Search results for: 'a-2'
- Related search terms
- a-2500
- a-2502
- A-250
- A-2489
- a-2)','.)).)(
- K-3429 FOSTER AND WHEELER STEAM BOILERS A 100 T/ H AND 46.4 BAR YEAR 2005
K-3429 FOSTER AND WHEELER STEAM BOILERS A 100 T/ H AND 46.4 BAR YEAR 2005
MAKE: FOSTER AND WHEELER
YEAR 2005
2 X 100 TONS/H, 39 BAR WORKING PRESSURE AT 385C. DESIGNED PRESSURE IS 46.5 BAR
EMPTY WEIGHT 97 TONS
FURNACE VOLUME 104M3
HEATING FURNACE AREA 1125M2
ALL ACCESORIES INCLUDED
87% EFFICIENCY, FUEL OIL AND NATURAL GAS FIREDQUANTITY: 2
Learn More - R-9392 ROLLS-ROYCE/ABB DIESEL GENERATORS – NEW, 27.7 MW, FUEL MDO (MARINE DIESEL OIL), YEAR 2015 – 60Hz
REFERENCE NUMBER: R-9392
ROLLS-ROYCE/ABB DIESEL GENERATORS – NEW, 27.7 MW, FUEL MDO (MARINE DIESEL OIL), YEAR 2015 – 60Hz
(5587 KW X 2 + 4190 KW X 4 = 27.934 KW ROLLS-ROYCE)
Learn More - K-2582 SIEMENS COAL AND BIOMASS POWER PLANT 2.5MW YEAR 2002
K-2582 SIEMENS COAL AND BIOMASS POWER PLANT 2.5MW YEAR 2002
WAS BUILT TO SUPPLY THE PAPER MILL WITH STEAM AND ELECTRICITY
MAKE: SIEMENS
MODEL: CFR5 G6a
2.5MW
65 BAR
480 ˚ C
REVOLUTION NUMBER: 23000 U PER MINUTE
EVAPORATION PRESSURE: 1-10 BAR
YEAR 2002
THE STEAM TUBINE AND THE GENERATOR WERE CHANGES AND ARE NEW
HOURS: LESS THAN 30,000
BOILER SYSTEM WAS COMPLETELY RECONDITIONED
THE WATER TREATMENT PLANT WAS RECONDITIONED
EXHAUST CLEANING SYSTEM WAS RECONDITIONED
ASH AND COAL TRANSPORTATION SYSTEMS WERE RECONDITIONEDQUANTITY: 1
Learn More - ALSTOM GAS POWER PLANT, 252 MWREFERENCE NUMBER: T-6937 ALSTOM GAS POWER PLANT, 252 MW ALSTOM GAS POWER PLANT 252 MW WITH SIEMENS TECHNOLOGY STILL INSTALLED, USED ONLY TEST AND MAINTENANCE OPERATION 500 HOURS QUANTITY: 1 Learn More
- MTU CONTAINERIZED DIESEL GENERATOR PLANT, 30.5 MW, YEAR 2017 AND 2018REFERENCE NUMBER: T-6933 MTU CONTAINERIZED DIESEL GENERATOR PLANT, 30.5 MW, YEAR 2017 AND 2018 MTU CONTAINERIZED DIESEL GENERATOR PLANT 30.5 MW FIFTEEN (15) MTU16V4000G63 EXHAUST EMISSION OPTIMIZED DIESEL ENGINES COUPLED TO HIGH PERFORMANCE MECC ALTE ECO46 2L/4A ALTERNATORS, RATED AT 2546 KVA/2033 KW STANDBY POWER AND 2303 KVA / 1842 KW PRIME POWER, 1500 RPM, 400 VOLT, 50 Hz, YEAR OF MANUFACTURE: 2017 AND 2018, ONLY 150 TO 200 HOURS SINCE NEW. EACH GENERATOR IS HOUSED IN A 40 FT SOUND ATTENUATED CONTAINER. SKID MOUNTED RADIATOR DESIGNED FOR HIGH END TEMPERATURES, 40 FT HI CUBE CONTAINER WITH SWITCH GEAR ROOM AND CONTROL ROOM, EQUIPMENT INCLUDES: CONTROL PANELS, CONTROL SYSTEM, BREAKER PANELS, HEATERS, BATTERY CHARGER, SWITCH GEAR, TRANSFORMERS, FUEL TANK SYSTEM AND ETC. COMPLETE POWER PLANT IN MODULE DESIGN THAT CAN BE EASILY TRANSPORTED AND SET UP WITHIN DAYS TO GENERATOR STEADY STREAM OF ELECTRICAL POWER. (15) ALL PURPOSE 40 FT SOUND ATTENUATED CONTAINERS