K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006

K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006

COAL FIRED STEAM TURBINE POWER PLANT
300MW
COAL OIL GAS
BIOMASS FIRED
OUTPUT: 600 MW
180 BAR
540°C
MANUFCATURER/TYPE: BBC-ABB
YEAR: 2006
ONLY 13,300 AND 45,000 RUNNING HOURS AFTER MAJOR OVERHAUL

ALTERNATOR ACEC TC 1498
COOLING: HYDROGEN 22 KV 3000 TR 1550 KVA
MAIN TRAFO: WESTINGHOUSE 375 MVA 156/22 KV
COUPLE TRAFO: ALSTHOM 20 MVA 22/6.4 KV
START TRAFO: ALSTHOM 20 MVA 71.5/6.4 KV

FUELPUMPS: ID:3 / HD:3 LD:2881/HD:2223
16 BURNERS TANGENIAL

GASBURNERS: TANGENIAL 16 PCS 5000 NM3

COAL GRINDING MILLS:
(4) LOESCHE LM 19.20D
25 T/HR

(2) LOESCHE LM 20.20D
35 T/HR

BIOMASS POWER GENERATION BY CFB (CIRCULATING FLUIDIZED BED) BOILER 20 MWe FIRED BY WOOD DERIVED WASTES CUT INTO CHIPS. COMPLETE SAWDUST INSTALLATION.

 

UNIT 1
172,000 HOURS, OVERHAULED IN 2006
NEW ROTOR (HD, MD, LD)
ONLY 13,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN APRIL 2011 ONLY 408 HOURS UNTIL NOW!

UNIT 2
265,000 HOURS, OVERHAULED IN 2006 (HD, MD, LD)
45,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN NOVEMBER 2011 ONLY 13,300 HOURS UNTIL NOW!
189 KG/CM2, 540˚C, 3000 T/MIN

PLANT ORIGINALLY FROM THW 1970’S BUT RENEWED IN 2006
STILL INSTALLED
IMMEDIATE DISMANTLING POSSIBLE
BOILER INTAKE CAPACITY: 3500 T/H
NEW PLC

QUANTITY: 2

In stock
SKU
K-8046
Call Image
Call: +1 (864) 574-0404

We will send this product in 2 days. Read more...

Call us now for more info about our products.

Return purchased items and get all your money back.

Buy this product and earn 10 special loyalty points!


REFERENCE NUMBER: K-8046
BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006

COAL FIRED STEAM TURBINE POWER PLANT
300MW
COAL OIL GAS
BIOMASS FIRED
OUTPUT: 600 MW
180 BAR
540°C
MANUFCATURER/TYPE: BBC-ABB
YEAR: 2006
ONLY 13,300 AND 45,000 RUNNING HOURS AFTER MAJOR OVERHAUL

ALTERNATOR ACEC TC 1498
COOLING: HYDROGEN 22 KV 3000 TR 1550 KVA
MAIN TRAFO: WESTINGHOUSE 375 MVA 156/22 KV
COUPLE TRAFO: ALSTHOM 20 MVA 22/6.4 KV
START TRAFO: ALSTHOM 20 MVA 71.5/6.4 KV

FUELPUMPS: ID:3 / HD:3 LD:2881/HD:2223
16 BURNERS TANGENIAL

GASBURNERS: TANGENIAL 16 PCS 5000 NM3

COAL GRINDING MILLS:
(4) LOESCHE LM 19.20D
25 T/HR

(2) LOESCHE LM 20.20D
35 T/HR

BIOMASS POWER GENERATION BY CFB (CIRCULATING FLUIDIZED BED) BOILER 20 MWe FIRED BY WOOD DERIVED WASTES CUT INTO CHIPS. COMPLETE SAWDUST INSTALLATION.

 

UNIT 1
172,000 HOURS, OVERHAULED IN 2006
NEW ROTOR (HD, MD, LD)
ONLY 13,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN APRIL 2011 ONLY 408 HOURS UNTIL NOW!

UNIT 2
265,000 HOURS, OVERHAULED IN 2006 (HD, MD, LD)
45,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN NOVEMBER 2011 ONLY 13,300 HOURS UNTIL NOW!
189 KG/CM2, 540˚C, 3000 T/MIN

PLANT ORIGINALLY FROM THW 1970’S BUT RENEWED IN 2006
STILL INSTALLED
IMMEDIATE DISMANTLING POSSIBLE
BOILER INTAKE CAPACITY: 3500 T/H
NEW PLC

QUANTITY: 2

Write Your Own Review
You're reviewing:K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006