Search results for: '1"'`--,((('(,",,))'''A=0'
- Related search terms
- 1"'`--,((('(,",,))'''a=0'
- 1"'`--,((('(,",,))'''a=0',(;))#- --
- 1"'`--,((('(,",,))'''a=0',(;))
- 1"'`--,((('(,",,))'''a=0',(;))#-+--
- K-2539 SIEMENS COMPLETE POWER PLANT 180MW YEAR 2001
K-2539 SIEMENS COMPLETE POWER PLANT 180MW YEAR 2001
MAKE: SIEMENS
2 UNITS V 64.3 SIEMENS GAS TURBINES AND STEAM TURBINE
2 BOILERS AND AUXILIARIES
NATURAL GAS AND LFO
50 HZQUANTITY: 1
Learn More - K-8156 SIEMENS SCHUCKERTWERKE AG COAL FIRED POWER PLANT 120 MW YEAR 1967
K-8156 SIEMENS SCHUCKERTWERKE AG COAL FIRED POWER PLANT 120 MW YEAR 1967
COAL FIRED POWER PLANT, 120 MW
MANUFACTURER: SIEMENS - SCHUCKERTWERKE AG
TYPE: CONDENSING - EXTRACTION
FUEL: COAL
SPEED: 3000 U/MIN
POWER: MINIMUM: 125 MW
MAXIMUM: 140 MW
PRESSURE: 185 BAR
TEMPERATURE: 530°C
FREQUENCY: 48.5 - 51.5 HZ
YEAR: 1967
BOILER: BABCOCKSCOPE OF SUPPLY:
-REA AND DENOS (LOW NOx AND SULFUR), INCLUDING SCR-CATALYSATOR AND ELECTROFILTER
-TURBINE
0BOILER
-COAL CRASHER
-COAL BUNKER/STORAGE/TRANSPORTATION
-CONDENSER
-PUMPS AND PIPING
-WATERDEMIRALISTAION
-CHIMNEY
-COOLING SYSTEM AND COOLERS
-LUBRICATION OIL
-COMPRESSOR AIR
-FRESH AIR SYSTEM
-CRANAGE
-ENGINE AND PLANT PLC, MANUFACTURER SIEMENS
-HIGH VOLTAGE
-TRANSFORMER
-ELECTRICAL BOXES AND SWITCHESQUANTITY: 1
Learn More - K-2547 GAS TURBINE POWER PLANT 5.2MW YEAR 1989
K-2547 GAS TURBINE POWER PLANT 5.2MW YEAR 1989
SOLAR TAURUS 6- SOLO NOx
5.2MW
YEAR 1989- GAS TURBINE RECONDITIONED IN 2010
STEAM BOILER
25 T/H/ 16-25 BAR AND GAS COMPRESSORS
NATURAL GAS
50 HZQUANTITY: 1
Learn More - K-2543 COMBINED CYCLE POWER PLANT 40MW YEAR 1992
K-2543 COMBINED CYCLE POWER PLANT 40MW YEAR 1992
GE FRAME 6B, DRY LOW NOX
NATURAL GAS AND LIGHT OIL
40 MW
YEAR 1992-RECENTLY RECONDITIONED
50 HZQUANTITY: 1
Learn More - K-6715 ESCHER WYSS BACK PRESSURE STEAM TURBINE YEAR 1964
K-6715 ESCHER WYSS BACK PRESSURE STEAM TURBINE YEAR 1964
MANUFACTURER: ESCHER WYSS
TYPE: 135-200
POWER ELECTRICAL: 3.0 MW
PRESSURE/TEMP.: 60 BAR/400°C
BACK PRESSURE: 11 BAR
YEAR OF MANUFACTURER: 1964
CONDITION: GOOD
VOLTAGE: 11 KV/50 HZ
SCOPE OF SUPPLY:
TURBINE AND GENERATOR,PIPING AND ELECTR. BOXESQUANTITY: 1
Learn More - K-2584 STANDARDKESSEL STEAM HEAT RECOVERY BOILER 25 T/H YEAR 1999
K-2584 STANDARDKESSEL STEAM HEAT RECOVERY BOILER 25 T/H YEAR 1999
YEAR 1999
25 T/H
25 BAR
GERMAN RATES UNDER 150ppm NOX AND CO
