
Proven and reliable: over 45 years of global service, with more than 1,200 units installed and cumulative operation exceeding 100 million hours; availability of 98%+.
Maintenance-friendly: modular combustion system, well-defined inspection intervals, common/spare parts interchangeability.
Fast start-up and stable load capability: well suited for peak shaving, standby power, and island-mode operation; supports rapid start-stop cycles.
Strong CHP / cogeneration adaptability: stable exhaust parameters and high waste heat recovery efficiency, making it ideal for distributed energy and district / campus heating.
Significant upgrade potential: can be retrofitted with dry low NOx (DLN) combustion, efficiency improvement packages, life-extension services, and hydrogen blending / fuel-flexibility modifications.
Operational History
Commissioned in July 2003
Total starts: 534
Fired starts: 497
Total operating hours: 6,201 h
Light oil operation: 5,582 h
Natural gas operation: 619 h
Forced trips: 21
Last reported in normal operational condition before dismantling
Maintenance History
November 2004 (4,004 operating hours): combustion inspection performed (transition pieces not removed); crossover ignition tubes between two pairs of combustion cans replaced; one combustion liner (flame tube) replaced
April 2006 (5,470 operating hours): combustion inspection completed
Request a Quote
✓
Request sent
Thank you, our team will reply to you shortly.
Direct access to our team
Email American Plant & Equipment
Tell us what you want to buy, source, finance, or sell. A machinery specialist will follow up with you.
✓
Thank you. Your request is with the American Plant and Equipment team.
A machinery specialist will follow up with you.
Machinery updates
Subscribe to our email list
Tell us which industries you follow and we will send you the machines that match.
✓
You are on the list.
We will email you when machines that match your interests come in. Unsubscribe from any message.