NovaStar, PC327, Pillow Filling Machine, 4 Nozzles, 800 kg/hr Capacity, 37 kW (New)

Description

  1. Overview
    1. For polyester staple fiber opening and filling into upholstery cushions or pillows.
    2. Capacity 800 kg per hour x 400 hours per month = 320,000 kg per month at 100% efficiency.
    3. With a mixing chamber in which the upholstery manufacturer can add other materials, such as foam pieces, feathers, wool fibers into the pillows or cushions during filling.
    4. Principle of filling unit: blowing.
  2. Specifications
    1. Floor space required: about 36 square meters (360 square feet).
    2. Total installed power: 37 kW with hopper.
    3. Electronic components - make and type: all the electronic components are Schneider (brand).
    4. Voltage: as per customer.
    5. Air pressure: <0.5 MPa.
  3. Model 1013 Mixing Chamber For 3 Filling Fan Capacity
    1. With 4 kW motor with gear reduction.
  4. Fiber Opener 1001-1000 (Wider Than Pic)
    1. Belt width: 1000 mm.
    2. Dimensions (mm) (LxWxH): 2050 x 1400 x 940.
    3. Main drum diameter 320 mm.
    4. 9 working cylinders diameter 56 mm each.
    5. Power: 6.75 kW.
    6. Net weight: 600 kg.
    7. Capacity: 120 - 150 kg/hr.
    8. Voltage: as per customer.
  5. Transfer Fan 503
    1. Dimensions (mm) (LxWxH): 610 x 520 x 800.
    2. Power: 2.2 kW.
    3. Net weight: 75 kg.
    4. Capacity: 850 kg/hr.
    5. Voltage: as per customer.
  6. Mixing Machine 1003-B
    1. Dimensions (mm) (LxWxH): 1840 x 1400 x 1680.
    2. Power: 5 kW.
    3. Net weight: 500 kg.
    4. Capacity: 850 kg/hr.
    5. Voltage: as per customer.
  7. Filling Station (Fan) 502, Four Filling Fans With Nozzle Clamps And With Tables
    1. Dimensions (mm) (LxWxH): 850 x 540 x 960.
    2. Power: 1.5 kW each = 6 kW total.
    3. Net weight total: 90 kg.
    4. Capacity: 150 - 200 kg/hr (each filling station fan) 800 per hour max.
    5. Voltage: as per customer.
    6. Air pressure: <0.5 MPa.
  8. Condition And Included Items
    1. No weigh pans included.
    2. Diagrams for floor space and electrical connections will be e-mailed to you within 40 days of receiving your deposit.
    3. Spare parts suggested: one spare fan, one spare opening cylinder, seven top carding cylinders, one motor for hopper, one motor for opening card, one motor for mixing chamber, one photocell for hopper.