Search results for: 'turbine 1'
- Related search terms
- turbine
- turbine v
- Turbine 13”
- turbine T
- turbine genera
-
YY-2967 GE 9371FA GAS TURBINE GENERATOR 228.9MW + STEAM TURBINE GENERATOR HARBIN TURBIN/CHINA 127MW, ALTANATOR FOR GT TOSHIBA 299KVA 50Hz, FOR STEAM TURBINE HARBIN 158.824MVA 50HzYY-2967 GE 9371FA GAS TURBINE GENERATOR 228.9MW + STEAM TURBINE GENERATOR HARBIN TURBIN/CHINA 127MW, ALTANATOR FOR GT TOSHIBA 299KVA 50Hz, FOR STEAM TURBINE HARBIN 158.824MVA 50Hz YEAR OF MFG IS 2008 BUT START OPERATION FROM 2012, TOTAL OPERATION HOUR IS 23,000 HOURS. COMPLEX BOROSCOPE INSPECTION MADE ON 2021 AND TOP CONDITION AND NO FURTHER REPAIR MEASURES ARE NECESSARY. Learn More -
TT-7587 SIEMENS TG50D5/W701DS GAS TURBINE GENERATOR, 127.8 MW, YEAR 1995TT-7587 SIEMENS TG50D5/W701DS GAS TURBINE GENERATOR, 127.8 MW, YEAR 1995 1. SIEMENS WESTINGHOUSE TG50D5/W701DS 127.8 MW GAS TURBINE GENERATOR PACKAGES FOR SALE. THE TURBINE PACKAGES TOGETHER OFFER 255 MW READY TO SHIP EQUIPMENT. THIS TECHNOLOGY IS ONE OF THE MOST WIDESPREAD MIDDLE SIZE ENGINES (100-104 MW) FOR POWER GENERATION AND THE ONLY TURBINE OF ITS SIZE THAT CAN OPERATE ON HEAVY FUEL OIL (HFO). 2. THE UNITS ARE OFFERED WITH SOME OF THE REQUIRED BALANCE OF PLANT BY SEPARATE NEGOTIATION. 3. THESE UNITS WERE INSTALLED AND OPERATED IN A POWER STATION FROM 1996 UNTIL THE END OF 2004, WHEN THEY WERE DISMANTLED AS THE RESULT OF A PLANT UPGRADE. THE UNITS WERE PURCHASED AND UPGRADED BY THE BUYER TO 127.8 MW NOMINAL CAPACITY EACH. THEY ALSO FULLY REFURBISHED THE UNITS TO ZERO HOURS. THE TURBINES HAVE THE CAPABILITY OF BEING ABLE TO SWITCH BETWEEN NATURAL GAS AND LIQUID FUEL WHILE STILL OPERATING UNDER LOAD. QUANTITY: 2 Learn More -
J-4753 GE FRAME 9E GAS TURBINE GENERATOR UNITS, 109.49 MWJ-4753 GE FRAME 9E GAS TURBINE GENERATOR UNITS, 109.49 MW TWO UNITS OF FRAME 9E GAS TURBINE GENERATOR UNITS (CONSISTING OF AUXILIARY COMPARTMENT, TURBINE COMPARTMENT, GENERATOR COMPARTMENT) TWO UNITS OF MARK V CONTROL SYSTEM 1 UNIT OF GE STEAM TURBINE GENERATOR UNIT (118.26 MW) (CONSISTING OF AUXILIARY COMPARTMENT, STEAM TURBINE COMPARTMENT, GENERATOR COMPARTMENT) YEAR: 1992 Learn More -
YY-3279 SGT – 600 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOMYY-3279 SGT – 600 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOM UNIT(S) TO BE SUPPLIED ARE UNUSED, WITH ZERO RUNNING HOURS, NEVER INSTALLED. Learn More -
TT-1391 GENERAL ELECTRIC LM2500+ G4 GAS TURBINE GENERATORTT-1391 GENERAL ELECTRIC LM2500+ G4 GAS TURBINE GENERATOR GENERAL ELECTRIC LM2500+ G4 GAS TURBINE GENERATOR CONDITION: VERY GOOD AVAILABLE ALSO WITH WARRANTY IN Q1 2023 DELIVERY: FIRST QUARTER OF 2023 QUANTITY: 1 Learn More -
TT-6644 CENTRAX GAS TURBINE GENERATOR, 2.5MW, YEAR 1981TT-6644 CENTRAX GAS TURBINE GENERATOR, 2.5MW, YEAR 1981 1. COMPLETE GAS TURBINE GENERATING SYSTEM 2. TOTAL RUNNING HOURS: 1546 QUANTITY: 1 Learn More -
YY-2908 UNUSED 15.2MW SOLAR T 130 GAS TURBINE GENERATOR PACKAGES, QUANTITY 2, 22.789 KVA, 11 KV, 50 HzYY-2908 UNUSED 15.2MW SOLAR T 130 GAS TURBINE GENERATOR PACKAGES, QUANTITY 2, 22.789 KVA, 11 KV, 50 Hz YEAR OF MANUFACTURE: 2013/14 CONDITION: AS NEW OPERATING HOURS: 0 STATUS: INSTALLED FUEL: NG OR SYNGAS QUANTITY: 2 Learn More -
TT-5583 GENERAL ELECTRIC FRAME 7EA GAS TURBINE GENERATOR SET, 81 MW, YEAR 1990, 60 HzTT-5583 GENERAL ELECTRIC FRAME 7EA GAS TURBINE GENERATOR SET, 81 MW, YEAR 1990, 60 Hz QUANTITY: 1 Learn More -
TT-5848 SIEMENS SGT-400 NATURAL GAS TURBINE GENSETS, 13MW, 50Hz, YEAR 2022TT-5848 SIEMENS SGT-400 NATURAL GAS TURBINE GENSETS, 13MW, 50Hz, YEAR 2022 SIEMENS SGT-400 52MW (13MW X 4) NATURAL GAS TURBINE GENSETS QUANTITY: 4 Learn More -
YY-2961 25 MW GAS TURBINE GENERATOR (GT 10B2 - SGT 600)YY-2961 25 MW GAS TURBINE GENERATOR (GT 10B2 - SGT 600) BRIEF PLANT HISTORY: THE GT PACKAGE IS THE FAMOUS GT 10 B2 DLE PG WHICH WAS COMMISSIONED IN 2001 CONSISTING OF GAS TURBINE, GENERATOR AND ALL RELATED AUXILIARIES EQUIPMENT/SYSTEMS. IT IS IN EXCELLENT CONDITION AND AVAILABLE FOR IMMEDIATE SALE AND RELOCATION. QUANTITY: 3 Learn More