Search results for: 'switch'
- Related search terms
- switchgear
- switchge
- switch 520
- switch 1 provision
- P-5091 REBUILT PROBAT ROASTER 90 OR 120 KILOS
P-5091 REBUILT PROBAT ROASTER 90 OR 120 KILOS
AUTOMATIC PROBAT ROASTER - 90 KILO
COMPLETE WITH :
SUCTION GROUP TO FEED GREEN COFFEE TO THE ROASTER
HOPPER FOR COFFEE WITH AUTOMATIC DOWNLOAD
ROASTING DRUM WITH SCRAPERS TO MOVE GREEN COFFEE
AUTOMATIC SHUTTER WITH SAFETY POSITION AND LIMIT SWITCH
COOLING BASIN WITH ACCIDENT PREVENTIONS, SCRAPERS AND FUN FOR COOLING AIR
HOT CIRCUIT WITH GAS BURNER COMPLETE WITH FUN WITH PARTIAL RECYCLE OF HOT AIR AND UNLOADING TANK TO RECOLLECT SOLID PARTS
3 FLAME BURNER CONTROLLED BY PROBES SET BY THE CONTROL PANEL
CONTROL PANEL WITH TOUCH SCREEN FIRE FIGHTING DEVICE WITH OPENING ELECTRO-VALVES, VOLUMETRIC COUNTER.
THE DEVICE IS INSTALLED BOTH ON THE DRUM AND ON THE COOLING BASIN
VALUE WITH REBUILT:
NEW DESTONER
OVERHAULED AFTERBURNER
REBUILT 90 KILO CE STANDARDS WITH 12 MONTH WARRANTYAUTOMATIC PROBAT ROASTER - 120 KILO
COMPLETE WITH :
LOADING HOPPER FOR GREEN COFFEE TO GO TO ROASTER
PNEUMATIC PLANT
INSULATION ON ALL PARTS OF MACHINE
AUTOMATIC SHUTTER WITH SAFETY POSITION AND LIMIT SWITCH
COOLING BASIN WITH ACCIDENT PREVENTIONS, SCRAPERS
HOT CIRCUIT WITH GAS BURNER COMPLETE WITH FAN WITH PARTIAL RECYCLE OF HOT AIR AND UNLOADING TANK TO RECOLLECT SOLID PARTS
3 FLAME BURNER CONTROLLED BY PROBES SET BY THE CONTROL PANEL
CONTROL PANEL WITH TOUCH SCREEN FIRE FIGHTING DEVICE WITH OPENING ELECTRO-VALVES, VOLUMETRIC COUNTER.
THE DEVICE IS INSTALLED BOTH ON THE DRUM AND ON THE COOLING BASIN
VALUE WITH REBUILT:
NEW DESTONER WITH SUCTION CUP AND DUMPER
NEW INSULATED BOX FOR AFTERBURNER WITH ADJUSTABLE THERMO REGULATORS
REBUILT 120 KILO CE STANDARDS WITH 12 MONTH WARRANTYQUANTITY: 1
Learn More - R-3273 PROBAT GG90 ROASTER - 90 KILOS
R-3273 PROBAT GG90 ROASTER - 90 KILOS
MODEL: GG90 COFFEE ROASTER
ORIGINAL YEAR: 1956
HAS BEEN RECENTLY REFURBISHED WITH NEW CONTROLS
NEW PNEUMATICS
IT WILL HAVE A NEW GAS TRAIN
PLEASE CONFIRM IF YOU NEED MAINS OR LPG NOZZLES
IT COMES WITH LPG NOZZLESALL NEW ELECTRICS, CIRCUIT BREAKERS, CONTACTS, SWITCHES, ETC. THE OLD CONTROL BOX IS USED TO HOUSE THE NEW COMPONENTS WITH THE ORIGINAL BACK-LIT PICTURE INDICATORS FUNCTIONING. PNEUMATICS ARE ADDED FOR CHARGING, DRUM DOOR OPENING, CHANGEOVER VALVE ON COOLING PAN EXHAUST/VACUUM STONE REMOVER AND COOLING PAN EMPTYING. A SEPARATE MOTOR FOR THE FLU FAN HAS BEEN ADDED. A NEW STAINLESS CHAFF COLLECTOR WILL BE INCLUDED. THE PAINT IS VERY SOUND AND ORIGINAL WITH NO CRACKING. THE GUNMETAL FINISH ON OUTER DRUM AND COOLING PAN JUST NEEDS A BIT OF BUFFING. A PROFILING TEMPERATURE CONTROLLER WITH TIMER WILL BE INSTALLED.
CURRENTLY SET UP IN THE FACTORY AND IN GOOD CONDITION.QUANTITY 1
Learn More