Search results for: 'Com'
- Related search terms
- Complete ca
- comb'
- compo'
- compr
- compa'
- YY-3065 TM2500 GAS TURBINE PACKAGE, 23MW, OVERHAULED 2018, WITH SPARE TURBINE LM2500YY-3065 TM2500 GAS TURBINE PACKAGE, 23MW, OVERHAULED 2018, WITH SPARE TURBINE LM2500 KEY POINTS: 1. THE UNIT IS IMMEDIATELY OPERATIONAL, FACILITATING SWIFT INITIATION OF POWER GENERATION. 2. UNDERWENT A SIGNIFICANT OVERHAUL IN 2018, WITH ABOUT 14,600 HOURS OF OPERATION SINCE. 3. COMPATIBLE WITH NATURAL GAS AND DIESEL, OFFERING FLEXIBILITY IN FUEL USE. 4. SOLD IN ITS CURRENT CONDITION, INCLUDING EXTRA COMPONENTS (TM2500 SPARE HOT SECTION AND A BRUSH GENERATOR NEEDING OVERHAUL). QUANTITY AVAILABLE: 1 Learn More
- TT-3982 GENERAL ELECTRIC PG9171E, 39,900 HOURS, YEAR 2008TT-3982 GENERAL ELECTRIC PG9171E, 39,900 HOURS, YEAR 2008 QUANTITY: 1 Learn More
- TT-3851 TITAN T250 SOLAR TURBINES, NATURAL GAS TURBINE, 22.37 MW, YEAR 2017TT-3851 TITAN T250 SOLAR TURBINES, NATURAL GAS TURBINE, 22.37 MW, YEAR 2017 22.37 MW NEW / NEVER-USED 30,000 HP SOLAR TURBINES TITAN 250 PACKAGE IS A RARE SURPLUS OPPORTUNITY AND OFFERS EXCELLENT ECONOMICS TO A SELECT BUYER. QUANTITY: 1 Learn More
- J-5073 SIEMENS SGT400 GAS TURBINE, DUAL SHAFT, YEAR 2013, 12.9 MW, 10.5 KV, 50 HzJ-5073 SIEMENS SGT400 GAS TURBINE, DUAL SHAFT, YEAR 2013, 12.9 MW, 10.5 KV, 50 Hz MAKE: SIEMENS MODEL: SGT400 DUAL SHAFT YEAR: 2013 HOURS: 12000 POWER OUTPUT: 12.9 MW FREQUENCY: 50 Hz VOLTAGE: 10.5 KV QUANTITY: 1 Learn More
- TT-3267 GENERAL ELECTRIC / AEG-KANIS PG 5341 GAS TURBINE, 50Hz, YEAR 1982TT-3267 GENERAL ELECTRIC / AEG-KANIS PG 5341 GAS TURBINE, 50Hz, YEAR 1982 YEAR OF CONSTRUCTION 1982 CONDITION USED MACHINE TYPE: GAS TURBINE MANUFACTURER: GE / GENERAL ELECTRIC / AEG-KANIS MODEL: PG 5341 “P” YEAR OF CONSTRUCTION: 1982 CONDITION: EXCELLENT (USED) UPDATE: 12.09.2023 RATED POWER: 25MW (EL) EXHAUST GAS TEMPERATURE: 486°C FUEL: FUEL OIL, DIESEL TOTAL RATED THERMAL INPUT: 88,9 MW FREQUENCY: 50Hz SCOPE OF SUPPLY: COMPLETE PLANT WITH 4X: TURBINE-GEARBOX-GENERATOR AND AUXILIARIES Learn More
- TT-2817 GENERAL ELECTRIC LM2500 PE SAC GAS TURBINE, 22.5 MW, WITH GE SIX-STAGE PTTT-2817 GENERAL ELECTRIC LM2500 PE SAC GAS TURBINE, 22.5 MW, WITH GE SIX-STAGE PT QUANTITY: 2 Learn More
- YY-2435 GE TM 2500 GAS TURBINE, MOBILE POWER 24 MW, GE STEWART & STEVENSON MOBILE PACKAGE, QUANTITY 1YY-2435 GE TM 2500 GAS TURBINE, MOBILE POWER 24 MW, GE STEWART & STEVENSON MOBILE PACKAGE, QUANTITY 1 YEAR: 1998 QUANTITY: 1 Learn More
- YY-2425 LM2500 PE SAC, 22.4 MW, WITH GE 6 STAGE POWER TURBINE, GAS TURBINES, QUANTITY 2YY-2425 LM2500 PE SAC, 22.4 MW, WITH GE 6 STAGE POWER TURBINE, GAS TURBINES, QUANTITY 2 ITEM 001 2500 HOURS AFTER ENGINE OVERHAUL ITEM 002 6500 HOURS AFTER ENGINE OVERHAUL Learn More
- TT-2079 SIEMENS GAS TURBINES TYPE SGT-400 DLE – NEW, 12.90 MW, 60 Hz, YEAR 2014TT-2079 SIEMENS GAS TURBINES TYPE SGT-400 DLE – NEW, 12.90 MW, 60 Hz, YEAR 2014 MODEL SGT 400 60 Hz YEAR 2014 NEW AS YOU KNOW THE PRICE OFFERED IS VERY GOOD. NEW/UNUSED QUANTITY: 3 Learn More
- TT-1886 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz, (16 X 3.2MW), YEAR 2008TT-1886 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz, (16 X 3.2MW), YEAR 2008 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz (16 X 3.2MW) MAIN SPECIFICATIONS GAS TURBINE MODEL: M1T-23 BRAND: KAWASAKI POWER OUTPUT: 3,200KWE FREQUENCY & VOLTAGE: 60Hz & 6600V YEAR OF PRODUCTION: 2008 RUNNING HOURS: ABOUT 60 HOURS FUEL OIL: NATURAL GAS PLANT AUXILIARY EQUIPMENT: 1 SET Learn More