YY-3279 SGT – 600 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOM
UNIT(S) TO BE SUPPLIED ARE UNUSED, WITH ZERO RUNNING HOURS, NEVER INSTALLED.
Learn More
TT-4529 GENERAL ELECTRIC TURBINE GENERATOR – NEW, NATURAL GAS, 90MW, 60Hz, 7EA + HRSG COGENERATION PLANT, YEAR 2015
EQUIPMENT OVERVIEW
NEW / NEVER-USED SURPLUS
MANUFACTURED IN 2015
GE 71 EA 91.95 MW NATURAL GAS TURBINE
GE 7A6 121000 KVA 60 Hz 13000 V AIR-COOLED GENERATOR
COMPLETE WITH ACCESSORY BASE AND ANCILLARY EQUIPMENT
OPTIONALLY AVAILABLE HEAT RECOVERY STEAM GENERATOR (HRSG) AND ANCILLARY EQUIPMENT
CRATED AND PRESERVED TO OEM SCHEDULE IN CLIMATE CONTROLLED WAREHOUSES
Learn More
YY-2961 25 MW GAS TURBINE GENERATOR (GT 10B2 - SGT 600)
BRIEF PLANT HISTORY:
THE GT PACKAGE IS THE FAMOUS GT 10 B2 DLE PG WHICH WAS COMMISSIONED IN 2001 CONSISTING OF GAS TURBINE, GENERATOR AND ALL RELATED AUXILIARIES EQUIPMENT/SYSTEMS. IT IS IN EXCELLENT CONDITION AND AVAILABLE FOR IMMEDIATE SALE AND RELOCATION.
QUANTITY: 3
Learn More
YY-2907 LM2500 PLUS PK- MDWG03 GAS TURBINE-GENERATOR PACKAGES, YEAR 2002, QUANTITY 2, 30 MW, 11 KV, 50 Hz
YEAR OF MANUFACTURE: 2002
YEAR COMMISSIONED: 2005
OPERATING HOURS: 55,000
HOURS AFTER LAST MO: ~5,000 ONLY
STATUS: ON FOUNDATION
FUEL: NATURAL GAS & LIQUID FUEL
QUANTITY: 2 Learn More