Siemens, SGT-800, 47.5 MW, Gas Turbine Generator, 118120 EOH
Scroll to zoom
100%
Description
Overview
Gas generator: Siemens Industrial Turbomachinery AB, type SGT800
Main gear: Flender Graffenstaden, type TX112/4C
Electric generator: Siemens Energy, type SGEN5-100A-4P
Max. capacity: 47.5 MWe – after upgrade in 2010
Current Status And Main Issues
Last reported OH: 118,120 EOH
Last reported maintenance: A-inspection at 110,753 EOH
Major repairs: Maintained in accordance with OEM recommendations
Exchanges: No additional work outside the normal service range
Upgrades: Unit was upgraded to A-plus as per OEM package
Detailed maintenance reports will be made available on request by interested buyer
Maintenance History And Key Findings
All inspections were executed by the original equipment manufacturer Siemens Industrial Turbomachinery AB, Finspong, Sweden for the gas generator and Siemens Energy, Essen, Germany for the electric generator
11/2008 at 9,158 EOH / 110 starts: A-inspection – execution of a planned A-inspection according to OEM maintenance plan; visual/borescope inspection of air intake system, guide vane control, compressor rotor, fuel injector, central casing, turbine rotor, outlet casing, exhaust diffuser, main gearbox; bleed valve adjustments, sensor exchange and minor repair works executed; result: unit is in serviceable condition
03/2009 at 12,422 EOH / 124 starts: Exchange OS hard drive, vibration measurements and balancing on site – exchange of Bently Nevada cards and controller logic changes; control and bleed valve corrective adjustment; correction of elevated GT bearing vibrations after a GT trip
02/2010 at 21,445 EOH / 137 starts: B-inspection – execution of B-inspection according to OEM maintenance plan; inspection at OEM factory of all rotors, casings, bearings, fuel injectors, fuel manifold, combustor; result: area inside turbine is wet from washing liquid, corrosion at stationary and rotary parts detected; compressor rotor was replaced; new insulation at central and outlet casing installed; unit was upgraded to A+ as per OEM package; original compressor rotor was replaced with a similar rotor and was balanced together with the turbine rotor in the balancing test facility in Finspong; the seal support ring (HG 2580) was replaced with new ring due to new design; on the central casing and outlet casing new insulation were installed according to latest design
05/2011 at 32,977 EOH / 156 starts: A-inspection – execution of a planned A-inspection together with a logic modification regarding anti-icing system and time synchronization; findings at ventilation system, air intake system, inlet piece, compressor blades, compressor stator, combustor, fuel manifold, turbine blades, main gear box; compressor was found clean, minor corrosion; minor oxidation at the combustor with small loss of material on the outer heat shield in front of guide vanes; turbine blade no. 1, minor TBC loss was observed at the blade tips and a few blades has TBC loss at the platform; the main gear pinion wheel and main wheel has white colorized spots on the cog tips from oil spray nozzles; result: unit found in serviceable condition, some corrosion at blades and vanes at compressor and turbine was detected
04/2014 at 57,851 EOH / 180 starts: A-inspection – execution of A-inspection according to OEM maintenance plan; result: missing protection cover at the start motor fan identified as safety risk, damaged cables at vibration measurement for the starter motor detected, oxidation at battery detected, need for maintenance at fuel gas isolation valve identified, PT100 temperature transmitter exchanged
07/2015 at 68,977 EOH / 193 starts: B-inspection – (1) execution of B-inspection incl. IGV-modification according to OEM maintenance plan, and Microsoft Windows was upgraded to Windows 7; PCS7 was upgraded from PCS7 v.6.1 to PCS7 v.8.0; as a consequence, significant start problems related to FLC modifications and PCS7 upgrade occurred; protective net at cooling fan on top of the start motor still missing; (2) execution of inspection at electrical generator including inspection of cooling systems; bearings at generator were cleaned and polished, labyrinth seals replaced, dust cleaning of stator and rotor of generator and exciter; bearing pedestals wet cleaned
03/2017 at 83,169 EOH / 221 starts: A-inspection – execution of A-inspection according to OEM maintenance plan; oxidation at outer vane plates at turbine stage no. 1 detected as well as TBC coating damage; compressor, air intake section and combustion section found in normal condition; result: unit found in serviceable condition
09/2018 at 95,349 EOH / 237 starts: D-inspection – execution of D-inspection according to OEM maintenance plan; assembly of new bellows between outlet casing and intermediate cone; assembly of new SSS-clutch; new set of HS and LS shafts at the gear were assembled; new set of tie bolts and nuts at both ends were assembled; eddy current and replica was performed on all turbine discs; Amot valve temperature bodies were changed to new ones; soft start logic was implemented and tuning of the soft start was made; various instrumentation adjustments and logic changes in the turbine controller were implemented; execution of small revision at the electrical generator including pressure test at the generator coolers
09/2020 at 110,753 EOH / 269 starts: A-inspection – execution of A-inspection according to OEM maintenance plan; package ventilation filters were found to be in soiled condition and no longer functioning effectively as significant contamination was passing to the package; missing bolt at compressor and inlet section; one of the insulation screws from outside close to the hatch was noticed cracked the surface on inside of inlet plenum; contamination was noticed between inlet piece and intermediate shaft; oil was noticed on split plane between VGV stage no. 0 until stage no. 2 bottom part at the compressor; corrosion was noted on the rotor body at all stages and guide vanes on stage no. 8 as well as on the rear stator (surface rust); rubbing marks from grating were noticed on central gas supply in the enclosure; oxidation was observed on several outer vane plates at the stator no. 1; soft insulation on inlet plenum was noticed missing and ragged on several places; soft insulation on bleed air
Request a Quote
✓
Request sent
Thank you, our team will reply to you shortly.
Direct access to our team
Email American Plant & Equipment
Tell us what you want to buy, source, finance, or sell. A machinery specialist will follow up with you.
✓
Thank you. Your request is with the American Plant and Equipment team.
A machinery specialist will follow up with you.
Machinery updates
Subscribe to our email list
Tell us which industries you follow and we will send you the machines that match.
✓
You are on the list.
We will email you when machines that match your interests come in. Unsubscribe from any message.