Search results for: 'ins'
- Related search terms
- inspec
- inspection
- instruc
- instruct
- ins'
- BIRCH BROTHERS INSPECTION STATIONS, ROLL WIDTH 84”, CLOTH WIDTH 80”, YEAR 1994REFERENCE NUMBER: T-3396 BIRCH BROTHERS INSPECTION STATIONS, ROLL WIDTH 84”, CLOTH WIDTH 80”, YEAR 1994 BIRCH BROTHERS INSPECTION STATIONS ROLL WIDTH: 84” CLOTH WIDTH: 80” YEAR 1994 LIGHTED INSPECTION BOARD TRUE METER MEASURING SYSTEM MERROW SEWING MACHINE ON RAILS ASSISTED DOFF FUNCTION AND CONNECTING CONVEYOR SYSTEM QUANTITY: 4 Learn More
- P-3052 CALATOR DOUBLING & INSPECTION MACHINE YEAR 1997 WIDTH 3400mm
P-3052 CALATOR DOUBLING & INSPECTION MACHINE YEAR 1997 WIDTH 3400mm
CALATOR
DOUBLING & INSPECTION MACHINE
YEAR: 1997
WIDTH: 3400mm
MACHINE WORK ON MILL FLOORQUANTITY: 1
Learn More - C-4202 BOND INSPECTION MACHINE, WIDTH 72”
C-4202 BOND INSPECTION MACHINE, WIDTH 72”
BOND INSPECTION MACHINE
WIDTH: 72”
TRUMETER YARDAGE DEVICEQUANTITY: 2
Learn More - J-0106 MENZEL INSPECTION MACHINE 80” WIDE YEAR 1992
J-0106 MENZEL INSPECTION MACHINE 80” WIDE YEAR 1992
80” WIDE
YEAR 1992
TYPE 80 IMQUANTITY: 1
Learn More - C-4203 MEASUREGRAPH INSPECTION, WIDTH 72”
C-4203 MEASUREGRAPH INSPECTION, WIDTH 72”
MEASUREGRAPH INSPECTION
WIDTH: 72”
WITH DOUBLE AND FOLD ATTACHMENTQUANTITY: 3
Learn More - INSPECTION/ROLLING MACHINE "TESTA" EUREKA YEAR 1992 -2200mmREFERENCE NUMBER: M-4305 (101018CYA9RX) J INSPECTION/ROLLING MACHINE "TESTA" EUREKA YEAR 1992 -2200mm MAİN OPERATİONS OF THE MACHİNE: • CHECK THE FABRİC • CUT THE FABRİC • FABRİC TAKİNG UP İN ROLL • PACKİNG THE FABRİC • AUTOMATİC WEİGHİNG AND LABELLİNG TECHNİCAL CHARACTERİSTİCS: • FULLY AUTOMATİC MACHİNE • WİNDİNG: MİNİMUM DİAMETER 100MM. • WİNDİNG: MAXİMUM DİAMETER 500MM. • MİNİMUM WORKİNG FABRİC 800MM. • MAXİMUM WORKİNG FABRİC 2.200MM. • ROLLS: MAXİMUM WEİGHT KG.100 • MAXİMUM POWER İNSTALLED 27 KW • COMPRESSED AİR PRESSURE 6/7 BAR • ADJUSTABLE TENSİON FABRİC • HARDNESS OF ROLL ADJİUSTABLE QUANTITY AVAILABLE: 1 Learn More
- M-5136 COMPLETE PACKAGE DYE HOUSEREFERENCE NUMBER: M-5136 (1212PZWKHH11) L COMPLETE PACKAGE DYE HOUSE 3 PRESSURE DRYERS 13 HIGH TEMPERATURE CONE DYEING MACHINES 3 LABORATORY HIGH TEMPERATURE DYEING MACHINES 2 LABORATORY HIGH TEMPERATURE DYEING MACHINES 1 COLOUR TESTER 1 LABORATORY DYEING MACHINE 1 LABORATORY HIGH TEMPERATURE CONE DYEING MACHINE 1 CONE CENTRIFUGE 1 WASHING TESTER 2 DRYING OVENS 2 COLOUR TESTER 1 CROCKTESTER QUANTITY AVAILABLE: 1 Learn More
- G-8230 HIGH-TEMPERATURE AND HIGH-PRESSURE YARN DYEING MACHINE 40KG
REFERENCE NUMBER: G-8230
HIGH-TEMPERETURE AND HIGH-PRESSURE YARN DYEING MACHINE 40KG
DESIGNED FOR DYEING, BOILING OFF, BLEACHING, AND WATER WASHING, ETC. SUITABLE FOR HANK YARN, BOBBIN OR RAW STOCK FIBER
MACHINE TYPE: VERTICAL CYLINDER
VAT DIAMETER: Ф600mm
CONE QUANTITY: 7 X 7 = 49 CONES
WORKING TEMPERATURE: 130C
MAX WORKING PRESSURE: 0.4MPA
BOTH RATIO: 1:7 TO 9
WITH COMPUTERIZED CONTROL SYSTEM
HEAT EXCHANGING: COIL TYPE HEAT EXCHANGER, WHICH CAN BE USED FOR EITHER HEATING OR COOLING.
