Siemens, SGT-400, Combined-Cycle Cogeneration (CHP) Plant, 37.4 MW, 50 Hz

Description

  1. Overview
    1. Complete 2 x Siemens SGT-400 combined-cycle cogeneration (CHP) plant, 37.4 MW gross output, 50 Hz, natural gas, complete power island and balance of plant.
    2. Offer basis: supply only, ex-works. Used equipment, as-is/where-is, subject to inspection, documentation review and final sales and purchase agreement.
    3. Gross output: 37.4 MW.
    4. Combined-cycle efficiency: 46%.
    5. Natural-gas configuration: 50 Hz.
  2. Plant Overview
    1. A complete matched cogeneration power island comprising two Siemens SGT-400 gas-turbine generator sets, two HRSGs, two extraction-condensing steam turbines, one supplementary gas-fired package boiler, and the principal electrical, fuel-gas, cooling-water, water-treatment, fire-protection and DCS balance-of-plant systems required for operation.
    2. Gas turbines: 2 x Siemens SGT-400, single-shaft, low-NOx.
    3. GT gross output: 14.034 MW each / 28.1 MW total.
    4. Steam turbines: 2 x C4.78 extraction-condensing steam turbines.
    5. ST output: 4.681 MW each condensing / 9.4 MW total.
    6. Plant gross output: 37.4 MW.
    7. Combined-cycle electrical efficiency: approx. 46%.
    8. Fuel / frequency: natural gas / 50 Hz.
    9. Generator voltage: 10.5 kV.
    10. Grid evacuation: 110 kV via 2 x 25 MVA transformers; double-busbar GIS.
    11. Condition: used, as-is/where-is; available for inspection.
    12. Year of manufacture: to be confirmed from owner documentation / dossier.
    13. Operating hours / starts: to be confirmed from owner records and inspection.
    14. Country / location: available to qualified buyer under controlled disclosure.
  3. Gas Turbine - SGT-400 (x2)
    1. Type: single-shaft gas turbine, simple-cycle.
    2. Compressor: 11-stage axial; low-NOx combustion.
    3. Gross output: 14.034 MW each / 28.1 MW total.
    4. Heat rate: 10,298 kJ/kWh.
    5. Simple-cycle efficiency: 35%.
    6. Generator: TFW15000-4, 10.5 kV.
    7. Fuel / frequency: natural gas / 50 Hz.
    8. Ancillaries: CO2 fire suppression; turbine-hall lifting facilities.
  4. Steam Turbine - C4.78 (x2)
    1. Type: extraction-condensing steam turbine.
    2. Output - condensing: 4.681 MW each / 9.4 MW total.
    3. Output - cogeneration mode: 1.795 MW each.
    4. Generator: 5 MW, 10.5 kV.
    5. Surface condenser: 560 m2 (6,027.8 sq ft) each.
    6. Auxiliaries: vacuum and condensate pumps, turning gear, seals and auxiliary cooling.
  5. Heat Recovery, Boiler and Balance of Plant
    1. HRSG (x2): single-pressure, unfired, natural-circulation; 20.9 t/h HP steam each (41.8 t/h total); 5.3 MPa / 450 C; 35 m (114.8 ft) stack; DeNOx provision.
    2. Supplementary package boiler: SZS20 gas-fired package boiler; 20 t/h; 1.45 MPa / 260 C; >=99% stated efficiency; approx. +1,420 Nm3/h additional gas demand.
    3. Fuel-gas system: natural-gas pretreatment skid, filtration, metering, pressure regulation/heating, chromatograph and booster compressors; GT fuel demand stated at approx. 8,100 Nm3/h for both GTs.
    4. Cooling-water system: mechanical-draft wet-recirculating cooling tower system with circulating-water pumps, cooling towers, travelling screens and forebay sump pump.
    5. Electrical systems: 110 kV double-busbar GIS; 2 x 25 MVA main transformers; 10 kV vacuum switchgear; station-service transformers; LV PCC/MCC; UPS and 220 V DC systems.
    6. Water treatment: ultrafiltration, two-stage RO and EDI train with demineralised-water storage, chemical dosing and membrane cleaning systems.
    7. Fire / auxiliary systems: fire-water pumps, hydrants, extinguishers, compressed air, lube-oil systems, boiler waste-heat hot-water systems and plant lifting facilities.
    8. Control and instrumentation: redundant DCS / MIS architecture with operator/engineering/history stations, redundant controllers, industrial ethernet, firewalls and isolation gateways.
  6. Scope of Supply - Included
    1. Complete power island: 2 x SGT-400 GT and generators.
    2. 2 x HRSG.
    3. 2 x C4.78 steam turbines and generators.
    4. Supplementary SZS20 gas-fired package boiler.
    5. Fuel-gas pretreatment skid and booster compressors.
    6. Cooling-water system - pumps, towers and screens.
    7. Electrical package - 110 kV GIS, 2 x 25 MVA transformers, MV/LV switchgear, UPS/DC.
    8. Water-treatment package - UF / RO / EDI and chemical dosing.
    9. Fire protection, balance-of-water and auxiliary systems.
    10. Redundant DCS and MIS control systems.
    11. Available technical documentation and inspection opportunity.
  7. Scope of Supply - Excluded
    1. Transportation, freight, shipping and marine insurance.
    2. Disconnection, removal and loading at current site unless separately agreed.
    3. Import duties, customs clearance and in-country logistics.
    4. Installation, commissioning, integration and re-erection.
    5. Civil works, foundations and destination-site preparation.
    6. Reconditioning, overhaul or refurbishment unless expressly stated.
    7. Spare parts beyond those physically supplied with the plant.
    8. Performance guarantees on used equipment / warranty beyond agreed OEM or seller scope.
    9. Taxes and duties for purchaser account.