SIEMENS CONTROL
ECO: 19 TO
BOILER BORE: 3.50M
BOILER LENGTH: 6.70M
WEIGHT: 60
INSUALATION: 200mm V2A III D
TURBINE EXHAUST GASES AND NATURAL GAS WITH EXTRA BURNERQUANTITY: 1
Learn More - SEMICONDUCTOR AND SOLAR PANEL PRODUCTION EQUIPMENTREFERENCE NUMBER: T-6947 SEMICONDUCTOR AND SOLAR PANEL PRODUCTION EQUIPMENT IN ADDITION THERE ARE SOME MORE SEMICONDUCTOR AND SOLAR PANEL PRODUCTION EQUIPMENT AVAILABLE, SUCH AS: SINGULUS SINGULAR ICP-PECVD COATING SYSTEM FOR CRYSTALLINE SOLAR CELLS LEYBOLD H3200 INLINE SPUTTER FOR THIN FILM (CIS/CIGS) SOLAR MODULES LEYBOLD H1700 INLINE SPUTTER FOR THIN FILM (CIS/CIGS) SOLAR MODULES AMAT ATON 1600 SPUTTER DR. SCHENK SOLARINSPECT QUALITY MEASUREMENT SYSTEM INNOLAS IMPALA MULTIBEAM LASER STRUCTURIZER ENVIRON FALK 15 M3/H ULTRAPURE WATER PLANT MEIER VACUUMLAMINATOR ICOLAM 42/24 SYNRAD CO2 LASER MARKING SYSTEM MUEGGE MAGNETRON HEAD 3KW MH 3000 4 JET EDGE DECOATING SYSTEMS Learn More
- SOLAR PANEL PRODUCTION PLANT, 80 MW, YEAR 2008REFERENCE NUMBER: T-6946 SOLAR PANEL PRODUCTION PLANT, 80 MW, YEAR 2008 SOLAR PANEL PRODUCTION PLANT 80 MW OUTPUT CAPACITY PER YEAR THIN FILM SOLAR PANELS AMAT PECVD SYSTEM MODEL "NEW ARISTO" (VERTICAL SPUTTER WITH 14 CHAMBERS) INCLUDING ROBOT HANDLING, CONVEYORS, ATON 1600, ETC. STILL INSTALLED, USED QUANTITY: 1 Learn More
- MTU CONTAINERIZED DIESEL GENERATOR PLANT, 30.5 MW, YEAR 2017 AND 2018REFERENCE NUMBER: T-6933 MTU CONTAINERIZED DIESEL GENERATOR PLANT, 30.5 MW, YEAR 2017 AND 2018 MTU CONTAINERIZED DIESEL GENERATOR PLANT 30.5 MW FIFTEEN (15) MTU16V4000G63 EXHAUST EMISSION OPTIMIZED DIESEL ENGINES COUPLED TO HIGH PERFORMANCE MECC ALTE ECO46 2L/4A ALTERNATORS, RATED AT 2546 KVA/2033 KW STANDBY POWER AND 2303 KVA / 1842 KW PRIME POWER, 1500 RPM, 400 VOLT, 50 Hz, YEAR OF MANUFACTURE: 2017 AND 2018, ONLY 150 TO 200 HOURS SINCE NEW. EACH GENERATOR IS HOUSED IN A 40 FT SOUND ATTENUATED CONTAINER. SKID MOUNTED RADIATOR DESIGNED FOR HIGH END TEMPERATURES, 40 FT HI CUBE CONTAINER WITH SWITCH GEAR ROOM AND CONTROL ROOM, EQUIPMENT INCLUDES: CONTROL PANELS, CONTROL SYSTEM, BREAKER PANELS, HEATERS, BATTERY CHARGER, SWITCH GEAR, TRANSFORMERS, FUEL TANK SYSTEM AND ETC. COMPLETE POWER PLANT IN MODULE DESIGN THAT CAN BE EASILY TRANSPORTED AND SET UP WITHIN DAYS TO GENERATOR STEADY STREAM OF ELECTRICAL POWER. (15) ALL PURPOSE 40 FT SOUND ATTENUATED