General Electric, TM2500, 1985, 21.8 MW, 50 Hz, Mobile Gas Turbine Package

Description

  1. Overview
    1. 21.8 MW @ 50Hz gas turbine package consisting of a General Electric dual fuel, LM2500-PE-NGWG05 gas turbine, a Brush BDAX 62-170ER generator, control system and gas supply system
    2. One spare gas turbine
    3. One spare generator
  2. Gas Turbine
    1. Manufacturer: GE Electric
    2. Year manufactured: 1985
    3. Operating hours: 14,128
    4. The GT unit currently in place dates back to 1985 and was originally supplied with the package
    5. Underwent a comprehensive overhaul in 2018 and was re-installed in December of that year
    6. Since November 26, 2019, it has been preserved and started monthly for routine bearing wetting, adhering to OEM requirements
    7. As of now, it has accumulated approximately 14,128 operational hours since its last overhaul
  3. Brush Generator
    1. Rated: 19.4 MW, 24.250 MVA, 11,500 V, 1273 A, 3 ph, 50 Hz at 3000 rpm
    2. Rated: 22.8 MW, 3600 rpm
    3. The Brush BDAX 62-170R generator was installed in February 2020 following a complete midlife overhaul
  4. Spare Gas Turbine
    1. Manufacturer: GE Electric
    2. Year manufactured: 2004
    3. Operating hours: 53,310
    4. Currently stored on-site under long-term preservation per OEM specifications
    5. Necessitates a full overhaul of the compressor and hot section
    6. The power turbine has a remaining serviceable life of 46,690 hours
  5. Spare Generator
    1. Manufacturer: Brush
    2. Also on-site in long-term storage as per OEM specifications