YY-2425 LM2500 PE SAC, 22.4 MW, WITH GE 6 STAGE POWER TURBINE, GAS TURBINES, QUANTITY 2
ITEM 001
2500 HOURS AFTER ENGINE OVERHAUL
ITEM 002
6500 HOURS AFTER ENGINE OVERHAUL
Learn More
TT-6239 SIEMENS SGT 600 TURBINE, DLE, YEAR 2011, 25 MW, 10.5 KV, 50 Hz
MAINTENANCE RECORD:
A-THE MAINTENANCE MAINLY INVOLVES PASSING HOT AIR FROM THE DRYER TO THE COMBUSTION CHAMBER. WE HAVE PREVIOUSLY TRIED TURNING THE DRYER. DESICCANT IS PLACED INSIDE THE STEAM DRUM OF THE WASTE HEAT BOILER.
B-THE LAST RUN WAS IN DECEMBER 2017, AND IT WAS STARTED EVERY THREE MONTHS FOR ABOUT A YEAR. FINALLY, WE COMMUNICATED WITH SIEMENS TO ADOPT A LONG-TERM MAINTENANCE METHOD, SO WE DID NOT ATTEMPT TO IGNITE AGAIN.
IMMEDIATE DELIVERY
Learn More
TT-1767 TAURUS T60 TURBINES, 50-60Hz, YEAR 2012
TAURUS T60 TURBINES
TYPE: STANDARD
BRAND: SOLAR
CATEGORY: ENGINES/GENERATORS/MOTORS/TRANSMISSIONS
SUBCATEGORY: TURBINE
TYPE: NEW SURPLUS
CONDITION: EXCELLENT
50Hz NATURAL GAS (CAN CONVERT TO DUAL DIESEL/NG WITH ADDITIONAL CHARGES)
YEAR: 2012
Learn More