Solar Turbines, Centaur 40, Natural Gas Turbine Power Package, 3.5 MW per Unit

Description

  1. Overview
    1. Solar Turbines Centaur 40 natural gas turbine power package, approximately 3.5 MW per unit and approximately 7 MW in total.
    2. The package is made up of two Centaur 40 gas turbines supplied together.
    3. Natural gas fueled.
    4. Used, and reported to have run approximately 30,000 hours.
  2. Specifications
    1. Manufacturer: Solar Turbines
    2. Model: Centaur 40
    3. Output: approximately 3.5 MW (3,500 kW) per unit, approximately 7 MW (7,000 kW) in total
    4. Fuel: natural gas
    5. Quantity: two units in one package
    6. Operating hours: reported approximately 30,000 hours
  3. Scope of Supply
    1. Two Solar Centaur 40 gas turbines
    2. Exhaust systems
    3. Gas-fired burner systems
    4. Associated electrical infrastructure
  4. Application
    1. Configured for venting, or for integration with steam generation systems.
  5. Condition
    1. Used