810 MW (2 x 405 MW, ISO) combined cycle power plant, 50 Hz, natural gas fuel.
Consists of two 405.5 MW (ISO) combined cycle power modules in a 1x1x1 arrangement.
Each module includes one General Electric GT-9FA.03 gas turbine, one Alstom steam turbine, and a CMI-designed heat recovery boiler system with supplemental firing.
Electricity generated at 15.75 kV and stepped up to 400 kV via Areva step-up transformers.
Commissioned at the end of 2015; placed in preservation mode shortly after due to lack of natural gas.
Actual operating hours: 2,790 and 1,547 hours since new.
Documented efficiency of 56.85% (at site); theoretical efficiency close to 60%.
Supplemental firing allows each module to generate about 14 MW of additional power.
Service and supply contract with GE in place until 2028.
All original design and construction documentation (civil, mechanical, electrical) included.
Plant control room features Yokogawa complete operations systems integration, 170 kV of UPS backup power, and remote monitoring with GE.
Emergency power provided by two 1 MW emergency generators.
Black start capability requires a 15 MW generator (optional).
Preservation And Maintenance
Maintained under the manufacturer’s (GE) preservation program by qualified professionals.
Program includes annual borescope inspections, scheduled rotation of turbines and generators, scheduled maintenance, recirculating heat for steam and gas turbines, generator heat, and nitrogen blankets for all fluid lines and equipment sections requiring preservation.
Long-term service and parts supply agreement with GE available, as well as maintenance and spare parts supply for the steam turbines.
All plant and equipment will get warranties and performance assurances from the OEM.
Specifications
Gas turbine: 2 x 240 MW.
Gas turbine generator: 2 x 214 MVA, 0.80 power factor lag.
Steam turbine: 2 x 144 MW.
Steam turbine generator: 2 x 169.65 MVA, 0.85 power factor lag.
Power transformer GTG: 3 phase, 277 MVA, 0.85 power factor lag, voltage 15.75/420 kV, cooling ONAN/ONAF/OFAF, 50 Hz.
Unit auxiliary transformer: 3 phase, 28 MVA, voltage 15.75/6.9 kV, cooling ONAN/ONAF, 50 Hz.
Power transformer STG: 3 phase, 170 MVA, 0.85 power factor lag, voltage 15.75/420 kV, cooling ONAN/ONAF/OFAF, 50 Hz.
Balance Of Plant
DM plant: 2 x 20 m³/hr, Triveni Engineering Ind. Ltd.
Condition
Fully erected but unused; in preservation mode as per OEM norms (GE, Alstom, L&T).
Available for immediate delivery with full OEM warranty.
Included
Metal building housing the two modules, designed to withstand high winds (coastal locations) and includes a heavy lifting overhead crane suitable for all maintenance and repair operations of the gas and steam turbines.
All original design and construction documentation (civil, mechanical, electrical engineering).
Site conditions applicable; buyer shall assess all engineering and design conditions for the new site.
Request a Quote
✓
Request sent
Thank you, our team will reply to you shortly.
Direct access to our team
Email American Plant & Equipment
Tell us what you want to buy, source, finance, or sell. A machinery specialist will follow up with you.
✓
Thank you. Your request is with the American Plant and Equipment team.
A machinery specialist will follow up with you.
Machinery updates
Subscribe to our email list
Tell us which industries you follow and we will send you the machines that match.
✓
You are on the list.
We will email you when machines that match your interests come in. Unsubscribe from any message.