Only run about 8000 hours with another 16000 hours remaining.
Each set of gas turbine packing includes: air inlet housing, gas turbine, acc gear, load gear, exhaust plenum, turbine control device, on base auxiliary components, generator, lg compartment, water wash skid, fuel forwarding skid, control compartment, mv frame and cell, electrical system mcc, battery and charger, 52g compartment including bleeding transformer, generator protection and excitation, fuel gas final metering skid, steam injection skid and water injection skid.
General Data
Engine model: 7LM2500-PE-MD
Power turbine model: GE 6-pack
Type of fuel: natural gas
Type of nox suppression: none
Service Dates
Date unit out of service: 15-03-2021
Date unit into service: 04-02-2022
Last inspection date: 13-02-2020
Engine Timers
Total fired hours: unknown
Time since last inspection: 9224 hours
Time since last hso: 0 hours
Time since last moh: 28702 hours
Total fired starts: 92 starts
Total starts since last inspection: 21 starts
Total starts since last hso: 0 starts
Total starts since last moh: 92 starts
Total emergency trips: unknown
Reason for last shop visit: hso
Controls Main Component Equipment List
Turbine control panel: Woodward Micronet
Installed cpu: unknown
Remote 1/0 system: n/a
Fire-fighting / safety system: Fire Lite Alarms Inc-MS-9200