Description Overview Two turbine packages Manufacturer: Solar Turbines Inc, San Diego USA Model: Taurus 60 with Solonox combustion Packager: Turbomach Year package: 1996 Operating hours package: about 182,000 each Turbine Engines New engines installed in 2016 Version: T 7801 17,000 hours each since installation Capacity: 5200 kW Speed: 14,950 u/min continual Fuel: natural gas Fuel consumption: 122,469 kJ/kWh Burners: 12 Start system: electro-hydraulic, 90 kW Outlet temperature: 486°C Exhaust gas: 21,244 kg/s Dimensions: longitudinal- and transverse-force bases Turbine: 9 m x 2.2 m x 2.8 m = 33 tons Strainer: 4 m x 2.9 m x 3.8 m = 4.8 tons Insulating dome: 9 m x 2.2 m x 3.25 m = 7 tons Mounting: on steel skid (with acoustic enclosure) Last service / borescope: 06 2018 by Turbomach Reduction Gearboxes Type: Solar epicyclic reduction gearbox Output rpm: 1500 Year manufactured: 2016 (exchange together with turbine exchange) TSN (total since new): 17,000 hours each Generators Manufacturer: Leroy Somer Type / model: LSA 56 BWL 85 - 4P, 6 wire, wye connected, synchronous, with brushless exciter Frequency: 50 Hz Voltage: 6,300 volt Power: 6500 kW, PF = 0.8 Generator rpm: 1500 Year manufactured: 06-1996 Last service: 06 2016 Fire Protection Systems Hekatron, BLZ Ointegral C Control Systems Turbines Siemens S5, upgraded to S7 in 2013 Auxiliaries Lubrication systems Fuel systems Start systems electro-hydraulic 90 kW Air inlet systems, 1 stage air filter system Exhaust systems complete with silencer Waste Heat Recovery Boiler Manufacturer: Bertsch Type: waste heat boiler Year: 1996 Max. heating power: 13,024 kW Max. steam production: 20 t/h Max. working pressure: 15 bar Max. operating temp.: 201°C Normal operating temp.: 191°C Additional firing Additional Information In one line, it is possible to burn biogas in the surface burner Both systems are equipped with a 72-hour BOSB Double gas control line was retrofitted Continuous emission measurement with evaluation computer is installed Air cooling of gas turbines has been retrofitted in 2012 A new oil cooler is part of the system Natural gas heater is installed for the gas turbines CO2 extinguishing system is installed in the container Maintenances were carried out consistently by Turbomach All recurring TÜV checks performed - without complaints Condition Fully serviced by Turbomach and stopped operation in 08 2018 Siedelsbrunn, in 2024 SpecificationsWeight: 33000