CONTAINERS WITH MTU16V4000G63 GENERATORS SETS. RATING: 2546 KVA/2033 KW STANDBY POWER AND 2303 KVA / 1842 KW PRIME POWER RADIATOR: SKID MOUNTED RADIATOR DESIGNED FOR HIGH END TEMPERATURES RADIATOR DESIGN: TECNO GROUP TG00094AA 30M/S REDUCED AIRFLOW RADIATOR WITH ELECTRIC POWERED COOLING FAN POWER BOX: CP6 MODEL: HMW‐2200‐T5 STD 2200KVA V400 / 50 Hz AS20 YEAR: 2017 AND 2018 HOURS: 150 TO 200 HOURS ONLY VOLTAGE: 400V, 3PH, 50 Hz ENGINE: MTU 16V4000G63 EXHAUST EMISSION OPTIMIZED ENGINE ENGINE SPEED: 1500 RPM STARTING SYSTEM: 24V ELECTRIC WITH OPTIMA YELLOW TOP BATTERIES AND BATTERY ISOLATOR ENGINE GOVERNOR: ADEC ALTERNATOR: MECC ALTE ECO46 2L/4A WITH MAUX EXCITATION, OIL PRIMER AND CENTRIFUGE FITTED AS CONFIRMED BY MTU, SET MOUNTED 4000A 4P MOTORIZED BREAKERS. CONTROL PANEL: AS5 WITH FREE ISSUE COMAP IG‐NTC‐BB + INTELIVISION 5 COMPONENTS AIR CIRCUIT BREAKER PANEL: 4 POLE: 4000A SCHNEIDER NW04 MOTORIZED H2 100KA BREAKING CAPACITY WITH MICROLOGIC 6.0A TRIP UNIT HEATER: THERMOSTATICALLY CONTROLLED 9KW 400V 3 PHASE WATER JACKET HEATER WITH CIRCULATION PUMP BATTERY CHARGER: DEEPSEA DSE9470 10A INTELLIGENT MAINS BATTERY CHARGER INCLUDING: AUTOMATIC ELECTRIC PRE‐LUBE PUMP; SET MOUNTED 2000A NEUTRAL EARTHLING CONTACTOR WITH CT; FUEL RETURN COOLER; CENTRIFUGAL OIL FILTER (MTU) & PRIMARY WATER SEPARATOR FILTER. INCLUDING: AUTOMATIC ELECTRIC PRE‐LUBE PUMP; SET MOUNTED 2000A NEUTRAL EARTHING CONTACTOR WITH CT; FUEL RETURN COOLER; CENTRIFUGAL OIL FILTER (MTU) & PRIMARY WATER SEPARATOR FILTER. TRANSFORMERS QUANTITY 4: 4MVA GBE OIL IMMERSED, FREE BREATHING STEP UP POWER TRANSFORMERS WITH OIL CONSERVATOR AND COPPER WINDINGS; 3 PHASE, 400‐33 KV; 50 Hz QUANTITY 1: 2MVA GBE OIL IMMERSED, FREE BREATHING STEP UP POWER TRANSFORMERS WITH OIL CONSERVATOR AND COPPER WINDINGS; 3 PHASE, 400‐33 KV; 50 Hz HV SWITCHGEAR CONTAINER PURPOSE BUILT 40 FT HI CUBE CONTAINER WITH HEATING LIGHTING AND POWER INSTALLED. LINED WITH ROCK WOOL INSULATED PANELS INCLUDES HIGH LEVEL LOUVER WITH FAN AND LOW‐LEVEL LOUVER FOR NATURAL AIR FLOW. SPLIT INTO TWO SECTIONS/ROOMS WITH A CONTROL ROOM ON ONE SIDE AND SWITCH GEAR IN THE OTHER ROOM WITH 33 KV ABB RING SAFE SWITCHGEAR CONTROL SYSTEM REMOTE COMMUNICATION AND LOAD SUMMATION CONTROL PANEL (RCLSP) 1 X COMAP IM‐NTC BB BASE BOX CONTROLLER (SITE LOAD VALUE MONITORING & INTEGRATION) 1 X COMAP IBNT INTERNET