Power Generation Inventory List: Gas and Steam Turbines, Gas Engine Gensets and Power Plants, 3.3 to 400 MW, 56 Listings (99 Units)

Description

  1. Overview
    1. Inventory list of power generation equipment: 56 listings, 99 units in total
    2. Gas turbines and turbine generator packages, steam turbines, combined cycle plants, gas and diesel engine gensets and related equipment
    3. Makers: ABB, Centrax, GE, Kawasaki, MAN, Pratt & Whitney, Rolls-Royce, Siemens, Solar Turbines, Caterpillar, Jenbacher, MWM, Wärtsilä, Enerproject and HITEC
    4. Ratings from about 3.3 MW gas engine gensets to a 400 MW combined cycle plant
    5. Mostly 50 Hz; 60 Hz units are marked
    6. Each unit is offered separately; price per unit on request
    7. All units are subject to prior sale; availability is confirmed at quotation
  2. ABB Gas Turbines
    1. ABB STAL GT10B gas turbine, complete unit: 3 units, 1995, dual fuel, 60 Hz, 24.6 MW, 93,346 hours
    2. ABB GT35C gas turbine, 21 MVA (out of service since 2018): 4 units, 1995, dual fuel, 60 Hz, 12 MW, 102,430 hours
    3. ABB GT-8 RBK gas turbine generator set (SGT-800 class), 49.3 MW: 3 units, 1987, natural gas, 50 Hz, 155,000 hours
    4. ABB GT10 gas turbine upgraded to Siemens SGT-600 (type GT10B1): 1 unit, 1997, dual fuel, 50 Hz, 24.6 MW, 229,087 hours
  3. Centrax Gas Turbine
    1. Centrax CX300 1S gas turbine (CHP): 1 unit, 2025, natural gas, 50 Hz, 8 MW, expected availability spring 2027
  4. GE Gas and Steam Turbines and Power Plants
    1. GE steam turbine, model 270T141: 1 unit, 1985
    2. GE Frame 5 (5001P) gas turbine generator package, 24.1 MW: 1 unit, 1981, liquid fuel, 50 Hz, 69,000 hours
    3. GE Frame 5 MS5001K gas turbine generator: 1 unit, 1965, light distillate oil, 50 Hz, 14 MW, 23,000 hours
    4. GE LM2500+ DLE gas turbine (1997, 2019), balance of plant only: 1 unit, natural gas, 50 Hz, 20 MW, 26,800 hours
    5. GE Frame 5 MS5001N power barges, 160 MW each: 2 units, 1970, dual fuel, 60 Hz, 15,500 hours
    6. GE Alsthom 9001E gas turbines and Rateau steam turbines, 271 MW: 2 units, 1990, multi-fuel, 50 Hz, about 157,232 hours (gas turbines) and about 130,000 hours (steam turbines)
    7. GE Frame 5 PG5341 (MS5001P) gas turbine: 1 unit, 1998, light distillate oil, 50 Hz, 25.5 MW, 22,461 hours
    8. AEG Kanis GE Frame 5 (5341N) gas turbine, 25.6 MW: 1 unit, 1982, distillate oil, 50 Hz, 2,230 hours
    9. GE 109FA combined cycle power plant, 400 MW: 1 unit, 2002, natural gas and gas oil, 50 Hz, 47,292 hours
    10. GE Frame 9E dual fuel open cycle gas turbine power plant, 243 MW: 2 units, 2000, dual fuel, 50 Hz, 50,642 hours
    11. GE LM2500+ DLE gas turbine, 30 MW: 1 unit, 2002, natural gas, 50 Hz, 8,185 hours
    12. GE LM6000 PC gas turbine, 46 MW, core only: 1 unit, 2002, natural gas, 60 Hz, 0 hours
    13. GE LM6000 PD gas turbine: 1 unit, 2012, natural gas, 50 Hz, 48 MW, 98,000 hours
    14. GE MS9001E and Toshiba multi-shaft combined cycle package, 310 MW: 2 units, 1990, dual fuel, 50 Hz, gas turbines 121,500 to 132,100 hours, steam turbine 147,931 hours
    15. GE Frame 6B MS6001B gas turbine generator package (36.7 MVA, 13.8 kV): 1 unit, 2002, natural gas, 60 Hz, 30 MW, 180,000 hours
  5. Kawasaki Gas Turbines
    1. Kawasaki L30A gas turbine, 34 MW: 1 unit, 2020, natural gas, 60 Hz, 19,596 hours
    2. Kawasaki GPB60 PLUS gas turbine generator package: 1 unit, 2013, natural gas, 50 Hz, 5.4 MW
  6. MAN Diesel Power Plant
    1. MAN diesel power plant fleet: 7 units, 1990, heavy fuel oil, 50 Hz, 7.15 MW each
  7. Pratt & Whitney Gas Turbines
