Search results for: 'SIEMENS'
- Related search terms
- Siemens gen
- siemens gas turbine
- SIEMENS GAS TURBINE
- SIEMENS GAS TURBINE'
- SIEMENS++GAS+TURBINE
- TT-7913 SIEMENS SST-300 COMPLETE STEAM POWER GENERATOR, 20.29 MW, YEAR 2021, 50HzTT-7913 SIEMENS SST-300 COMPLETE STEAM POWER GENERATOR, 20.29 MW, YEAR 2021, 50Hz 1. UNPACKED - STILL BOXED AND CRATED - COMPLETE PLANT 2. NEW UNUSED 3. MODEL: SIEMENS SST-300 4. YEAR OF MANUFACTURE: 2021 Learn More
- K-8156 SIEMENS SCHUCKERTWERKE AG COAL FIRED POWER PLANT 120 MW YEAR 1967
K-8156 SIEMENS SCHUCKERTWERKE AG COAL FIRED POWER PLANT 120 MW YEAR 1967
COAL FIRED POWER PLANT, 120 MW
MANUFACTURER: SIEMENS - SCHUCKERTWERKE AG
TYPE: CONDENSING - EXTRACTION
FUEL: COAL
SPEED: 3000 U/MIN
POWER: MINIMUM: 125 MW
MAXIMUM: 140 MW
PRESSURE: 185 BAR
TEMPERATURE: 530°C
FREQUENCY: 48.5 - 51.5 HZ
YEAR: 1967
BOILER: BABCOCKSCOPE OF SUPPLY:
-REA AND DENOS (LOW NOx AND SULFUR), INCLUDING SCR-CATALYSATOR AND ELECTROFILTER
-TURBINE
0BOILER
-COAL CRASHER
-COAL BUNKER/STORAGE/TRANSPORTATION
-CONDENSER
-PUMPS AND PIPING
-WATERDEMIRALISTAION
-CHIMNEY
-COOLING SYSTEM AND COOLERS
-LUBRICATION OIL
-COMPRESSOR AIR
-FRESH AIR SYSTEM
-CRANAGE
-ENGINE AND PLANT PLC, MANUFACTURER SIEMENS
-HIGH VOLTAGE
-TRANSFORMER
-ELECTRICAL BOXES AND SWITCHESQUANTITY: 1
Learn More - K-2539 SIEMENS COMPLETE POWER PLANT 180MW YEAR 2001
K-2539 SIEMENS COMPLETE POWER PLANT 180MW YEAR 2001
MAKE: SIEMENS
2 UNITS V 64.3 SIEMENS GAS TURBINES AND STEAM TURBINE
2 BOILERS AND AUXILIARIES
NATURAL GAS AND LFO
50 HZQUANTITY: 1
Learn More - K-2541 SIEMENS WESTINGHOUSE AND MITSUBISHI COMBINED CYCLE PLANT 73MW YEAR 1999
K-2541 SIEMENS WESTINGHOUSE AND MITSUBISHI COMBINED CYCLE PLANT 73MW YEAR 1999
MAKE: SIEMENS WESTINGHOUSE AND MITSUBISHI
NATURAL GAS
73 MW
YEAR 1999
50 HZQUANTITY: 1
Learn More - C-2580 SIEMENS COAL FIRED PLANTS, YEAR 1967 TO 1971
C-2580 SIEMENS COAL FIRED PLANTS, YEAR 1967 TO 1971
ITEM 001
SIEMENS
OUTPUT (MW): 160
PRES./FLOW/TEMP: 193 BAR/530°
COAL FIRED POWER PLANT
YEAR: 1971
VERY GOOD CONDITIONQUANTITY: 1
ITEM 002
SIEMENS
OUTPUT (MW): 142
PRES./FLOW/TEMP: 193 BAR/530°
COAL FIRED POWER PLANT
YEAR: 1970
GOOD CONDITIONQUANTITY: 1
ITEM 003
SIEMENS
OUTPUT (MW): 120
PRES./FLOW/TEMP: 185 BAR/530°C
COAL FIRED POWER PLANT
YEAR: 1967
GOOD CONDITIONQUANTITY: 1
Learn More - K-2582 SIEMENS COAL AND BIOMASS POWER PLANT 2.5MW YEAR 2002
K-2582 SIEMENS COAL AND BIOMASS POWER PLANT 2.5MW YEAR 2002
WAS BUILT TO SUPPLY THE PAPER MILL WITH STEAM AND ELECTRICITY
MAKE: SIEMENS
MODEL: CFR5 G6a
2.5MW
65 BAR
480 ˚ C
REVOLUTION NUMBER: 23000 U PER MINUTE
EVAPORATION PRESSURE: 1-10 BAR
YEAR 2002
THE STEAM TUBINE AND THE GENERATOR WERE CHANGES AND ARE NEW
HOURS: LESS THAN 30,000
BOILER SYSTEM WAS COMPLETELY RECONDITIONED
THE WATER TREATMENT PLANT WAS RECONDITIONED
EXHAUST CLEANING SYSTEM WAS RECONDITIONED
ASH AND COAL TRANSPORTATION SYSTEMS WERE RECONDITIONEDQUANTITY: 1
Learn More - K-2572 SIEMENS COAL FIRED POWER PLANT 120MW YEAR 1967
K-2572 SIEMENS COAL FIRED POWER PLANT 120MW YEAR 1967
120 MW
185 BAR
530 ˚ C
YEAR 1967
GOOD CONDITIONQUANTITY: 1
Learn More - ALSTOM GAS POWER PLANT, 252 MWREFERENCE NUMBER: T-6937 ALSTOM GAS POWER PLANT, 252 MW ALSTOM GAS POWER PLANT 252 MW WITH SIEMENS TECHNOLOGY STILL INSTALLED, USED ONLY TEST AND MAINTENANCE OPERATION 500 HOURS QUANTITY: 1 Learn More
- K-2548 COMPLETE POWER PLANT 4.9MW YEAR 1997
K-2548 COMPLETE POWER PLANT 4.9MW YEAR 1997
SIEMENS SGT 100 DRY LOW NOx
4.9MW
11KV
INCLUDING HRSG 20 BAR, 20 T/H
GAS FUEL
YEAR 1997- 30000 HOURS
50 HZQUANTITY: 1
Learn More - K-2546 COMPLETE PACKAGE 6.75MW YEAR 1993
K-2546 COMPLETE PACKAGE 6.75MW YEAR 1993
SIEMENS –TORANDO 2,3
6.75 MW
YEAR 1993- MODEL 2006
50 HZQUANTITY: 1
Learn More