WITH MTU16V4000G63 GENERATORS SETS. RATING: 2546 KVA/2033 KW STANDBY POWER AND 2303 KVA / 1842 KW PRIME POWER RADIATOR: SKID MOUNTED RADIATOR DESIGNED FOR HIGH END TEMPERATURES RADIATOR DESIGN: TECNO GROUP TG00094AA 30M/S REDUCED AIRFLOW RADIATOR WITH ELECTRIC POWERED COOLING FAN POWER BOX: CP6 MODEL: HMW‐2200‐T5 STD 2200KVA V400 / 50 Hz AS20 YEAR: 2017 AND 2018 HOURS: 150 TO 200 HOURS ONLY VOLTAGE: 400V, 3PH, 50 Hz ENGINE: MTU 16V4000G63 EXHAUST EMISSION OPTIMIZED ENGINE ENGINE SPEED: 1500 RPM STARTING SYSTEM: 24V ELECTRIC WITH OPTIMA YELLOW TOP BATTERIES AND BATTERY ISOLATOR ENGINE GOVERNOR: ADEC ALTERNATOR: MECC ALTE ECO46 2L/4A WITH MAUX EXCITATION, OIL PRIMER AND CENTRIFUGE FITTED AS CONFIRMED BY MTU, SET MOUNTED 4000A 4P MOTORIZED BREAKERS. CONTROL PANEL: AS5 WITH FREE ISSUE COMAP IG‐NTC‐BB + INTELIVISION 5 COMPONENTS AIR CIRCUIT BREAKER PANEL: 4 POLE: 4000A SCHNEIDER NW04 MOTORIZED H2 100KA BREAKING CAPACITY WITH MICROLOGIC 6.0A TRIP UNIT HEATER: THERMOSTATICALLY CONTROLLED 9KW 400V 3 PHASE WATER JACKET HEATER WITH CIRCULATION PUMP BATTERY CHARGER: DEEPSEA DSE9470 10A INTELLIGENT MAINS BATTERY CHARGER INCLUDING: AUTOMATIC ELECTRIC PRE‐LUBE PUMP; SET MOUNTED 2000A NEUTRAL EARTHLING CONTACTOR WITH CT; FUEL RETURN COOLER; CENTRIFUGAL OIL FILTER (MTU) & PRIMARY WATER SEPARATOR FILTER. INCLUDING: AUTOMATIC ELECTRIC PRE‐LUBE PUMP; SET MOUNTED 2000A NEUTRAL EARTHING CONTACTOR WITH CT; FUEL RETURN COOLER; CENTRIFUGAL OIL FILTER (MTU) & PRIMARY WATER SEPARATOR FILTER. TRANSFORMERS QUANTITY 4: 4MVA GBE OIL IMMERSED, FREE BREATHING STEP UP POWER TRANSFORMERS WITH OIL CONSERVATOR AND COPPER WINDINGS; 3 PHASE, 400‐33 KV; 50 Hz QUANTITY 1: 2MVA GBE OIL IMMERSED, FREE BREATHING STEP UP POWER TRANSFORMERS WITH OIL CONSERVATOR AND COPPER WINDINGS; 3 PHASE, 400‐33 KV; 50 Hz HV SWITCHGEAR CONTAINER PURPOSE BUILT 40 FT HI CUBE CONTAINER WITH HEATING LIGHTING AND POWER INSTALLED. LINED WITH ROCK WOOL INSULATED PANELS INCLUDES HIGH LEVEL LOUVER WITH FAN AND LOW‐LEVEL LOUVER FOR NATURAL AIR FLOW. SPLIT INTO TWO SECTIONS/ROOMS WITH A CONTROL ROOM ON ONE SIDE AND SWITCH GEAR IN THE OTHER ROOM WITH 33 KV ABB RING SAFE SWITCHGEAR CONTROL SYSTEM REMOTE COMMUNICATION AND LOAD SUMMATION CONTROL PANEL (RCLSP) 1 X COMAP IM‐NTC BB BASE BOX CONTROLLER (SITE LOAD VALUE MONITORING & INTEGRATION) 1 X COMAP IBNT INTERNET BRIDGE (BROADBAND INTERFACE) 1 X COMAP ILB+ LOCAL BRIDGE (LOCAL & PC REMOTE INTERFACE) 1 X 230/240V DC PSU 1 SET OF CONTROL MINIATURE CIRCUIT BREAKERS 1 SET OF CAN BUS INTERFACE TERMINALS BELDON 3106A CANBUS COMMUNICATION CABLING & CAT 5E ETHERNET COMMUNICATION CABLES COMAP MAINSPRO G59‐3 PROTECTION RELAY (OVER/UNDER VOLTS, Hz & VECTOR SHIFT) FUEL TANK SYSTEM QUANTITY 4 X 40,000L FUEL TANKS; DOUBLE SKINNED; DD50 FUEL POLISHING SYSTEM; BUND ALARM; OVERFILL ALARM AND CONTENTS GAUGE WITH ADJUSTABLE VOLT FREE LEVEL ALARM. QUANTITY 1 X 20,000L FUEL TANKS; DOUBLE SKINNED; DD50 FUEL POLISHING SYSTEM; BUND ALARM; OVERFILL ALARM AND CONTENTS GAUGE WITH ADJUSTABLE VOLT FREE LEVEL ALARM. Learn More
