Cleaver Brooks, 600 HP, 1995, 4-Pass Dry-Back, 150 PSI

Description

  1. Overview
    1. Four pass dry-back boiler
    2. Fired by natural gas and no. 2 oil
    3. 150 psi design pressure
  2. Condition and Preparation
    1. Fireside, waterside, and outside will be cleaned and painted
    2. New fireside and waterside gaskets will be installed
    3. Pressure vessel, tubes, trim piping, blowdown piping, and valves will be hydrostatically tested
    4. Boiler will be electrically and mechanically checked throughout to identify and replace any defective components
    5. Guaranteed that the pressure vessel and tubes are in good condition and that the boiler will pass a hydrostatic test at the time of startup
  3. Controls and Components
    1. New Fireye burner logic flame safeguard controls will be installed
    2. New Honeywell high limit with manual reset, operating shipped loose for field installation
    3. One-year parts replacement warranty on the controls