HEAT EXCHANGING SPEED: WHEN THE HEATED STEAM PRESSURE IS 0.4MPA, 40MINUTES WILL BE REQUIRED FOR THE LIQUID INSIDE THE DYEING BARREL RAISING FROM 20OC TO 130OC. WHEN THE COOLING WATER PRESSURE IS 0. 3MPA AND THE WATER TEMPERATURE IS 20 OC, 40 MINUTES WILL BE REQUIRED FOR THE LIQUID INSIDE THE DYEING BECK TO LOWER FROM 130OC TO 80OC.
RECYCLING OF DYEING LIQUID: THE POSITIVE AND NEGATIVE RECYCLING OF DYEING LIQUID WILL BE ADJUSTED BY THE CYLINDER THROUGH THE SWITCHING DEVICE INSIDE THE CENTRIFUGAL PUMP.
SEALING OF BOILER: RUBBER ADHESIVE
THE WORKING PRESSURE INSIDE THE TANK WILL MAKE THE RUBBER SEAL CLOSELY TO ATTACH THE FLANGE. THE CONICAL SURFACE OF THE TANK MOUTH IS TO ENHANCE THE SEALING.
OPENING OF TANK COVER: FIRST OPEN THE AIR VALVE TO RELEASE THE PRESSURE INSIDE THE BOILER. WAIT UNTIL NO EXHAUSTED AIR GOING THRU THE EXHAUST VALVE AND THE READING OF PRESSURE GAUGE IS ZERO, WITHDRAW THE WRENCH HANDLE, OPEN THE CLAMPING HOOP TO REMOVE THE FLANGE; AND THEN OPEN THE COVER WITH DRAG WEIGHT. THE COVER WILL BE CLOSED.
CONFIGURATION:
1. ELECTRICAL CABINET: STAINLESS STEEL CABINET, PLASTIC COATING
2. ELECTRICAL COMPONENTS: SIEMENS, OMRON
3. COMPUTER: HG COMPUTER (MADE IN CHINA)
4. ELECTROMAGNETIC VALVE: TAIWAN YADEKE
5. PUMP: CENTRIFUGAL PUMP
6. MOTOR: WANNAN MOTOR
7. TEMPERATURE CONTROL: COMPUTER CONTROL, WITH HEATING, COOLING, KEEPING WARM, ETC. FUNCTION.
8. HEAT EXCHANGER: INTERNAL COIL HEATING
9. VALVE: STAINLESS ANGLE VALVES, PNEUMATIC BUTTERFLY VALVES
10. ONE CARRIER BASKET
11. MACHINE BODY MATERIAL: STAINLESS STEEL, 316 LITERS
12. ACCESSORIES: SEAL RING FOR DYE VAT, SEAL FOR MAIN PUMP, SEAL FOR REVERSING SHAFT
QUANTITY: 1
Learn More