Search results for: 'Gas en'
-
TT-5544 SOLAR MARS100 TURBINE FOR COMPRESSING, 10 HOURS, YEAR 2021, VERSION: 16000SA CS/MDTT-5544 SOLAR MARS100 TURBINE FOR COMPRESSING, 10 HOURS, YEAR 2021, VERSION: 16000SA CS/MD SOLAR MARS100 TURBINE FOR COMPRESSING YEAR: 2021 HOURS: 10 TYPE: MECHANICAL DRIVE PACKAGE. NOT INSTALL THEM AT PRESENT STILL HAVE BEEN PARKED IN BOXES QUANTITY: 2 Learn More -
TT-8235 GE LM2500 TWIN SHANK GAS TURBINESTT-8235 GE LM2500 TWIN SHANK GAS TURBINES 1. GE LM2500 TWIN SHANK GAS TURBINES 2. GAS TURBINE BRAND: GENERAL ELECTRIC QUANTITY: 2 Learn More -
YY-3478 SOLAR MARS 100 HED 15000SAN 11.4MW SOLONOX (GENSET)YY-3478 SOLAR MARS 100 HED 15000SAN 11.4MW SOLONOX (GENSET) DETAILS: THIS UNIT IS FOR POWER GENERATION, NOT A COMPRESSOR PACKAGE. SO IT IS AN ENGINE WITH ALTERNATOR COMPLETE SET. THERE IS A HIGH DEMAND FOR GAS TURBINE POWER GENERATION EQUIPMENT HENCE IT WILL NOT BE ON THE MARKET FOR VERY LONG. QUANTITY: 1 UNIT Learn More -
TT-7861 TAURUS 65 GAS TURBINE GENERATOR SET, YEAR 2022, WITH ONLY 300 HOURSTT-7861 TAURUS 65 GAS TURBINE GENERATOR SET, YEAR 2022, WITH ONLY 300 HOURS 1. WITH ONLY 300 HOURS 2. TAURUS 65 3. 300 HOURS 4. YEAR 2022 5. THE DISMANTLED AND READY FOR DELIVERY 6. TAURUS 65 GAS TURBINE 7. INDUSTRIAL, SINGLE-SHAFT 8. 13 STAGE COMPRESSOR 9. VARIABLE INLET GUIDE VANES AND STATORS QUANTITY: 1 Learn More -
TT-4060-B GENERAL ELECTRIC LM2500 SAC COMPLETE POWER PLANT, 22MW, YEAR 2022, 5000 HOURS, 50HzTT-4060-B GENERAL ELECTRIC LM2500 SAC COMPLETE POWER PLANT, 22MW, YEAR 2022, 5000 HOURS, 50Hz WE OFFER TWO TURBINES AND GENERATOR ALONE OR THE TURBINE ALONE, GENERATION 2 QUANTITY: 2 Learn More -
M-5361 DEUTZ TBG 632V16 NATURAL GAS 9900MW POWER PLANT YEAR 1999 – COMPLETELY OVERHAULEDREFERENCE NUMBER: M-5361 (22018CCUDF1R) L DEUTZ TBG 632V16 NATURAL GAS 9900MW POWER PLANT YEAR 1999 – COMPLETELY OVERHAULED QUANTITY AVAILABLE: 1 Learn More -
TT-6960 BERGEN B36 45V20AG GAS POWER PLANT, 113 MW, YEAR 2024, 50/60 HzTT-6960 BERGEN B36 45V20AG GAS POWER PLANT, 113 MW, YEAR 2024, 50/60 Hz 1. POWER GENERATION PLANT 2. 113 MW 3. UNITS ARE STILL AT THE FACTORY 4. SINCE THEY ARE STILL AT THE FACTORY THEY CAN BE DELIVERED AS EITHER 50Hz OR 60Hz 5. BRAND NEW (YEAR 2024) 6. NATURAL GAS QUANTITY: 1 Learn More -
TT-7894 GE FRAME 5PA GAS TURBINE GENERATOR – NEW, 26MW, 60 HzTT-7894 GE FRAME 5PA GAS TURBINE GENERATOR – NEW, 26MW, 60 Hz 1. GE FRAME 5PA GAS TURBINE GENERATOR 2. BRAND NEW 3. BRAND: GENERAL ELECTRIC 4. CONDITION: BRAND NEW, NEVER INSTALLED QUANTITY: 1 Learn More -
TT-7760 GE MODEL 7EA 62,480 KW BASE RATED, 80,000 KW ISO RATED, COMBUSTION TURBINE GENERATOR SET, 60 Hz, YEAR 2007TT-7760 GE MODEL 7EA 62,480 KW BASE RATED, 80,000 KW ISO RATED, COMBUSTION TURBINE GENERATOR SET, 60 Hz, YEAR 2007 SCOPE OF SUPPLY 1. HP/LP STEAM DRUMS 2. HEAT TRANSFORMER MODULES 3. DEAERATOR SYSTEM 4. DUCT BURNER SYSTEM 5. ISOLATION, VENT & DRAIN VALVES 6. HP/LP FLOW ELEMENTS 7. LADDERS AND WALKWAYS 8. FIELD ASSEMBLY FITTINGS 9. EXCLUDED 10. EMISSIONS CONTROL 11. BOILER FEED WATER PUMP 12. EXHAUST STACK 13. TRANSITION DUCTS QUANTITY: 1 Learn More -
YY-3490 USED GE LM2500 GAS TURBINES, 6 UNITSYY-3490 USED GE LM2500 GAS TURBINES, 6 UNITS 1. STATUS: AVAILABLE 2. BRAND: GE 3. MODEL: LM2500 4. CONDITION: USED 5. WATTAGE: 18.64 MW 6. FUEL: LIQUID FUEL QUANTITY: 6 UNITS Learn More