Search results for: 'man''
-
K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983
COAL FIRED STEAM POWER PLANT 330 MW
PLANT FOR RELOCATION
EQUIPMENT AND AUXILIARIES IN EXCELLENT CONDITIONSUMMARY OF MAIN ADVANTAGES:
THE STEAM PLANT IS AVAILABLE NOW AND CAN BE REINSTALLED IN SHORT TIME
POWER AVAILABLE IN SHORT TIME
THE EQUIPMENT IS OFFERED AT ATTRACTIVE CONDITIONS
LOW INVESTMENT COST
THE MAIN EQUIPMENT IS BASED ON STATE OF THE ART DESIGN & EMISSION CONTROL
COMMERCIAL LIFE TIME FOR MANY YEARS TO COME
RELOCATION IN COOPERATION WITH OEM SUPERVISING AND GUARANTEES OVERALL CONCEPTTECHNICAL DATA OF BOILER:
OEM
STEAM OUTPUT DESIGN PRESSURE LIVE STEAM REHEAT TEMP FUEL980 T/H
203 BAR
184 BAR / GRAD CBROWN COAL, APPROXIMATELY 9,000 KJ/KG
HARD COAL POSSIBLE AS WELL (24,000 - 28,000 KJ/KG)CONSUMPTION APPROXIMATELY 280 T/H AT FULL LOAD WITH BROWN COAL
APPROXIMATELY 110 T/H AT FULL LOAD WITH HARD COALGRINDING MILLS: 6
EMISSION SO2 200 MG/NM3 X 200 MG/NM3 ASHES 50 MG/NM3 EXHAUST TEMP 70°C
TECHNICAL DATA STEAM TURBINE:
OEM
OUTPUT
LIVE STEAM: 330/345 MW, 177.5 BAR, 535°CGENERAL REMARKS:
PLANT HAS GONE IN COMMERCIAL OPERATION IN 1983
PLANT AND EQUIPMENT HAS BEEN IN OPERATION BASICALLY DURING THE WINTER PERIOD AND HAS 84,300 HOURS ACCUMULATED ONLY
ALL EQUIPMENT IS IN EXCELLENT CONDITION AND PROFESSIONALLY PRESERVEDENTIRE PLANT WITH ALL AUXILIARIES IS AVAILABLE FOR RELOCATION
SCOPE AND CONDITIONS:
DISASSEMBLED, PACKED, AND SHIPPED OR TURNKEY SOLUTION CAN BE NEGOTIATED
RELOCATION WILL BE INCOORDINATION WITH THE OEM WHO IS WILLING TO GIVE A CERTAIN LEVEL OF GUARANTEE FOR THE RELOCATED PLANTQUANTITY: 1
Learn More -
K-8156 SIEMENS SCHUCKERTWERKE AG COAL FIRED POWER PLANT 120 MW YEAR 1967K-8156 SIEMENS SCHUCKERTWERKE AG COAL FIRED POWER PLANT 120 MW YEAR 1967
COAL FIRED POWER PLANT, 120 MW
MANUFACTURER: SIEMENS - SCHUCKERTWERKE AG
TYPE: CONDENSING - EXTRACTION
FUEL: COAL
SPEED: 3000 U/MIN
POWER: MINIMUM: 125 MW
MAXIMUM: 140 MW
PRESSURE: 185 BAR
TEMPERATURE: 530°C
FREQUENCY: 48.5 - 51.5 HZ
YEAR: 1967
BOILER: BABCOCKSCOPE OF SUPPLY:
-REA AND DENOS (LOW NOx AND SULFUR), INCLUDING SCR-CATALYSATOR AND ELECTROFILTER
-TURBINE
0BOILER
-COAL CRASHER
-COAL BUNKER/STORAGE/TRANSPORTATION
-CONDENSER
-PUMPS AND PIPING
-WATERDEMIRALISTAION
-CHIMNEY
-COOLING SYSTEM AND COOLERS
-LUBRICATION OIL
-COMPRESSOR AIR
-FRESH AIR SYSTEM
-CRANAGE
-ENGINE AND PLANT PLC, MANUFACTURER SIEMENS
-HIGH VOLTAGE
-TRANSFORMER
-ELECTRICAL BOXES AND SWITCHESQUANTITY: 1
Learn More -
K-2563 JENBACHER GAS ENGINES 1.64MW YEAR 1995K-2563 JENBACHER GAS ENGINES 1.64MW YEAR 1995
TYPE: JENBACHER JMS 616GS-NLC
FUEL: NATURAL GAS
1.64MW PLUS 2MW THERM. EACH
3 TRANFORMERS
3 HEAT EXCHANGERS
ELECTRIC
50 HZ
CONDITION: BETWEEN 45000 - 50000 RUNNING HOURS
FREQUENCY/COS PHI: 50 HZ / 0.8
ALTERNATOR VOLTAGE: 6.3
WITH ALL FULL
SERVICE REPORTS FROM THE MANUFACTURER
EXCELLENT CONDITIONQUANTITY: 3
Learn More -
M-5321 JENBACHER NATURAL GAS POWERPLANT 21.6 MW YEAR 1998REFERENCE NUMBER: M-5321 (22011DGFAB1RXL) L JENBACHER NATURAL GAS POWERPLANT 21.6 MW YEAR 1998 COMPLETE JENBACHER NATURAL GAS POWERPLANT OF 21.6 MW YEAR OF MANUFACTURE END OF 1998 COMMISSIONING: 5 UNITS IN 2000, 1 UNIT IN 2009, 1 UNIT IN 2010, AND 1 UNIT IN 2011 8 UNITS JENBACHER JMS 620 G OF 2.7 MWE-TOTAL EFFECTIVE ELECTRIC OUTPUT 21.7 MW RUNNING HOURS: 5 UNITS BETWEEN 38,000 AND 40,000 HOURS, 2 UNITS 6,200 HOURS AND 1 UNIT 7,200 HOURS JENBACHER MAINTENANCE FULL MAINTENANCE HISTORY QUANTITY AVAILABLE: 1 Learn More -
M-5238 HFO POWER PLANTS (6MW EACH, TOTAL 24MW) YEAR 2008 – NEW (NEVER USED)REFERENCE NUMBER: M-5238 (1313AJWNXX12U) L HFO POWER PLANTS (6MW EACH, TOTAL 24MW) YEAR 2008 – NEW (NEVER USED) HFO POWER PLANTS 6MW EACH TOTALLING 24MW YEAR 2008 WITH 50HZ NEW (NEVER USED) QUANTITY AVAILABLE: 4 Learn More