Shin Nippon, 2006, 9 MW Coal/Lignite Fired Steam Power Plant, 42 TPH Boiler, 11-Stage Steam Turbine, 11 kV

Description

  1. Overview
    1. Used 9 MW coal/lignite fired steam power plant
    2. Year: 2006 (alternator 2007)
    3. Capacity: 9 MW
    4. Steam turbine by Shin Nippon (Japan)
  2. Steam Boiler
    1. Year: 2006
    2. Fuel: coal/lignite fired
    3. Steam capacity: 42 TPH (92,600 lb/hr)
    4. Heating surface area: 1,884.0 m2 (20,279 sq ft)
    5. Working pressure: 70 kgf/cm2 (996 psi)
    6. Design pressure: 84 kgf/cm2 (1,195 psi)
    7. Hydraulic test pressure: 105 kgf/cm2 (1,493 psi)
    8. Max steam temperature: 510 C +/- 5 C (950 F)
    9. Fuel feeding system
    10. Economiser
    11. Air preheater
    12. ESP: input voltage 415 V AC, output 120 kV DC
    13. Feed pump: 250 kW (335 hp)
    14. ID fan: 110 kW (148 hp)
    15. FD fan: 225 kW (302 hp)
    16. PA fan: 45 kW (60 hp)
  3. Steam Turbine
    1. Year: 2006
    2. Make: Shin Nippon, Japan
    3. Number of stages: 11
    4. Steam temperature: inlet 505 C (941 F), outlet 59 C (138 F)
    5. Steam pressure: inlet 65 kgf/cm2 (925 psi), outlet 0.20 kgf/cm2 (2.8 psi)
  4. Gear Box
    1. Year: 2006
  5. Alternator
    1. Year: 2007
    2. Generating output line: 11 kV
  6. Included Equipment
    1. Water treatment system: RO 8 m3 (283 cu ft)
    2. Control panel
    3. Supporting MS structure