YY-2967 GE 9371FA GAS TURBINE GENERATOR 228.9MW + STEAM TURBINE GENERATOR HARBIN TURBIN/CHINA 127MW, ALTANATOR FOR GT TOSHIBA 299KVA 50Hz, FOR STEAM TURBINE HARBIN 158.824MVA 50Hz
YEAR OF MFG IS 2008 BUT START OPERATION FROM 2012, TOTAL OPERATION HOUR IS 23,000 HOURS. COMPLEX BOROSCOPE INSPECTION MADE ON 2021 AND TOP CONDITION AND NO FURTHER REPAIR MEASURES ARE NECESSARY.
Learn More
YY-2311 GE TM2500+ GENERATION 6 GENERATOR PACKAGE – 26 MW EACH, 11,000 V, 50/60 Hz, DIESEL OR NATURAL GAS, YEAR 2011
-AT 50 Hz THE UNITS ARE DESIGNED TO PRODUCE 26 MW OF POWER
-AT 60 Hz THE UNITS ARE DESIGNED TO PRODUCE 30 MW OF POWER
-DEPENDING ON LOCATION TEMPERATURE
-THESE ARE CONTINUOUS POWER UNITS
DETAILS:
1. 31MW CONTINUOUS RATED (GE ADVERTISED AT ISO CONDITIONS);
2. YEAR OF MANUFACTURE: 2011;
3. PACKAGE SN: 2011-TM006 AND 2011-TM008;
4. CURRENTLY CONFIGURED AS 11KV 50HZ, YET CAN OPERATE AT EITHER 50HZ OR 60HZ;
5. 2 UNITS AVAILABLE;
6. EQUIPMENT IS CONFIGURED TO OPERATE ON LIQUID FUEL OR NATURAL GAS;
7. CURRENT OPERATING HOURS AS OF JULY 30, 2022: TM006 – 1726 HOURS TM008 – 2174 HOURS;
8. HOURS REFLECT TOTAL TIME SINCE NEW:
HOURS MAY GO UP AS UNITS ARE STILL CONNECTED FOR EMERGENCY USE ONLY.
9. PRICE INCLUDES THE GT1 REPAIRS RECOMMENDED BY GE IN THE ATTACHED INVESTIGATIVE REPORT;
10. HPT REPLACEMENT ON GT1 ONLY:
- LEAD TIME FOR REPAIRS IS 12-14 WEEKS BASED ON CURRENT AVAILABILITY (SUBJECT TO CHANGE);
- SCOPE OF SUPPLY FOR EACH UNIT IS LISTED IN APPENDIX A.
Learn More