Search results for: 'the act'
- Related search terms
- Thermo
- the'|||'
- act
- therm
- thermal b'
-
K-2008 TANDEM SET OF GESSNER LYNX 2000 NAPPERS YEAR 1997REFERENCE NUMBER: K-2008
TANDEM SET OF GESSNER LYNX 2000 NAPPERS YEAR 1997
TWO GESSNER LYNX 2000 KNIT GOODS AND DOUBLE ACTING 108” ELECTRONIC NAPPERS
VERY GOOD CONDITION
INCLUDES TWO SETS OF SPARE NAPPER ROLLS, ROLL SHARPENER AND GRINDER, FLOCK HOUSING
RACKS NOT INCLUDED WITH SPARE ROLLERS
YEAR: 1997
108” FACE WIDTH
ELECTRIC DRIVE
TWO NAPPERS ONE IN FRONT OF THE OTHER
24-ROLL NAPPERS
DOUBLE ACTING HAS TO DO WITH THE TYPE WIRE ON THE ROLLS AND THE DIRECTION THAT THE CYLINDER TURNS.
THE GESSNER “LYNX” ELECTRONIC NAPPER IS MADE TO RUN EITHER KNITS OR WOVENS; THERE IS A KEY WHICH YOU TURN TO SELECT THE MODE YOU WANT, KNIT-OR-WOVENS, AND THE CYLINDER REVERSES.
QUANTITY: 1
(EMAIL US FOR PICTURES)
Learn More -
M-1861 SANTEX PRE-TREATMENT AND WASHING MACHINE TYPE ACTIWASH YEAR 2002REFERENCE NUMBER: M-1861 (1313235MKD12RX) SANTEX PRE-TREATMENT AND WASHING MACHINE TYPE ACTIWASH YEAR 2002 DESIGNED FOR LOW-TENSION PRE-TREATMENT OF WOVEN AND KNITTED GOODS MANUFACTURER: SANTEX - SWITZERLAND YEAR OF MANUFACTURE: 2002 WORKING WIDTH: 2200/1800 mm SPEED OF MACHINE: 3-100 M/MIN PRODUCTION SPEED: APPROX. 75 M/MIN THE DAILY OUTPUT WILL DEPEND E.G. ON QUALITY AND WEIGHT OF FABRICS/KNIT GOODS YOU WILL WASH ON THESE MACHINES. SO FAR THE PLANT WAS RUNNING AT AN AVERAGE SPEED OF 40 M/MIN, I.E. 2,400 MTRS PER WORKING HOUR. QUANTITY AVAILABLE: 1 Learn More -
A-1861 SANTEX PRE-TREATMENT AND WASHING MACHINE TYPE ACTIWASH YEAR 2002REFERENCE NUMBER: M-1861 (770235KOL6RX) SANTEX PRE-TREATMENT AND WASHING MACHINE TYPE ACTIWASH YEAR 2002 DESIGNED FOR LOW-TENSION PRE-TREATMENT OF WOVEN AND KNITTED GOODS MANUFACTURER: SANTEX - SWITZERLAND YEAR OF MANUFACTURE: 2002 WORKING WIDTH: 2200/1800 mm SPEED OF MACHINE: 3-100 M/MIN PRODUCTION SPEED: APPROX. 75 M/MIN THE DAILY OUTPUT WILL DEPEND E.G. ON QUALITY AND WEIGHT OF FABRICS/KNIT GOODS YOU WILL WASH ON THESE MACHINES. SO FAR THE PLANT WAS RUNNING AT AN AVERAGE SPEED OF 40 M/MIN, I.E. 2,400 MTRS PER WORKING HOUR. QUANTITY AVAILABLE: 1 Learn More