Siemens, SGT-300, 2008, Gas Turbine Cogeneration Plant, 7.9 MW, 50 Hz, 6.3 kV, Natural Gas, DLE (Same as SE-1228)

Description

  1. Overview

    1. Industrial cogeneration and multigeneration plant based on a Siemens SGT-300 Tempest single-shaft gas turbine.

    2. Rated 7.9 MW ISO; 7.5 to 7.7 MW at site conditions.

    3. Designed for continuous 24/7 industrial operation.

    4. Year: 2008.

    5. Condition: used.

  2. Gas Turbine Specifications

    1. Natural gas fuel, about 25 MW LHV input.

    2. Dry low emission (DLE) combustion, very low NOx.

    3. Frequency: 50 Hz.

    4. Generator voltage: 6.3 kV; generator speed 1,500 rpm.

    5. Approximate electrical efficiency 30.5%; exhaust gas flow 30.2 kg/s at 542 to 545 C.

    6. Noise level 85 dB(A) or less at 1 metre.

  3. Control and Safety Systems

    1. Allen-Bradley ControlLogix PLC control system.

    2. Acoustic enclosure with automatic CO2 fire suppression.

    3. Automatic synchronisation, gas detection and monitoring systems.

  4. Heat Recovery and Multigeneration

    1. Complete heat recovery train with five heat exchangers: DOWNTHERM A thermal oil heater 4,300 kW; SANTOTHERM 66 thermal oil heater 3,880 kW; high-pressure steam generator (25 to 26 bar) 1,560 to 1,670 kW; low-pressure steam generator (4.5 bar) 1,930 kW; hot water generator 2,430 kW.

    2. Simultaneous production of electricity, high-pressure steam, low-pressure steam, thermal oil and hot water.

    3. Chilled water is possible with an absorption chiller, which is not included.

  5. Included Equipment

    1. Siemens SGT-300 turbine, gearbox, synchronous alternator.

    2. Lubrication, fuel, air intake and exhaust systems; electrical system and control panels; fire protection.

    3. Spare parts and the tooling needed for overhauls.

    4. Available technical documentation.

  6. Operating History and Condition

    1. Control screen shows 116,131 operating hours and 677 starts.

    2. Operational until shutdown in November 2025.

    3. New rotor June 2025; about 8,000 operating hours remaining until the next overhaul.

    4. Final scope and condition to be verified at inspection and documentation review.