Search results for: 'Power p'
- Related search terms
- Power pl
- Power plan
- Power pl'
- power gener
- Power pla'
-
CUMMINS DIESEL POWER PLANT, 50 MWREFERENCE NUMBER: T-6938 CUMMINS DIESEL POWER PLANT, 50 MW CUMMINS DIESEL POWER PLANT MODEL CUMMINS C2250 D5 ABB ALTERNATOR TANKS, CABINET, PERIPHERALS, ETC. STILL INSTALLED, USED QUANTITY: 1 Learn More -
K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983
COAL FIRED STEAM POWER PLANT 330 MW
PLANT FOR RELOCATION
EQUIPMENT AND AUXILIARIES IN EXCELLENT CONDITIONSUMMARY OF MAIN ADVANTAGES:
THE STEAM PLANT IS AVAILABLE NOW AND CAN BE REINSTALLED IN SHORT TIME
POWER AVAILABLE IN SHORT TIME
THE EQUIPMENT IS OFFERED AT ATTRACTIVE CONDITIONS
LOW INVESTMENT COST
THE MAIN EQUIPMENT IS BASED ON STATE OF THE ART DESIGN & EMISSION CONTROL
COMMERCIAL LIFE TIME FOR MANY YEARS TO COME
RELOCATION IN COOPERATION WITH OEM SUPERVISING AND GUARANTEES OVERALL CONCEPTTECHNICAL DATA OF BOILER:
OEM
STEAM OUTPUT DESIGN PRESSURE LIVE STEAM REHEAT TEMP FUEL980 T/H
203 BAR
184 BAR / GRAD CBROWN COAL, APPROXIMATELY 9,000 KJ/KG
HARD COAL POSSIBLE AS WELL (24,000 - 28,000 KJ/KG)CONSUMPTION APPROXIMATELY 280 T/H AT FULL LOAD WITH BROWN COAL
APPROXIMATELY 110 T/H AT FULL LOAD WITH HARD COALGRINDING MILLS: 6
EMISSION SO2 200 MG/NM3 X 200 MG/NM3 ASHES 50 MG/NM3 EXHAUST TEMP 70°C
TECHNICAL DATA STEAM TURBINE:
OEM
OUTPUT
LIVE STEAM: 330/345 MW, 177.5 BAR, 535°CGENERAL REMARKS:
PLANT HAS GONE IN COMMERCIAL OPERATION IN 1983
PLANT AND EQUIPMENT HAS BEEN IN OPERATION BASICALLY DURING THE WINTER PERIOD AND HAS 84,300 HOURS ACCUMULATED ONLY
ALL EQUIPMENT IS IN EXCELLENT CONDITION AND PROFESSIONALLY PRESERVEDENTIRE PLANT WITH ALL AUXILIARIES IS AVAILABLE FOR RELOCATION
SCOPE AND CONDITIONS:
DISASSEMBLED, PACKED, AND SHIPPED OR TURNKEY SOLUTION CAN BE NEGOTIATED
RELOCATION WILL BE INCOORDINATION WITH THE OEM WHO IS WILLING TO GIVE A CERTAIN LEVEL OF GUARANTEE FOR THE RELOCATED PLANTQUANTITY: 1
Learn More -
K-8156 SIEMENS SCHUCKERTWERKE AG COAL FIRED POWER PLANT 120 MW YEAR 1967K-8156 SIEMENS SCHUCKERTWERKE AG COAL FIRED POWER PLANT 120 MW YEAR 1967
COAL FIRED POWER PLANT, 120 MW
MANUFACTURER: SIEMENS - SCHUCKERTWERKE AG
TYPE: CONDENSING - EXTRACTION
FUEL: COAL
SPEED: 3000 U/MIN
POWER: MINIMUM: 125 MW
MAXIMUM: 140 MW
PRESSURE: 185 BAR
TEMPERATURE: 530°C
FREQUENCY: 48.5 - 51.5 HZ
YEAR: 1967
BOILER: BABCOCKSCOPE OF SUPPLY:
-REA AND DENOS (LOW NOx AND SULFUR), INCLUDING SCR-CATALYSATOR AND ELECTROFILTER
