Description Overview Combined gas power plant consisting of 100mw x 5 gas turbine generator sets and 150mw x 2 steam turbine generator sets Frequency: 60 hz Fuel: lng Built in: 1995 Stopped operation: middle of 2013 Gas Turbine Generator Set Manufacturer: westinghouse Model name: w501d5 Type: axial flow Power output: 100,000 kw (100 mw) Stages: 4 stage Inlet temperature: 1093 °c Exhaust temperature: 530 °c Exhaust flow: 1,313,272 kg/h Tac temperature: 15 °c Speed governor: dehc Starter system type: electric motor Starter system capacity: 1530 kw Combustor type: can-annular Combustor quantity: 14 ea Compressor type: axial flow Compressor air mass flow: 358 n㎥/min Compressor inlet temperature: 15 °c Compressor pressure ratio: 14:01 Compressor outlet pressure: 14.462 kg/㎠ Compressor stages: 19 stage Compressor outlet temperature: 389 °c Generator (Gas Turbine) Manufacturer: westinghouse (siemens) Type: oac (open-air-cooled) Rated power: 129 (143) mw (mva) Power factor / short-circuit ratio: 90% / 0.695 Frequency: 60 hz / 2 pole Speed: 3600 rpm Rated voltage / current: 13.8 kv / 5731 a Insulation class: f Exciter speed: 3600 rpm Exciter type: pmg Exciter rated voltage / current: 325 v / 1006 a Protection devices: 87g, 59gn, 40, 32, 46, 51v, 60, 25 Neutral grounding: ngr Bus bar: ipb (3 phases) Rotation direction: cw (viewed from exciter end) Operation Period (Gas Turbines) Gas turbine #2: 37,013 hours (1996.1 ~ 2013.6) Gas turbine #3: 39,800 hours (1996.1 ~ 2013.6) Gas turbine #4: 41,541 hours (1996.7 ~ 2013.6) Gas turbine #5: 41,819 hours (1996.7 ~ 2013.6) Gas turbine #6: 40,524 hours (1996.7 ~ 2013.6) Operation Hours From Overhaul to Stop (Gas Turbines) Gas turbine #2: 16,611 hours Gas turbine #3: 17,098 hours Gas turbine #4: 15,686 hours Gas turbine #5: 17,978 hours Gas turbine #6: 16,921 hours Supply List (Per Gas Turbine Set) Gas turbine Generator Control panel (electric package) Breaker Mechanical room equipment L/c t.r Steam Turbine & Generator Manufacturer: hitachi (japan) Year: 1971 Overhaul year: 1997 Type: tcdf reheat condensing 23 Power output: 150,000 kw Rotor speed: 3,600 rpm Number of stages: hp 6 / ip 7 / lp 5 Main steam pressure: 100.1 kg/ Main steam inlet temperature: 498.2 Reheat steam inlet pressure: 34.4 kg/ Reheat steam inlet temperature: 353.9 Reheat steam outlet pressure: 31.7 kg/ Reheat steam outlet temperature: 501.5 Exhaust pressure: 38 mmhg(a) Speed governor: electro-hydraulic governor Generator (Steam Turbine) Manufacturer: hitachi (japan) Year: 1971 Type: tflh Rated power: 150 mw (mva) Power factor: 85% / 0.58 Frequency: 60 hz / 2 pole Speed: 3600 rpm Rated voltage / current: 17 kv / 6,521 a Insulation class: b Exciter speed: 3600 rpm Exciter type: rotary rectifier Exciter rated voltage / current: 284 v / 1,060 a Protection devices: 87g, 64g, 59f, 40f, 46f, 32, 21g Neutral grounding: grounding transformer Bus bar: ipb (3 phase) Super Heater Max. operating pressure: 121 kg/44? Outlet pressure: 91.9 kg/29.5? Outlet temperature: 484.4 ? /303 ? Re-Heater Max. operating pressure: 44 kg/? Max. operating temperature: 523.9 ? Outlet pressure: 29.5 kg/? Re-heat steam flow: 137.7 ton/h Operation Hours (Steam Turbines) Steam turbine #1: 34,998 hours (1997.7 ~ 2013.6) Steam turbine #2: 37,723 hours (1997.7 ~ 2013.6)