Rotary machine for production of surgical wound dressings and eye patch dressings.
Fed with raw materials in reels; produces plasters in various sizes and shapes with round or squared corners, centered or continuous pad, in single pouch or rewound in rolls with hot or cold sealing.
Composed of a steel frame; all production units placed on the operator side; driving, transmission, electric and pneumatic components on the opposite side.
Equipped with fixed and movable safety guards; certified with CE mark.
Materials and surface treatments in compliance with standard norms.
Control panel allows setting working format, modifying functioning parameters, and viewing alarm messages.
Functional Features
Working voltage: Multivoltage.
Medium power absorption: 10 kW ± 25%.
Frequency: 60 Hz.
Hardware and wirings certification: CE (not UL / CSA).
Air supply: 6 bar.
Air consumption: 40 Nl/min.
Working room temperature: 10°C - 30°C.
Performance
Mechanical speed: Up to 60 m/min.
Production speed: Up to 25 m/min (heat sealing), up to 50 m/min (cold sealing), depending on the quality of sealing material.
Acceptance Test Procedure
Test includes products of sizes chosen by the buyer accordingly with the seller, based on the standard size.
Testing effected as follows: 1 consecutive hour of dry run, 1 consecutive functioning hour.
If continuous product feeding is not possible, seller reserves the possibility to feed the machinery in a discontinuous way.
Acceptance tests effected by seller’s technicians in presence of buyer’s representative.
If production of listed articles with agreed performances is achieved, machine is intended as accepted.
Any claim during testing must be verified in conjunction with seller engineers; if claims are considered not relevant and do not influence machine functionality, machine is assumed as accepted subject to necessary modifications.
Should buyer fail to attend testing in time communicated by seller, testing results will be considered as accepted.
At end of testing, an acceptance agreement will be signed.
Same acceptance procedure used during factory acceptance test (FAT) and site acceptance test (SAT).
Material for Design, Set Up and Test at Seller’s Facilities
To be supplied to manufacturer’s facility at purchaser and/or user charge.
At least xxx samples each piece typology at the purchase order issue.
At least xxx samples each piece typology not later than 2 months before testing date.
Remarks
Machine productivity must be verified with samples accepted by manufacturer, compliant with the drawing and the specification agreed.