Search results for: 'g'"'
- K-2544 COMPLETE POWER PLANT 46MW YEAR 2000
K-2544 COMPLETE POWER PLANT 46MW YEAR 2000
SIEMENS TYPHOON AND ALSTOM
5 GAS TURBINE PACKAGES
1 STEAM TURBINE
BOILER AND AUXILIARIES
NATURAL GAS AND NAPHTA
46 MW
YEAR 2000-LOW HOURS
50 HZQUANTITY: 1
Learn More - SEMICONDUCTOR AND SOLAR PANEL PRODUCTION EQUIPMENTREFERENCE NUMBER: T-6947 SEMICONDUCTOR AND SOLAR PANEL PRODUCTION EQUIPMENT IN ADDITION THERE ARE SOME MORE SEMICONDUCTOR AND SOLAR PANEL PRODUCTION EQUIPMENT AVAILABLE, SUCH AS: SINGULUS SINGULAR ICP-PECVD COATING SYSTEM FOR CRYSTALLINE SOLAR CELLS LEYBOLD H3200 INLINE SPUTTER FOR THIN FILM (CIS/CIGS) SOLAR MODULES LEYBOLD H1700 INLINE SPUTTER FOR THIN FILM (CIS/CIGS) SOLAR MODULES AMAT ATON 1600 SPUTTER DR. SCHENK SOLARINSPECT QUALITY MEASUREMENT SYSTEM INNOLAS IMPALA MULTIBEAM LASER STRUCTURIZER ENVIRON FALK 15 M3/H ULTRAPURE WATER PLANT MEIER VACUUMLAMINATOR ICOLAM 42/24 SYNRAD CO2 LASER MARKING SYSTEM MUEGGE MAGNETRON HEAD 3KW MH 3000 4 JET EDGE DECOATING SYSTEMS Learn More
- SOLAR PANEL PRODUCTION PLANT, 80 MW, YEAR 2008REFERENCE NUMBER: T-6946 SOLAR PANEL PRODUCTION PLANT, 80 MW, YEAR 2008 SOLAR PANEL PRODUCTION PLANT 80 MW OUTPUT CAPACITY PER YEAR THIN FILM SOLAR PANELS AMAT PECVD SYSTEM MODEL "NEW ARISTO" (VERTICAL SPUTTER WITH 14 CHAMBERS) INCLUDING ROBOT HANDLING, CONVEYORS, ATON 1600, ETC. STILL INSTALLED, USED QUANTITY: 1 Learn More
- CUMMINS DIESEL POWER PLANT, 50 MWREFERENCE NUMBER: T-6938 CUMMINS DIESEL POWER PLANT, 50 MW CUMMINS DIESEL POWER PLANT MODEL CUMMINS C2250 D5 ABB ALTERNATOR TANKS, CABINET, PERIPHERALS, ETC. STILL INSTALLED, USED QUANTITY: 1 Learn More
- C-2580 SIEMENS COAL FIRED PLANTS, YEAR 1967 TO 1971
C-2580 SIEMENS COAL FIRED PLANTS, YEAR 1967 TO 1971
ITEM 001
SIEMENS
OUTPUT (MW): 160
PRES./FLOW/TEMP: 193 BAR/530°
COAL FIRED POWER PLANT
YEAR: 1971
VERY GOOD CONDITIONQUANTITY: 1
ITEM 002
SIEMENS
OUTPUT (MW): 142
PRES./FLOW/TEMP: 193 BAR/530°
COAL FIRED POWER PLANT
YEAR: 1970
GOOD CONDITIONQUANTITY: 1
ITEM 003
SIEMENS
OUTPUT (MW): 120
PRES./FLOW/TEMP: 185 BAR/530°C
COAL FIRED POWER PLANT
YEAR: 1967
GOOD CONDITIONQUANTITY: 1
Learn More - C-2578 WAUKESHA 16 V 150 LTD MACHINE, YEAR 2008, WITH 13,766 RUNNING HOURS
C-2578 WAUKESHA 16 V 150 LTD MACHINE, YEAR 2008, WITH 13,766 RUNNING HOURS
WAUKESHA MACHINE
MODEL: 16 V 150 LTD
OUTPUT (MW): 1.32
FUEL: GAS ENGINE
50 HZ
BIOGAS/LANDFILL GAS
YEAR: 2008
RUNNING HOURS: 13,766QUANTITY: 1
Learn More - K-8185 GE JENBACHER TYPE JMS 620 GS YEAR 2000
K-8185 GE JENBACHER TYPE JMS 620 GS YEAR 2000
MANUFACTURER: GE JENBACHER
TYPE: JMS 620 GS E OS
WITH STAMFORD LVSI 814 HS
400V
50HZ
COS 0.8
YEAR: 2000
NATURAL GAS: 3.041KW EL
