- K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006
K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006
COAL FIRED STEAM TURBINE POWER PLANT
300MW
COAL OIL GAS
BIOMASS FIRED
OUTPUT: 600 MW
180 BAR
540°C
MANUFCATURER/TYPE: BBC-ABB
YEAR: 2006
ONLY 13,300 AND 45,000 RUNNING HOURS AFTER MAJOR OVERHAULALTERNATOR ACEC TC 1498
COOLING: HYDROGEN 22 KV 3000 TR 1550 KVA
MAIN TRAFO: WESTINGHOUSE 375 MVA 156/22 KV
COUPLE TRAFO: ALSTHOM 20 MVA 22/6.4 KV
START TRAFO: ALSTHOM 20 MVA 71.5/6.4 KVFUELPUMPS: ID:3 / HD:3 LD:2881/HD:2223
16 BURNERS TANGENIALGASBURNERS: TANGENIAL 16 PCS 5000 NM3
COAL GRINDING MILLS:
(4) LOESCHE LM 19.20D
25 T/HR(2) LOESCHE LM 20.20D
35 T/HRBIOMASS POWER GENERATION BY CFB (CIRCULATING FLUIDIZED BED) BOILER 20 MWe FIRED BY WOOD DERIVED WASTES CUT INTO CHIPS. COMPLETE SAWDUST INSTALLATION.
UNIT 1
172,000 HOURS, OVERHAULED IN 2006
NEW ROTOR (HD, MD, LD)
ONLY 13,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN APRIL 2011 ONLY 408 HOURS UNTIL NOW!UNIT 2
265,000 HOURS, OVERHAULED IN 2006 (HD, MD, LD)
45,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN NOVEMBER 2011 ONLY 13,300 HOURS UNTIL NOW!
189 KG/CM2, 540˚C, 3000 T/MINPLANT ORIGINALLY FROM THW 1970’S BUT RENEWED IN 2006
STILL INSTALLED
IMMEDIATE DISMANTLING POSSIBLE
BOILER INTAKE CAPACITY: 3500 T/H
NEW PLCQUANTITY: 2
Learn More - K-6715 ESCHER WYSS BACK PRESSURE STEAM TURBINE YEAR 1964
K-6715 ESCHER WYSS BACK PRESSURE STEAM TURBINE YEAR 1964
MANUFACTURER: ESCHER WYSS
TYPE: 135-200
POWER ELECTRICAL: 3.0 MW
PRESSURE/TEMP.: 60 BAR/400°C
BACK PRESSURE: 11 BAR
YEAR OF MANUFACTURER: 1964
CONDITION: GOOD
VOLTAGE: 11 KV/50 HZ
SCOPE OF SUPPLY:
TURBINE AND GENERATOR,PIPING AND ELECTR. BOXESQUANTITY: 1
Learn More - K-2582 SIEMENS COAL AND BIOMASS POWER PLANT 2.5MW YEAR 2002
K-2582 SIEMENS COAL AND BIOMASS POWER PLANT 2.5MW YEAR 2002
WAS BUILT TO SUPPLY THE PAPER MILL WITH STEAM AND ELECTRICITY
MAKE: SIEMENS
MODEL: CFR5 G6a
2.5MW
65 BAR
480 ˚ C
REVOLUTION NUMBER: 23000 U PER MINUTE
EVAPORATION PRESSURE: 1-10 BAR
YEAR 2002
THE STEAM TUBINE AND THE GENERATOR WERE CHANGES AND ARE NEW
HOURS: LESS THAN 30,000
BOILER SYSTEM WAS COMPLETELY RECONDITIONED
THE WATER TREATMENT PLANT WAS RECONDITIONED
EXHAUST CLEANING SYSTEM WAS RECONDITIONED
ASH AND COAL TRANSPORTATION SYSTEMS WERE RECONDITIONEDQUANTITY: 1
Learn More - K-2555 HFO FUEL COMPLETE POWER PLANT 5.25MW YEAR 1988- 750 RPM
K-2555 HFO FUEL COMPLETE POWER PLANT 5.25MW YEAR 1988- 750 RPM
MITSUBISHI 18KU30 DIESEL ENGINE GENERATORS
5.25MW
11KV
3 PHASE
750 RPM
YEAR 1988
50 HZQUANTITY: 2
Learn More - C-3990 HYUNDAI HIMSEN 9H25/33 HFO POWER PLANT, CAPACITY 10.5 MW, YEAR 2014 - NEW
C-3990 HYUNDAI HIMSEN 9H25/33 HFO POWER PLANT, CAPACITY 10.5 MW, YEAR 2014 - NEW
MAKE/MODEL: HYUNDAI HIMSEN 9H25/33
HFO POWER PLANT
CAPACITY: 10.5 MW
WATTAGE: 46,200 KW
YEAR: 2014
HOURS: NEW
FUEL TYPE: HFO
FREQUENCY: 50 HZ
ENCLOSURE: SOUND ATTENUATED ENCLOSURE
MANUFACTURER: HHI
ENGINE MODEL: HYUNDAI HIMSEN 9H25/33
GENERATOR MODEL: HYUNDAI
FOR 50HZ: 2100KW, 6000V, 750 RPMQUANTITY: 5
Learn More - DUAL FUEL 40MW POWER PLANT WITH SULZER 16 ZAV 40S UNITSDUAL FUEL 40MW WITH 4 X SULZER 16 ZAV 40S UNITS DELIVERED IN YEAR 1991 AND TOTALL REFURBISHED (CONVERTED TO DUAL FUEL IN 2011) TOTAL OPERATING HOURS APPROXIMATELY 30,000 / ENGINES AND APPROXIMATELY 400 AFTER REFURBISHMENT GENERATOR DRIVERS 4 X SULZER 16 CYLINDER / 500 RPM DUAL FUEL ENGINES TYPE 16ZAV40S COMPLETE PLANT, ELECTRICAL OUTPUT 42.2 MW 11 KV / 50 HZ FROM ALTERNATORS THE ENGINES HAVE COOLING TOWER COOLING SYSTEM AND COMPLETE SET OF AXILLARIES EQUIPMENT IS STILL INSTALLED AND IN A GOOD CONDITION Learn More
- DIESEL POWER PLANT 81.3MW WARTSILA 18V46 HFODELIVERED IN YEAR 2001 AND OPERATED UNDER WARTSILA O&M TILL END OF 2012 TOTAL OPERATING HOURS APPROXIMATELY 40,000 / ENGINES AND ALL IN GOOD CONDITION GENERATOR DRIVER 5 X WARTSILA 18 CYLINDER / 500 RPM HFO ENGINES TYPE 18V46 COMPLETE PLANT, ELECTRICAL OUTPUT 81.3MW 11KV / 50HZ FROM ALTERNATORS THE ENGINES HAVE COOLING TOWER COOLING SYSTEM AND COMPLETE SET OF AXILLARIES EQUIPMENT IS STILL INSTALLED AND IN A GOOD CONDITION Learn More