Siemens, SGT-800, 2012, 205MW, 50Hz, Combined Cycle Power Plant (New)

Description

  1. Overview
    1. Installed capacity: 205 MW
    2. Energy production capacity: 1640 GWh/year
    3. Configuration: 3 x SGT-800 GT + 1 x ST
    4. Total gross efficiency / net efficiency: 55% / 53.6%
    5. Commission date: 16.06.2013
    6. Year: 2012
    7. Frequency: 50 Hz but can be changed to 60 Hz with no problems
  2. Transmission
    1. The generated electricity is transmitted to high voltage switchyard through 28 km of 154 kV 2x1272 MCM overhead transmission line.
  3. Commissioning
    1. The plant was commissioned as simple cycle in August 2012 and as combined cycle in June 2013.
  4. Operational Data
    1. Running hours: approx. 15,000
    2. GT 1: operational hours since COD 15,197; number of start stops 915; equivalent hours 21,085; EOC 1,177; operational hours after B inspection 2,547; number of start stops after B inspection 218
    3. GT 2: operational hours since COD 14,762; number of start stops 929; equivalent hours 21,489; EOC 1,345; operational hours after B inspection 2,493; number of start stops after B inspection 223
    4. GT 3: operational hours since COD 15,452; number of start stops 822; equivalent hours 22,034; EOC 1,316; operational hours after B inspection 2,582; number of start stops after B inspection 238
    5. SST900: operational hours since COD 17,399; number of start stops 849; equivalent hours 9,801; operational hours after B inspection 2,613; number of start stops after B inspection 262
  5. Condition
    1. Condition: like new
    2. Warranty: yes, possible
    3. Currently in operation