YY-3279 SGT – 600 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOM
UNIT(S) TO BE SUPPLIED ARE UNUSED, WITH ZERO RUNNING HOURS, NEVER INSTALLED.
Learn More
YY-2967 GE 9371FA GAS TURBINE GENERATOR 228.9MW + STEAM TURBINE GENERATOR HARBIN TURBIN/CHINA 127MW, ALTANATOR FOR GT TOSHIBA 299KVA 50Hz, FOR STEAM TURBINE HARBIN 158.824MVA 50Hz
YEAR OF MFG IS 2008 BUT START OPERATION FROM 2012, TOTAL OPERATION HOUR IS 23,000 HOURS. COMPLEX BOROSCOPE INSPECTION MADE ON 2021 AND TOP CONDITION AND NO FURTHER REPAIR MEASURES ARE NECESSARY.
Learn More
TT-7587 SIEMENS TG50D5/W701DS GAS TURBINE GENERATOR, 127.8 MW, YEAR 1995
1. SIEMENS WESTINGHOUSE TG50D5/W701DS 127.8 MW GAS TURBINE GENERATOR PACKAGES FOR SALE. THE TURBINE PACKAGES TOGETHER OFFER 255 MW READY TO SHIP EQUIPMENT. THIS TECHNOLOGY IS ONE OF THE MOST WIDESPREAD MIDDLE SIZE ENGINES (100-104 MW) FOR POWER GENERATION AND THE ONLY TURBINE OF ITS SIZE THAT CAN OPERATE ON HEAVY FUEL OIL (HFO).
2. THE UNITS ARE OFFERED WITH SOME OF THE REQUIRED BALANCE OF PLANT BY SEPARATE NEGOTIATION.
3. THESE UNITS WERE INSTALLED AND OPERATED IN A POWER STATION FROM 1996 UNTIL THE END OF 2004, WHEN THEY WERE DISMANTLED AS THE RESULT OF A PLANT UPGRADE. THE UNITS WERE PURCHASED AND UPGRADED BY THE BUYER TO 127.8 MW NOMINAL CAPACITY EACH. THEY ALSO FULLY REFURBISHED THE UNITS TO ZERO HOURS. THE TURBINES HAVE THE CAPABILITY OF BEING ABLE TO SWITCH BETWEEN NATURAL GAS AND LIQUID FUEL WHILE STILL OPERATING UNDER LOAD.
QUANTITY: 2
Learn More
J-4753 GE FRAME 9E GAS TURBINE GENERATOR UNITS, 109.49 MW
TWO UNITS OF FRAME 9E GAS TURBINE GENERATOR UNITS (CONSISTING OF AUXILIARY COMPARTMENT, TURBINE COMPARTMENT, GENERATOR COMPARTMENT)
TWO UNITS OF MARK V CONTROL SYSTEM
1 UNIT OF GE STEAM TURBINE GENERATOR UNIT (118.26 MW) (CONSISTING OF AUXILIARY COMPARTMENT, STEAM TURBINE COMPARTMENT, GENERATOR COMPARTMENT)
YEAR: 1992
Learn More
YY-2908 UNUSED 15.2MW SOLAR T 130 GAS TURBINE GENERATOR PACKAGES, QUANTITY 2, 22.789 KVA, 11 KV, 50 Hz
YEAR OF MANUFACTURE: 2013/14
CONDITION: AS NEW
OPERATING HOURS: 0
STATUS: INSTALLED
FUEL: NG OR SYNGAS
QUANTITY: 2 Learn More
YY-2991 SIEMENS SGT-A05 GAS TURBINE MOBILE GENERATORS, 12 UNITS
MULTIPLE UNITS AVAILABLE
LOW HOUR AERO-DERIVATIVE GAS TURBINE PACKAGES
TOTAL QUANTITY: 12
Learn More
TT-1391 GENERAL ELECTRIC LM2500+ G4 GAS TURBINE GENERATOR
GENERAL ELECTRIC LM2500+ G4 GAS TURBINE GENERATOR
CONDITION: VERY GOOD
AVAILABLE ALSO WITH WARRANTY IN Q1 2023
DELIVERY: FIRST QUARTER OF 2023
QUANTITY: 1
Learn More
TT-4816 SOLAR TITAN130S TURBINE GENERATOR, NATURAL GAS, 15,000KW, YEAR 2013, 60 Hz
BRAND SOLAR
MODEL TITAN130S
TYPE GAS TURBINES
CONDITION NEW
YEAR 2013
60 Hz
HOURS 0
QUANTITY: 1
Learn More
TT-4529 GENERAL ELECTRIC TURBINE GENERATOR – NEW, NATURAL GAS, 90MW, 60Hz, 7EA + HRSG COGENERATION PLANT, YEAR 2015
EQUIPMENT OVERVIEW
NEW / NEVER-USED SURPLUS
MANUFACTURED IN 2015
GE 71 EA 91.95 MW NATURAL GAS TURBINE
GE 7A6 121000 KVA 60 Hz 13000 V AIR-COOLED GENERATOR
COMPLETE WITH ACCESSORY BASE AND ANCILLARY EQUIPMENT
OPTIONALLY AVAILABLE HEAT RECOVERY STEAM GENERATOR (HRSG) AND ANCILLARY EQUIPMENT
CRATED AND PRESERVED TO OEM SCHEDULE IN CLIMATE CONTROLLED WAREHOUSES
Learn More