BRIDGE (BROADBAND INTERFACE) 1 X COMAP ILB+ LOCAL BRIDGE (LOCAL & PC REMOTE INTERFACE) 1 X 230/240V DC PSU 1 SET OF CONTROL MINIATURE CIRCUIT BREAKERS 1 SET OF CAN BUS INTERFACE TERMINALS BELDON 3106A CANBUS COMMUNICATION CABLING & CAT 5E ETHERNET COMMUNICATION CABLES COMAP MAINSPRO G59‐3 PROTECTION RELAY (OVER/UNDER VOLTS, Hz & VECTOR SHIFT) FUEL TANK SYSTEM QUANTITY 4 X 40,000L FUEL TANKS; DOUBLE SKINNED; DD50 FUEL POLISHING SYSTEM; BUND ALARM; OVERFILL ALARM AND CONTENTS GAUGE WITH ADJUSTABLE VOLT FREE LEVEL ALARM. QUANTITY 1 X 20,000L FUEL TANKS; DOUBLE SKINNED; DD50 FUEL POLISHING SYSTEM; BUND ALARM; OVERFILL ALARM AND CONTENTS GAUGE WITH ADJUSTABLE VOLT FREE LEVEL ALARM. Learn More
- K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983
K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983
COAL FIRED STEAM POWER PLANT 330 MW
PLANT FOR RELOCATION
EQUIPMENT AND AUXILIARIES IN EXCELLENT CONDITIONSUMMARY OF MAIN ADVANTAGES:
THE STEAM PLANT IS AVAILABLE NOW AND CAN BE REINSTALLED IN SHORT TIME
POWER AVAILABLE IN SHORT TIME
THE EQUIPMENT IS OFFERED AT ATTRACTIVE CONDITIONS
LOW INVESTMENT COST
THE MAIN EQUIPMENT IS BASED ON STATE OF THE ART DESIGN & EMISSION CONTROL
COMMERCIAL LIFE TIME FOR MANY YEARS TO COME
RELOCATION IN COOPERATION WITH OEM SUPERVISING AND GUARANTEES OVERALL CONCEPTTECHNICAL DATA OF BOILER:
OEM
STEAM OUTPUT DESIGN PRESSURE LIVE STEAM REHEAT TEMP FUEL980 T/H
203 BAR
184 BAR / GRAD CBROWN COAL, APPROXIMATELY 9,000 KJ/KG
HARD COAL POSSIBLE AS WELL (24,000 - 28,000 KJ/KG)CONSUMPTION APPROXIMATELY 280 T/H AT FULL LOAD WITH BROWN COAL
APPROXIMATELY 110 T/H AT FULL LOAD WITH HARD COALGRINDING MILLS: 6
EMISSION SO2 200 MG/NM3 X 200 MG/NM3 ASHES 50 MG/NM3 EXHAUST TEMP 70°C
TECHNICAL DATA STEAM TURBINE:
OEM
OUTPUT
LIVE STEAM: 330/345 MW, 177.5 BAR, 535°CGENERAL REMARKS:
PLANT HAS GONE IN COMMERCIAL OPERATION IN 1983
PLANT AND EQUIPMENT HAS BEEN IN OPERATION BASICALLY DURING THE WINTER PERIOD AND HAS 84,300 HOURS ACCUMULATED ONLY
ALL EQUIPMENT IS IN EXCELLENT CONDITION AND PROFESSIONALLY PRESERVEDENTIRE PLANT WITH ALL AUXILIARIES IS AVAILABLE FOR RELOCATION
SCOPE AND CONDITIONS:
DISASSEMBLED, PACKED, AND SHIPPED OR TURNKEY SOLUTION CAN BE NEGOTIATED
RELOCATION WILL BE INCOORDINATION WITH THE OEM WHO IS WILLING TO GIVE A CERTAIN LEVEL OF GUARANTEE FOR THE RELOCATED PLANTQUANTITY: 1
Learn More