Siemens Energy, SGT-400 DLE, 2019, 14.4 MW, Gas Turbine Package

Description

  1. Overview
    1. Siemens Energy SGT-400 DLE gas turbine package, 2019, 3 x 14.4 MW.
    2. Brand: Siemens Energy.
    3. Model: SGT-400 DLE.
    4. Year: 2019.
    5. Quantity: 3 unit.
    6. Capacity: 3 x 14.4 MW (43.2 MW).
    7. Voltage: 11 kV.
    8. Three Siemens Energy SGT-400 DLE twin-shaft gas turbine packages, year of manufacture 2019.
    9. Each package is complete, factory-tested, low-hour, and stored indoors.
    10. Each unit is independently inspectable.
  2. Specifications
    1. Manufacturer: Siemens Energy.
    2. Model: SGT-400 DLE.
    3. Year of manufacture: 2019 (installation and commissioning: 2020).
    4. Usage: approximately 242 hours and 26 starts (factory acceptance running only).
    5. Fuel: natural gas; feasibility of dual-fuel or liquid-fuel conversion to be assessed on request.
    6. Configuration: twin-shaft with dry-low-emissions (DLE) combustion system.
    7. Nominal ISO output: 14.3 to 14.9 MW (simple-cycle, 15 MW variant).
    8. Voltage and frequency: 11 kV, 50/60 Hz (60 Hz conversion available under a separate contract).
    9. Gross simple-cycle efficiency: approximately 35.6%.
    10. NOx emissions on gas fuel: 15 ppm or less at 15% O2.
    11. Package weight: approximately 40 t (44 short tons), power-generation skid.
    12. Acoustic enclosure noise level: 85 dB(A) at 1 m (3.3 ft).
    13. Weight: 40000
  3. Scope of Supply
    1. SGT-400 twin-shaft gas turbine core with can-annular DLE combustor.
    2. AC generator (11 kV class) or gear-coupling for mechanical-drive service, supplied to buyer's final specification.
    3. Modular skid packages including lube-oil, gas fuel, starter, ventilation, and silencers.
    4. Inlet filtration and exhaust stack with diverter damper.
    5. Siemens PCS 7 / S7-400 control system with HMI and remote-monitoring capability.
    6. Fire and gas detection and CO2 suppression installed in acoustic enclosure, 85 dB(A) at 1 m (3.3 ft).
    7. Complete technical library including P&IDs, wiring diagrams, QA records, and factory test certificates.
    8. Full documentation set for handover: maintenance logs, operating logs, original OEM certificates, preservation reports, and overhaul records, available in hard copy and digital format.
  4. Condition and Readiness
    1. Condition: low-hour, factory acceptance running only.
    2. All piping, cabling, and system connections are intact and available for on-site inspection.
    3. Units are stored indoors in a bonded warehouse and individually inspectable.
    4. Optional conversion of the turbines to 60 Hz operation is available under a separate contract.