Search results for: 'turbines parts'
- Related search terms
- parts for Te
- Parts boo
- Parts book
- turbines SGT
- parts f
-
C-3994 BARGEMOUNTED POWER PLANT, CAPACITY 220MWC-3994 BARGEMOUNTED POWER PLANT, CAPACITY 220MW
A. ONCE THROUGH STEAM GENERATOR
B. BARGE
C. CHILLERS
D. AIR COMPRESSOR
E. GAS TURBINE
F. STEAM TURBINE
G. FEEDWATER SYSTEM
H. CLOSED COOLING WATER SYSTEM
I. AUXILIARY COOLING WATER SYSTEM
J. CONDENSATE POLISHING UNIT (CPU)
K. WASTE WATER SYSTEM
L. PLANT ELECTRICAL SYSTEM
M. BLACK START DG SET
N. PLANT CONTROLS AND INSTRUMENTATION
O. PLANT FIRE FIGHTING SYSTEM
P. START UP VACUUM SYSTEM
Q. STEAM TURBINE DEAERATING CONDENSERQUANTITY: 1 PLANT
Learn More -
YY-3490 USED GE LM2500 GAS TURBINES, 6 UNITSYY-3490 USED GE LM2500 GAS TURBINES, 6 UNITS 1. STATUS: AVAILABLE 2. BRAND: GE 3. MODEL: LM2500 4. CONDITION: USED 5. WATTAGE: 18.64 MW 6. FUEL: LIQUID FUEL QUANTITY: 6 UNITS Learn More -
TT-7587 SIEMENS TG50D5/W701DS GAS TURBINE GENERATOR, 127.8 MW, YEAR 1995TT-7587 SIEMENS TG50D5/W701DS GAS TURBINE GENERATOR, 127.8 MW, YEAR 1995 1. SIEMENS WESTINGHOUSE TG50D5/W701DS 127.8 MW GAS TURBINE GENERATOR PACKAGES FOR SALE. THE TURBINE PACKAGES TOGETHER OFFER 255 MW READY TO SHIP EQUIPMENT. THIS TECHNOLOGY IS ONE OF THE MOST WIDESPREAD MIDDLE SIZE ENGINES (100-104 MW) FOR POWER GENERATION AND THE ONLY TURBINE OF ITS SIZE THAT CAN OPERATE ON HEAVY FUEL OIL (HFO). 2. THE UNITS ARE OFFERED WITH SOME OF THE REQUIRED BALANCE OF PLANT BY SEPARATE NEGOTIATION. 3. THESE UNITS WERE INSTALLED AND OPERATED IN A POWER STATION FROM 1996 UNTIL THE END OF 2004, WHEN THEY WERE DISMANTLED AS THE RESULT OF A PLANT UPGRADE. THE UNITS WERE PURCHASED AND UPGRADED BY THE BUYER TO 127.8 MW NOMINAL CAPACITY EACH. THEY ALSO FULLY REFURBISHED THE UNITS TO ZERO HOURS. THE TURBINES HAVE THE CAPABILITY OF BEING ABLE TO SWITCH BETWEEN NATURAL GAS AND LIQUID FUEL WHILE STILL OPERATING UNDER LOAD. QUANTITY: 2 Learn More -
TT-6645 GE FRAME 6B GAS TURBINE, YEAR 1981TT-6645 GE FRAME 6B GAS TURBINE, YEAR 1981 1. 2X GE FRAME 6B GAS TURBINES 2. TECHNICAL SUMMARY 3. GAS TURBINES: TWO GE MS 6001 B GAS TURBINES PAIRED WITH AEG GENERATORS (TYPE S7102/2). QUANTITY: 2 Learn More -
J-4726 SIEMENS SGT800 TURBINES, 45 AND 47 MW CAPACITY, 50 HzJ-4726 SIEMENS SGT800 TURBINES, 45 AND 47 MW CAPACITY, 50 Hz MAKE: SIEMENS MODEL: SGT800 45 AND 47 MW CAPACITY 50 Hz QUANTITY: 2 Learn More -
TT-7052 ELLIOT STEAM TURBINES W/ HYUNDAI-IDEAL ELECTRIC GENERATOR SET, YEAR 2016, 60 Hz, 6.5 MW, 6600 VOLTSTT-7052 ELLIOT STEAM TURBINES W/ HYUNDAI-IDEAL ELECTRIC GENERATOR SET, YEAR 2016, 60 Hz, 6.5 MW, 6600 VOLTS ITEM 001 1. STEAM TURBINE "ELLIOT" WITH GENERATOR SET "HYUNDAI-IDEAL ELECTRIC" 2. BRAND: ELLIOT-HYUNDAI-IDEAL ELECTRIC 3. MODEL: 2 DYR6 ITEM 002 1. MULTI-STAGE STEAM TURBINE “ ELLIOTT”. 2. MODEL 2DYR6 3. YEAR 2016 ITEM 003 1. BRUSHLESS SYNCHRONOUS GENERATOR “HYUNDAI-IDEAL ELECTRIC” 2. OUTPUT 6.595 KW-4P- 6600 VOLT; 60 Hz 3. WEIGHT 20,000 KG 4. WITH START-UP AND 2 YEAR SPARE PARTS Learn More -
YY-3526 SOLAR TURBINES TITAN 130, VERSION 20501 AXIYY-3526 SOLAR TURBINES TITAN 130, VERSION 20501 AXI THIS PROPOSAL OUTLINES THE SUPPLY OF A SOLAR TURBINES TITAN 130 GAS TURBINE WITH APPROXIMATELY 8.000 OPERATING HOURS. THE UNIT IS LAND-BASED, CONVENTIONAL (NON-SOLONOX), AND DOES NOT REQUIRE OVERHAULING DUE TO ITS LOW OPERATING HOURS. THE PACKAGE INCLUDES DELIVERY TO THE NEAREST SEAPORT, WITH A 60-DAY GUARANTEE AFTER STARTUP. NOT INCLUDED: - INSTALLATION & COMMISSIONING - SPARE PARTS - AUXILIARY SYSTEMS (IF REQUIRED) QUANTITY: 1 Learn More -
TT-1886 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz, (16 X 3.2MW), YEAR 2008TT-1886 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz, (16 X 3.2MW), YEAR 2008 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz (16 X 3.2MW) MAIN SPECIFICATIONS GAS TURBINE MODEL: M1T-23 BRAND: KAWASAKI POWER OUTPUT: 3,200KWE FREQUENCY & VOLTAGE: 60Hz & 6600V YEAR OF PRODUCTION: 2008 RUNNING HOURS: ABOUT 60 HOURS FUEL OIL: NATURAL GAS PLANT AUXILIARY EQUIPMENT: 1 SET Learn More -
TT-8039 SIEMENS SST-400 30MW STEAM TURBINE+38MW GENERATOR FOR POWER PLANT, YEAR 2011TT-8039 SIEMENS SST-400 30MW STEAM TURBINE+38MW GENERATOR FOR POWER PLANT, YEAR 2011 1. SIEMENS SST-400 30MW STEAM TURBINE+38MW GENERATOR FOR POWER PLANT 2. BRAND: SIEMENS 3. MODEL: SST400 4. TYPE: STEAM TURBINES 5. CONDITION: NEW QUANTITY: 1 Learn More -
TT-7948 LM2500/1600/6000 GAS TURBINE PARTS: PROCESS EQUIPMENT AND PIPING, YEAR 2025TT-7948 LM2500/1600/6000 GAS TURBINE PARTS: PROCESS EQUIPMENT AND PIPING, YEAR 2025 CONDITION: NEW Learn More