Alstom, GT13E2, 1994, 515 MW Combined Cycle Power Station, 2 x 167 MW Gas Turbines (MXL Upgraded) + Steam Turbine, 52% Efficiency

Description

  1. Overview

    1. First commissioned in November 1994

    2. Total output of 515 MW running at base load

  2. Gas Turbines

    1. Two Alstom GT13E2 gas turbines

    2. Each gas turbine weighs 350 tonnes (771,618 lb)

    3. Each gas turbine produces 167 MW

    4. Both gas turbines have undergone MXL efficiency upgrades

    5. Upgrades increased total plant efficiency to 52% (54% net electrical efficiency)

  3. Steam Turbine

    1. ABB/Alstom three-pressure steam turbine

    2. Combined HP/MP and dual flow LP

  4. Condition

    1. Condition: used

    2. Year: 1994

    3. Inspections: by appointment only

    4. Terms: lots sold as is, where is