21.8 MW @ 50Hz gas turbine package consisting of a General Electric dual fuel, LM2500-PE-NGWG05 gas turbine, a Brush BDAX 62-170ER generator, control system and gas supply system
One spare gas turbine
One spare generator
Gas Turbine
Manufacturer: GE Electric
Year manufactured: 1985
Operating hours: 14,128
The GT unit currently in place dates back to 1985 and was originally supplied with the package
Underwent a comprehensive overhaul in 2018 and was re-installed in December of that year
Since November 26, 2019, it has been preserved and started monthly for routine bearing wetting, adhering to OEM requirements
As of now, it has accumulated approximately 14,128 operational hours since its last overhaul
Brush Generator
Rated: 19.4 MW, 24.250 MVA, 11,500 V, 1273 A, 3 ph, 50 Hz at 3000 rpm
Rated: 22.8 MW, 3600 rpm
The Brush BDAX 62-170R generator was installed in February 2020 following a complete midlife overhaul
Spare Gas Turbine
Manufacturer: GE Electric
Year manufactured: 2004
Operating hours: 53,310
Currently stored on-site under long-term preservation per OEM specifications
Necessitates a full overhaul of the compressor and hot section
The power turbine has a remaining serviceable life of 46,690 hours
Spare Generator
Manufacturer: Brush
Also on-site in long-term storage as per OEM specifications
Request a Quote
✓
Request sent
Thank you, our team will reply to you shortly.
Direct access to our team
Email American Plant & Equipment
Tell us what you want to buy, source, finance, or sell. A machinery specialist will follow up with you.
✓
Thank you. Your request is with the American Plant and Equipment team.
A machinery specialist will follow up with you.
Machinery updates
Subscribe to our email list
Tell us which industries you follow and we will send you the machines that match.
✓
You are on the list.
We will email you when machines that match your interests come in. Unsubscribe from any message.