YY-2311 GE TM2500+ GENERATION 6 GENERATOR PACKAGE – 26 MW EACH, 11,000 V, 50/60 Hz, DIESEL OR NATURAL GAS, YEAR 2011
YY-2311 GE TM2500+ GENERATION 6 GENERATOR PACKAGE – 26 MW EACH, 11,000 V, 50/60 Hz, DIESEL OR NATURAL GAS, YEAR 2011
-AT 50 Hz THE UNITS ARE DESIGNED TO PRODUCE 26 MW OF POWER
-AT 60 Hz THE UNITS ARE DESIGNED TO PRODUCE 30 MW OF POWER
-DEPENDING ON LOCATION TEMPERATURE
-THESE ARE CONTINUOUS POWER UNITS
DETAILS:
1. 31MW CONTINUOUS RATED (GE ADVERTISED AT ISO CONDITIONS);
2. YEAR OF MANUFACTURE: 2011;
3. PACKAGE SN: 2011-TM006 AND 2011-TM008;
4. CURRENTLY CONFIGURED AS 11KV 50HZ, YET CAN OPERATE AT EITHER 50HZ OR 60HZ;
5. 2 UNITS AVAILABLE;
6. EQUIPMENT IS CONFIGURED TO OPERATE ON LIQUID FUEL OR NATURAL GAS;
7. CURRENT OPERATING HOURS AS OF JULY 30, 2022: TM006 – 1726 HOURS TM008 – 2174 HOURS;
8. HOURS REFLECT TOTAL TIME SINCE NEW:
HOURS MAY GO UP AS UNITS ARE STILL CONNECTED FOR EMERGENCY USE ONLY.
9. PRICE INCLUDES THE GT1 REPAIRS RECOMMENDED BY GE IN THE ATTACHED INVESTIGATIVE REPORT;
10. HPT REPLACEMENT ON GT1 ONLY:
- LEAD TIME FOR REPAIRS IS 12-14 WEEKS BASED ON CURRENT AVAILABILITY (SUBJECT TO CHANGE);
- SCOPE OF SUPPLY FOR EACH UNIT IS LISTED IN APPENDIX A.
In stock
SKU
YY-2311
REFERENCE NUMBER: YY-2311
GE TM2500+ GENERATION 6 GENERATOR PACKAGE – 26 MW EACH, 11,000 V, 50/60 Hz,
DIESEL OR NATURAL GAS, YEAR 2011
-AT 50 Hz THE UNITS ARE DESIGNED TO PRODUCE 26 MW OF POWER
-AT 60 Hz THE UNITS ARE DESIGNED TO PRODUCE 30 MW OF POWER
-DEPENDING ON LOCATION TEMPERATURE
-THESE ARE CONTINUOUS POWER UNITS
DETAILS:
1. 31MW CONTINUOUS RATED (GE ADVERTISED AT ISO CONDITIONS);
2. YEAR OF MANUFACTURE: 2011;
3. PACKAGE SN: 2011-TM006 AND 2011-TM008;
4. CURRENTLY CONFIGURED AS 11KV 50HZ, YET CAN OPERATE AT EITHER 50HZ OR 60HZ;
5. 2 UNITS AVAILABLE;
6. EQUIPMENT IS CONFIGURED TO OPERATE ON LIQUID FUEL OR NATURAL GAS;
7. CURRENT OPERATING HOURS AS OF JULY 30, 2022: TM006 – 1726 HOURS TM008 – 2174 HOURS;
8. HOURS REFLECT TOTAL TIME SINCE NEW:
HOURS MAY GO UP AS UNITS ARE STILL CONNECTED FOR EMERGENCY USE ONLY.
9. PRICE INCLUDES THE GT1 REPAIRS RECOMMENDED BY GE IN THE ATTACHED INVESTIGATIVE REPORT;
10. HPT REPLACEMENT ON GT1 ONLY:
- LEAD TIME FOR REPAIRS IS 12-14 WEEKS BASED ON CURRENT AVAILABILITY (SUBJECT TO CHANGE);
- SCOPE OF SUPPLY FOR EACH UNIT IS LISTED IN APPENDIX A.
EQUIPMENT MUST BE PURCHASED TOGETHER
THE UNITS HAVE A RATED POWER OUTPUT OF 26MW AT 50HZ, ARE DUAL FREQUENCY AND DUAL FUEL (CAN RUN ON DIESEL OR GAS).
PLEASE SEE THE STANDARD SCOPE OF SUPPLY AND LAYOUT OF A TM2500+ GEN 6 UNIT ATTACHED.
SCOPE OF SUPPLY
MAIN TRAILER
- GAS TURBINE
- GENERATOR
- TURBINE ENCLOSURE
- LUBE OIL SYSTEMS
- SWITCHGEAR
AUXILIARY TRAILER
- AUXILIARY TRAILER SKID
- ELECTRO-HYDRAULIC START SYSTEM
- LIQUID FUEL DELIVERY SYSTEM
- NATURAL GAS FUEL DELIVERY SYSTEM
- WATER INJECTION SYSTEM
- “OFF LINE” SOAK WASH SYSTEM
- FIRE PROTECTION SYSTEM
- FIN FAN COOLER
CONTROL HOUSE
- DIGITAL CONTROL SYSTEM
- GENERATOR PROTECTIVE RELAYS
- UNIT MOTOR CONTROL CENTER (MCC)
- BATTERIES AND BATTERY CHARGING SYSTEM
- HVAC CONTROL
MAIN TRANSFORMER
AUXILIARY TRANSFORMER
AT 50 Hz THE UNITS ARE DESIGNED TO PRODUCE 26 MW OF POWER
AT 60 Hz THE UNITS ARE DESIGNED TO PRODUCE 30 MW OF POWER
DEPENDING ON LOCATION TEMPERATURE
THESE ARE CONTINUOUS POWER UNITS
Write Your Own Review