Scholz, Erema, Siemens, Spare Parts and Upgrades Package for Spinning Line, 2013-2020

Description

  1. Recent Investments
    1. 5x Scholz dosing systems installed in 2013
    2. 4x extruder screws (line C) installed in 2014
    3. 24x spinning pumps (line C) installed in 2015
    4. 25x spinning pumps (line D) installed in 2016
    5. Motor and gear extruder (line D) installed in 2016
    6. 1x Erema screen changer (line C) installed in 2017
    7. Reel drive unit (line C) installed in 2019
    8. Additional suction unit (line C) installed in 2019
    9. Reel drive unit (line D) installed in 2020
    10. 1x motor extruder (line C) installed in 2020
    11. 1x heating-cooling circuit for stretching units installed in 2017
    12. Conversion of all equipment in the belt line to individual drives from Siemens in 2015
    13. Dryer belt drive installed in 2018
    14. Conversion of balers (new control system, control cabinets, control panels, insertion shield with fibre distribution, condenser) in 2016
    15. Overhaul of the baler hydraulic unit in 2018
    16. Conversion to scraper systems on roller units and fixers in 2016/2018
  2. Included Package of Utilities and Spare Parts
    1. 700 nozzle plates (120, 210, 520, 649-hole) plus 300 nozzle kits
    2. 600 aluminium cans
    3. 20,000 screens for screen changers
    4. 18,000 sieves for nozzles plus approximately 1 ton filter gravel
    5. 32,500 box bags for 16,000 bales
    6. 20 rolls of strapping tape (40,000 m)
    7. Spare parts package MTA/EMSR (various spare motors, gear parts, godets, squeezing rollers included)
  3. Specifications
    1. Accessories package value: approx. 300,000 EUR