Siemens, SGT-800 & SST-900, 2013, 200 MW Combined Cycle Power Plant, 1640 GWh/Year

Description

  1. Overview
    1. Installed capacity: 200 MW
    2. Energy production capacity: 1640 GWh/year
    3. Commissioning date: 16.06.2013
    4. Configuration: 3 x SGT-800 GT + 1 x ST
    5. Total gross efficiency / net efficiency: 55% / 53.6%
  2. Power Plant Description
    1. The power plant is composed of 3 gas turbines (Siemens SGT-800) and 1 steam turbine (Siemens SST-900), 3 HRSGs (Aalborg-Denmark), 1 ACC (SPX-Belgium), 1 RMS station, HV switchyard and BOP equipment.
    2. The generated electricity is transmitted to high voltage switchyard through 154 kV 2x1272 MCM overhead transmission line.
    3. The plant was commissioned as simple cycle in August 2012 and as combined cycle in June 2013.
    4. The plant is still installed.
    5. It had over 30,000 hours on it as of 2023.