- K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006
K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006
COAL FIRED STEAM TURBINE POWER PLANT
300MW
COAL OIL GAS
BIOMASS FIRED
OUTPUT: 600 MW
180 BAR
540°C
MANUFCATURER/TYPE: BBC-ABB
YEAR: 2006
ONLY 13,300 AND 45,000 RUNNING HOURS AFTER MAJOR OVERHAULALTERNATOR ACEC TC 1498
COOLING: HYDROGEN 22 KV 3000 TR 1550 KVA
MAIN TRAFO: WESTINGHOUSE 375 MVA 156/22 KV
COUPLE TRAFO: ALSTHOM 20 MVA 22/6.4 KV
START TRAFO: ALSTHOM 20 MVA 71.5/6.4 KVFUELPUMPS: ID:3 / HD:3 LD:2881/HD:2223
16 BURNERS TANGENIALGASBURNERS: TANGENIAL 16 PCS 5000 NM3
COAL GRINDING MILLS:
(4) LOESCHE LM 19.20D
25 T/HR(2) LOESCHE LM 20.20D
35 T/HRBIOMASS POWER GENERATION BY CFB (CIRCULATING FLUIDIZED BED) BOILER 20 MWe FIRED BY WOOD DERIVED WASTES CUT INTO CHIPS. COMPLETE SAWDUST INSTALLATION.
UNIT 1
172,000 HOURS, OVERHAULED IN 2006
NEW ROTOR (HD, MD, LD)
ONLY 13,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN APRIL 2011 ONLY 408 HOURS UNTIL NOW!UNIT 2
265,000 HOURS, OVERHAULED IN 2006 (HD, MD, LD)
45,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN NOVEMBER 2011 ONLY 13,300 HOURS UNTIL NOW!
189 KG/CM2, 540˚C, 3000 T/MINPLANT ORIGINALLY FROM THW 1970’S BUT RENEWED IN 2006
STILL INSTALLED
IMMEDIATE DISMANTLING POSSIBLE
BOILER INTAKE CAPACITY: 3500 T/H
NEW PLCQUANTITY: 2
Learn More - K-2567 JENBACHER LANDFIL GAS AND NATURAL GAS ENGINE 0.527MW YEAR 2012 TO 2013
K-2567 JENBACHER LANDFIL GAS AND NATURAL GAS ENGINE 0.527MW YEAR 2012 TO 2013
0.527MW
YEAR 2012-2013- NEW, 2 YEARS WARRANTY
TYPE: JMS 312 GS-BL
50HZ
CHP MODULE
HEAT EXCHANGER
OIL TANK
DIANE XT PLC
LANDFILL GAS LINE
SPARESQUANTITY: 2
Learn More - K-2566 CATERPILLAR G3516 LANDFIL AND NATURAL GAS ENGINE 0.85MW YEAR 2008-NEW
K-2566 CATERPILLAR G3516 LANDFIL AND NATURAL GAS ENGINE 0.85MW YEAR 2008-NEW
0.85MW
NATURAL GAS FUEL
YEAR 2008- NEW
60 HZ
4160VQUANTITY: 10
Learn More - K-2541 SIEMENS WESTINGHOUSE AND MITSUBISHI COMBINED CYCLE PLANT 73MW YEAR 1999
K-2541 SIEMENS WESTINGHOUSE AND MITSUBISHI COMBINED CYCLE PLANT 73MW YEAR 1999
MAKE: SIEMENS WESTINGHOUSE AND MITSUBISHI
NATURAL GAS
73 MW
YEAR 1999
50 HZQUANTITY: 1
Learn More - K-2577 BBC CONDENSING AND EXTRACTION STEAM TURBINE POWER PLANT 8.5MW YEAR 1975
K-2577 BBC CONDENSING AND EXTRACTION STEAM TURBINE POWER PLANT 8.5MW YEAR 1975
8.5 MW
40 BAR
390 ˚ C
YEAR 1975QUANTITY: 1
Learn More