    1. Pratt & Whitney FT4 Twin Pac gas turbine, 42 MW: 1 unit, 1971, dual fuel, 60 Hz, 2,108 hours
    2. Pratt & Whitney FT8 gas turbine packages: 4 units, 1996, natural gas, 50 Hz, 26 MW, over 54,000 hours
  8. Rolls-Royce Gas Turbines
    1. Rolls-Royce Trent 60 DLE combined cycle, 75 MW: 1 unit, 2016, natural gas, 50 Hz, 0 hours
    2. Rolls-Royce Olympus SK30C gas turbine: 3 units, 1982, 60 Hz, 25 MW, over 120,000 hours, fuel to be confirmed
  9. Siemens Gas and Steam Turbines
    1. Siemens SGT-500 gas turbine, 18.47 MW: 2 units, 2007, dual fuel, 60 Hz, 0 hours
    2. Siemens SGT5-4000F gas turbine, 298 MW: 1 unit, 2016, dual fuel, 50 Hz, 0 hours
    3. Siemens SGT-500 gas turbine generator package, 15.1 MW: 1 unit, 1986, liquid fuel, 50 Hz, 49,000 hours
    4. Siemens SST-400 steam turbine, 25.7 MW: 1 unit, 2010, 10,740 hours
    5. Siemens V94.2 gas turbine and ABB steam turbine, 207 MW: 1 unit, 1987, multi-fuel, 50 Hz, 166,928 and 161,667 hours
    6. Siemens SST-600 steam turbine generator package, 58 MW: 1 unit, 2010, 50 Hz, 0 hours
  10. Solar Turbines
    1. Solar Centaur 40 gas turbine generator package: 1 unit, 1993, natural gas, 3.5 MW, 20,609 hours
    2. Solar Taurus 70 gas turbine, 8 MW: 1 unit, 2017, natural gas, 50 Hz, 0 hours
    3. Solar Centaur 40 cogeneration power plant, 3.5 MW: 1 unit, 1998, natural gas, 60 Hz, 17,522 hours
    4. Solar Titan 250 gas turbine compressor set: 1 unit, 2017, natural gas, 60 Hz, 22 MW, 0 hours
    5. Solar Taurus 65 gas turbine, 6.3 MW: 1 unit, 2011, natural gas, 50 Hz, 2,423 hours
    6. Solar Titan 130 gas turbine power plant with SST-400 steam turbine: 2 units, 2012, natural gas, 50 Hz, 14.5 MW, 3,150 and 2,026 hours
    7. Solar Taurus 60 gas turbine, 4.95 MW (GT 2): 1 unit, 1997, natural gas, 50 Hz, 32,277 hours
    8. Solar Taurus 60 gas turbine, 4.95 MW (GT 1): 1 unit, 2000, natural gas, 50 Hz, 31,582 hours
    9. Solar Mars 100 gas turbine and Siemens SST-060 steam turbine package: 1 unit, 2006, dual fuel, 50 Hz, 11.3 MW, 145,434 and 51,129 hours
    10. Solar Titan 130 gas turbine cogeneration package: 1 unit, 2025, natural gas, 50 Hz, 15 MW, 1,358 hours
    11. Solar Titan 130 gas turbine package: 1 unit, 2024, natural gas, 50 Hz, 15 MW, 3,520 hours
    12. Solar Taurus 60 gas turbine generator package, new core fitted in 2022: 1 unit, 2003, dual fuel, 50 Hz, 5.5 MW, 144,850 package hours, 5,960 hours on the new core
    13. Solar Taurus 70 gas turbine generator package: 1 unit, 2021, dual fuel, 50 Hz, 7.9 MW, 59 hours
  11. Gas Engine Gensets and Engine Power Plants
    1. Caterpillar CG260-16 gas engine generator set (11 kV): 1 unit, 2019, natural gas, 50 Hz, 4.3 MW, 19,230 hours
    2. Jenbacher J624 generator sets: 2 units, 2015, natural gas, 50 Hz, 6.6 MW, 47,299 and 48,292 hours
    3. Jenbacher JMS 620 gas engine generator packages: 2 units, 2019, natural gas, 50 Hz, 3.3 MW, 11,473 and 12,206 hours
    4. MWM TCG 2032B V16 gas engine gensets: 8 units, 2026, natural gas, 50 Hz, 4.5 MW, 0 hours
    5. Wärtsilä 20V34DF tri-fuel engines (natural gas, heavy fuel oil, diesel or light fuel oil) with waste heat recovery boilers: 2 units, 2021, 50 Hz, 9.78 MW, 22,452 and 18,283 hours
    6. Wärtsilä 18V34SG gas engine generator packages: 3 units, 2005, natural gas, 50 Hz, 6.2 MW, 91,000 hours
    7. MWM 2032 V16 complete power plant, 16 MW: 4 units, 2011, gas, 50 Hz, 18,500 hours
  12. Other Equipment
    1. Enerproject EGS-S-30132W gas compressors: 2 units, 2007, 2,283 hours
    2. GE 84 MVA dual-voltage power transformers: 4 units, 2018, 50/60 Hz
    3. HITEC PowerPRO-800 diesel rotary UPS (DRUPS), 2,000 kVA: 1 unit, 50 Hz