Turbine Eltmann: level D carried out at 95,000 EOH (new hot pass blades and guide vanes)
The A tests were carried out according to the test plan.
Service and Maintenance
The full service and maintenance contract was provided by Siemens (value 15 million euros for each turbine, total service investment costs with modernization and gearbox renewal approximately 20 million euros investment).
A German independent expert conducted an analysis of the operating history of turbines. If requested, the results of the report, which answer most service questions.
Upgrades
Both turbines were originally delivered as A-type with a guaranteed output of 45 MW.
A turbine was converted to type A+ in 2010 with a guaranteed output of 47.5 MW (including a new rotor).
However, the maximum power of both turbines is 52 MW and is electronically limited to 50 MW (we have a Siemens certificate confirming 50 MW).
Generator: original Siemens generator 11 kV 50 Hz.
Spare Parts
The scope of delivery includes spare parts: 675 used blades and guide vanes, approximately 1,400 spare parts.
Request a Quote
✓
Request sent
Thank you, our team will reply to you shortly.
Direct access to our team
Email American Plant & Equipment
Tell us what you want to buy, source, finance, or sell. A machinery specialist will follow up with you.
✓
Thank you. Your request is with the American Plant and Equipment team.
A machinery specialist will follow up with you.
Machinery updates
Subscribe to our email list
Tell us which industries you follow and we will send you the machines that match.
✓
You are on the list.
We will email you when machines that match your interests come in. Unsubscribe from any message.