Description Overview2017 new 0 hour 75 MWe Rolls-Royce Trent 60 combined cycle natural gas power plantCondition: new, 0 hours, never commissionedYear: 2017Total output: 75 MWelFrequency: 50 HzGas TurbineRolls-Royce Trent 60 DLE gas turbine60 MWel2017, never usedCombustion part still in its transport containerSteam CycleNooter/Eriksen heat recovery steam generatorSiemens SST-300 steam turbine, 15.75 MWel, newGEA air cooled condenserBalance of PlantFoxboro distributed control systemAlstom 154 kV switchyard, completed and connected to the national gridGas reducing and measuring station, 70 to 55.4 bar (1,015 to 803.5 psi)Water demineralization plantAll 2017, never commissionedProject StatusAbout 90% installed7% of the equipment in unopened wooden crates in warehouses3% still to be purchasedProject cancelled because of high gas prices and low electricity selling prices