HOURS SINCE NEW: 41,000 INCLUDE THE LAST OVERHAUL AT 32,000 HOURS NEW LINERS AND PISTONS AND NEW DIANE CONTROL SYSTEM
INCLUDING:
ENGINE
GENERATOR
ELECTRONIC BOXES
DOCUMENTATION
CABEL
PLC
PIPINGQUANTITY: 1 UNIT
Learn More - K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983
K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983
COAL FIRED STEAM POWER PLANT 330 MW
PLANT FOR RELOCATION
EQUIPMENT AND AUXILIARIES IN EXCELLENT CONDITIONSUMMARY OF MAIN ADVANTAGES:
THE STEAM PLANT IS AVAILABLE NOW AND CAN BE REINSTALLED IN SHORT TIME
POWER AVAILABLE IN SHORT TIME
THE EQUIPMENT IS OFFERED AT ATTRACTIVE CONDITIONS
LOW INVESTMENT COST
THE MAIN EQUIPMENT IS BASED ON STATE OF THE ART DESIGN & EMISSION CONTROL
COMMERCIAL LIFE TIME FOR MANY YEARS TO COME
RELOCATION IN COOPERATION WITH OEM SUPERVISING AND GUARANTEES OVERALL CONCEPTTECHNICAL DATA OF BOILER:
OEM
STEAM OUTPUT DESIGN PRESSURE LIVE STEAM REHEAT TEMP FUEL980 T/H
203 BAR
184 BAR / GRAD CBROWN COAL, APPROXIMATELY 9,000 KJ/KG
HARD COAL POSSIBLE AS WELL (24,000 - 28,000 KJ/KG)CONSUMPTION APPROXIMATELY 280 T/H AT FULL LOAD WITH BROWN COAL
APPROXIMATELY 110 T/H AT FULL LOAD WITH HARD COALGRINDING MILLS: 6
EMISSION SO2 200 MG/NM3 X 200 MG/NM3 ASHES 50 MG/NM3 EXHAUST TEMP 70°C
TECHNICAL DATA STEAM TURBINE:
OEM
OUTPUT
LIVE STEAM: 330/345 MW, 177.5 BAR, 535°CGENERAL REMARKS:
PLANT HAS GONE IN COMMERCIAL OPERATION IN 1983
PLANT AND EQUIPMENT HAS BEEN IN OPERATION BASICALLY DURING THE WINTER PERIOD AND HAS 84,300 HOURS ACCUMULATED ONLY
ALL EQUIPMENT IS IN EXCELLENT CONDITION AND PROFESSIONALLY PRESERVEDENTIRE PLANT WITH ALL AUXILIARIES IS AVAILABLE FOR RELOCATION
SCOPE AND CONDITIONS:
DISASSEMBLED, PACKED, AND SHIPPED OR TURNKEY SOLUTION CAN BE NEGOTIATED
RELOCATION WILL BE INCOORDINATION WITH THE OEM WHO IS WILLING TO GIVE A CERTAIN LEVEL OF GUARANTEE FOR THE RELOCATED PLANTQUANTITY: 1
Learn More - K-6715 ESCHER WYSS BACK PRESSURE STEAM TURBINE YEAR 1964
K-6715 ESCHER WYSS BACK PRESSURE STEAM TURBINE YEAR 1964
MANUFACTURER: ESCHER WYSS
TYPE: 135-200
POWER ELECTRICAL: 3.0 MW
PRESSURE/TEMP.: 60 BAR/400°C
BACK PRESSURE: 11 BAR
YEAR OF MANUFACTURER: 1964
CONDITION: GOOD
VOLTAGE: 11 KV/50 HZ
SCOPE OF SUPPLY:
TURBINE AND GENERATOR,PIPING AND ELECTR. BOXESQUANTITY: 1
Learn More - K-3429 FOSTER AND WHEELER STEAM BOILERS A 100 T/ H AND 46.4 BAR YEAR 2005
K-3429 FOSTER AND WHEELER STEAM BOILERS A 100 T/ H AND 46.4 BAR YEAR 2005
MAKE: FOSTER AND WHEELER
YEAR 2005
2 X 100 TONS/H, 39 BAR WORKING PRESSURE AT 385C. DESIGNED PRESSURE IS 46.5 BAR
EMPTY WEIGHT 97 TONS
FURNACE VOLUME 104M3
HEATING FURNACE AREA 1125M2
ALL ACCESORIES INCLUDED
87% EFFICIENCY, FUEL OIL AND NATURAL GAS FIREDQUANTITY: 2
Learn More