GE, LM-6000 PC Sprint, 2002, 47.3 MW, Gas Fuel, 60 Hz

Description

  1. Overview
    1. Two each low hour rebuilt GE LM-6000 PC Sprint
    2. Year: 2002
    3. Hours before overhaul: 27,000
    4. Recent overhaul on turbines
    5. Hours since overhaul: approximately 2,000
    6. Gas turbine with Sprint power boost
    7. Fuel: gas fuel
    8. Power output: 47,300 kW @ ISO
    9. Manufacturer's guaranteed heat rate of 8,200 BTU/kWh
    10. Emissions guarantee, water injection: NOx 25 ppmvd @ 15% O2
    11. Generator: Brush 71.2 MVA, 60 hertz, 13.8 kV
    12. Complete with all noted auxiliaries (attached)
  2. Scope Of Supply
    1. For a detailed description of the basic and optional scope of supply, please refer to the accompanying product specification manual.
  3. Basic Scope Of Supply
    1. LM6000 gas turbine engine equipped with inlet bell mouth and screen
    2. Gas fuel, water injected combustion system, complete and self-contained on the unit, with connection on the baseplate for customer's filtered, regulated fuel supply at 625 psig ± 20 psig
    3. Generator, 13,800 volt, 60 Hz, 3600 rpm, low maintenance brushless excitation system suitable for Class I, Group D, Div 2 areas, neutral and line cubicles with CTs, surge protectors and lightning arrestors
    4. Sprint (spray intercooling) power augmentation option
    5. I-beam baseplates for turbine, generator and unit mounted accessories
    6. Acoustic enclosure for gas turbine and generator
    7. Redundant ventilation systems and AC internal lighting
    8. Multi stage air inlet filtration system for both gas turbine and generator, including weather hoods, inlet screen, pre-filter, final barrier filter, intake silencer, and standard ducting to plenum chamber; filter house ladders and platforms are included
    9. Electro-hydraulic start system
    10. Separate oil systems for gas turbine and generator, including duplex filters, duplex water/oil coolers, stainless steel piping, and stainless-steel reservoirs
    11. Unit control panel for indoor mounting in a controlled environment, including microprocessor fuel management and sequencing system, generator metering, Bentley Nevada vibration monitoring, CRT annunciation of alarms and shutdowns, and Ethernet/Modbus interface to customer's DCS
    12. I/O cubicle mounted on gas turbine enclosure
    13. 24V DC control system battery with dual battery chargers
    14. Fire and gas detection and extinguishing system, serving both turbine and generator compartments
    15. Soak wash system for simple cycle service
    16. Generator factory testing to IEEE or IEC standards; gas turbine performance test by G.E.; full load string test and performance verification of turbine generator set at S&S factory (Houston); load string tested
    17. Six sets of drawing and data packages, O & M manuals
    18. See additional project specific details in scope of supply section
  4. Optional Equipment And Services
    1. Option H - dual fuel system (included in base price)
    2. Option I - water injection metering system for NOx control with gaseous, liquid or dual fuel systems (included in base price)
    3. Option X - Sprint (spray intercooling) power augmentation (included in base price)
    4. Exhaust stack (included in base price)
  5. Exclusions
    1. Fuel, fluids and chemicals
    2. Fuel storage tanks and forwarding equipment
    3. Water treatment and purification equipment
    4. Deaeration and chemical injection equipment
    5. Heat recovery boiler
    6. Boiler feed pump and auto level control assembly
    7. Automatic blowdown controls
    8. Absorption chiller and chilled water supply system
    9. Buildings, foundations and foundation embedments
    10. Filter house support structure other than standard
    11. High voltage transformer(s), switchgear and associated equipment
    12. Distributed plant control or remote-control panels
    13. Balance of plant and energy optimization controls
    14. Desuperheater equipment
    15. Steam turbine generator set
    16. Steam turbine condenser and condensate pumping equipment
    17. Cooling tower and circulating water system
    18. Interconnecting piping, conduit, and wiring between equipment modules
    19. Power plant calibration tools and ordinary hand tools
    20. Off loading of equipment at jobsite
    21. Yard light and fences
    22. Spare parts other than start-up spares
    23. Supervision or technical direction at jobsite