-TURBINE
0BOILER
-COAL CRASHER
-COAL BUNKER/STORAGE/TRANSPORTATION
-CONDENSER
-PUMPS AND PIPING
-WATERDEMIRALISTAION
-CHIMNEY
-COOLING SYSTEM AND COOLERS
-LUBRICATION OIL
-COMPRESSOR AIR
-FRESH AIR SYSTEM
-CRANAGE
-ENGINE AND PLANT PLC, MANUFACTURER SIEMENS
-HIGH VOLTAGE
-TRANSFORMER
-ELECTRICAL BOXES AND SWITCHESQUANTITY: 1
Learn More -
C-3990 HYUNDAI HIMSEN 9H25/33 HFO POWER PLANT, CAPACITY 10.5 MW, YEAR 2014 - NEWC-3990 HYUNDAI HIMSEN 9H25/33 HFO POWER PLANT, CAPACITY 10.5 MW, YEAR 2014 - NEW
MAKE/MODEL: HYUNDAI HIMSEN 9H25/33
HFO POWER PLANT
CAPACITY: 10.5 MW
WATTAGE: 46,200 KW
YEAR: 2014
HOURS: NEW
FUEL TYPE: HFO
FREQUENCY: 50 HZ
ENCLOSURE: SOUND ATTENUATED ENCLOSURE
MANUFACTURER: HHI
ENGINE MODEL: HYUNDAI HIMSEN 9H25/33
GENERATOR MODEL: HYUNDAI
FOR 50HZ: 2100KW, 6000V, 750 RPMQUANTITY: 5
Learn More -
K-8177 GAS TURBINES, COMBINED CYCLE POWER PLANTS, DIESEL & GAS ENGINESK-8177 GAS TURBINES, COMBINED CYCLE POWER PLANTS, DIESEL & GAS ENGINES
Learn More -
K-2539 SIEMENS COMPLETE POWER PLANT 180MW YEAR 2001K-2539 SIEMENS COMPLETE POWER PLANT 180MW YEAR 2001
MAKE: SIEMENS
2 UNITS V 64.3 SIEMENS GAS TURBINES AND STEAM TURBINE
2 BOILERS AND AUXILIARIES
NATURAL GAS AND LFO
50 HZQUANTITY: 1
Learn More -
K-2582 SIEMENS COAL AND BIOMASS POWER PLANT 2.5MW YEAR 2002K-2582 SIEMENS COAL AND BIOMASS POWER PLANT 2.5MW YEAR 2002
WAS BUILT TO SUPPLY THE PAPER MILL WITH STEAM AND ELECTRICITY
MAKE: SIEMENS
MODEL: CFR5 G6a
2.5MW
65 BAR
480 ˚ C
REVOLUTION NUMBER: 23000 U PER MINUTE
EVAPORATION PRESSURE: 1-10 BAR
YEAR 2002
THE STEAM TUBINE AND THE GENERATOR WERE CHANGES AND ARE NEW
HOURS: LESS THAN 30,000
BOILER SYSTEM WAS COMPLETELY RECONDITIONED
THE WATER TREATMENT PLANT WAS RECONDITIONED
EXHAUST CLEANING SYSTEM WAS RECONDITIONED
ASH AND COAL TRANSPORTATION SYSTEMS WERE RECONDITIONEDQUANTITY: 1
Learn More -
K-2577 BBC CONDENSING AND EXTRACTION STEAM TURBINE POWER PLANT 8.5MW YEAR 1975K-2577 BBC CONDENSING AND EXTRACTION STEAM TURBINE POWER PLANT 8.5MW YEAR 1975
8.5 MW
40 BAR
390 ˚ C
YEAR 1975QUANTITY: 1
Learn More -
K-2575 QINGDAO COAL FIRED POWER PLANT 18MW YEAR 2005K-2575 QINGDAO COAL FIRED POWER PLANT 18MW YEAR 2005
18 MW
49 BAR
470 ˚ C
YEAR 2005QUANTITY: 1
Learn More -
K-2573 IMGB COAL FIRED POWER PLANT 100MW YEAR 1990 TO 1995K-2573 IMGB COAL FIRED POWER PLANT 100MW YEAR 1990 TO 1995
100 MW- 2 UNITSA OF 50MW EACH
127 BAR
540 ˚ C
YEAR 1990/1995
GOOD CONDITIONQUANTITY: 1
Learn More