Solar Turbines, Titan 130, 2025, Gas Turbine Cogeneration Package, 15 MW, 50 Hz, Natural Gas, 1,358 Hours, with Wulff & Umag Steam Boiler

Description

  1. Overview
    1. Solar Turbines Titan 130 gas turbine cogeneration package, built and commissioned 2025
    2. 15 MW, 50 Hz, natural gas
    3. 1,358 operating hours
    4. Fully enclosed indoor installation, part of a twin-line setup; original OEM documentation and commissioning logs
  2. Gas Turbine Generator Set
    1. Solar Titan 130 turbine package with acoustic enclosure on a skid-mounted base
    2. Leroy-Somer LSA60 MCSV115 generator, 19.5 MVA
  3. Thermal Recovery Package
    1. Wulff & Umag steam boiler, 20 bar (290 psi), 230 °C (446 °F), 45 t/h (99,208 lb/h) with supplementary firing
    2. Economizer 1 and economizer 2 for hot water / district heating
  4. Auxiliaries Included
    1. Combustion air filter housing and ducting
    2. Fuel gas pre-heating system
    3. Lube oil cooler module and oil mist eliminators
    4. Interconnecting piping within the skid and boiler boundary
    5. Exhaust chimney / stack
    6. OEM technical manuals, drawings and commissioning reports
  5. Not Included
    1. Feed-water storage tank and deaerator, boiler feed-water pumps
    2. Step-up / grid connection transformer
    3. Balance-of-plant supervisory control software, spare parts